This document is Amendment 006 to the Solicitation No. 70Z05025R43000002 for the Design-Build Sitka Waterfront Improvements project. The amendment extends the proposal due date to May 15, 2025, and includes responses to pre-proposal inquiries and revisions to various project specifications and drawings. Key changes include modifications to security fencing requirements, electrical service specifications, utility connections, design life expectations for waterfront structures, and clarifications on bid option items.

The amendment addresses numerous technical details across multiple project components, including the WLB wharf, approach pier, boat maintenance facility, and associated infrastructure. Significant revisions cover areas such as fender system design, electrical service configurations, fire protection systems, security measures, and utility installations. The document provides detailed guidance for contractors on design considerations, material specifications, and performance expectations for the different project elements, with specific attention to compliance with Coast Guard standards and local utility requirements.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1

1. CONTRACT ID CODE

I

PA

E OF PAGES

I 32

5. PROJECT NUMBER (If applicable)

7198749

CODE

3. EFFECTIVE DATE

05/02/2025

702050 CODE I

4. REQUISITION/PURCHASE REQUISITION

73002PR250000005

7. ADMINISTERED BY (If other than Item 6)

Same as BLOCK 6

2. AMENDMENT/MODIFICATION NUMBER

6. ISSUED BY

US Coast Guard

FDCC Seattle

915 2nd Ave, #2664

Seattle, WA 98174

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

70Z05025R43000002

9B. DATED (SEE ITEM 11)

NMACC 111, Unrestricted Pool 1, contract holders 03/06/2025

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE I FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

� The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor D is not X is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

RE: Task Order Announcement #70Z05025R43000002 for Design-Build SITKA WATERFRONT IMPROVEMENTS

The purpose of this Amendment is to distribute responses to Pre-Proposal Inquiries with associated attachments and extend the Proposal Due Date to May 15, 2025. See Continuation Sheets.

NMACC contract holders are reminded to acknowledge this amendment when submitting a Proposal Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of parson authorized to sign) (Signature of Contracting Officer)

R

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

5/022025

Tracianne Torklep

70Z05025R43000002

SECTION SF 30 BLOCK 14 CONTINUATION

PAGE SUMMARY OF CHANGES

AMENDMENT 006

Enclosed documents and incorporated into the Solicitation:

Amendment 006_Appendix A Revisions CI 5532.1 Physical Access Control FOUO DHS Instr Manual Physical Security 121-01-010-01 Force Prot Physical Security ATFP CIM_5530_1C Sitka Electric Utility Construction Guidelines

A. GOVERNMENT RESPONSES TO PRE-PROPOSAL INQUIRIES (PPIs)

I. CHANGES TO SPECIFICATIONS AND APPENDICES

RFP SECTION 01800 1.1.1.1 Project Description (Base Bid)

REMOVE:

Provide a hardened security fence that matches the existing security fence around the expanded footprint. Demolish fencing between C and C1 in conjunction with installation of expanded security fence. Existing vehicle gate to remain for the base bid; see bid options for removal of existing gate and installation of new a gate.

INSERT:

Demolish existing security fencing around the entire site. Remove existing manual vehicle entrance sliding gate.

RFP SECTION 01800 1.1.1.1 Bid Option 2

REMOVE:

Remove existing manual vehicle entrance sliding gate and portion of existing fence in conflict with new fence alignment.

Provide a hardened security fence with new sliding vehicle gate and pedestrian gate that matches the existing security fence around the expanded footprint. Vehicle gate location may be adjusted to optimize site layout.

INSERT:

Provide a hardened security fence around the expanded footprint with new sliding vehicle gate and pedestrian gate. Vehicle and pedestrian gate location may be adjusted to optimize site layout.

RFP SECTION 01800 1.1.1.2 Physical Security Countermeasures

REMOVE: The building is to comply with the 2021 version of the Risk Management Process (An Interagency Security Standard, (ISC)). This standard is applicable to buildings in the United States occupied by federal employees for nonmilitary activities. The Facility Security Level (FSL) determination for this building is Level 1 per Table 1 of the ISC.

Level 1 buildings face a minimum level of risk, and the baseline Level of Protection (LOP) for a Level I facility is minimum. The integration of countermeasures is in accordance with ISC Appendix B – Countermeasures. Appendix B - Countermeasures is marked For Official Use Only (FOUO)

There is no access control system or intrusion detection system included. The exterior personnel doors have mechanical keyed locks and the exterior equipment doors have key operated exterior controls.

The exterior windows are fixed and do not include man-bars.

INSERT: Anti-Terrorism/Force Protection (ATFP): Design the facility in accordance with US Coast Guard Security Standards including COMDTINST M5530.1C Physical Security and Force Protection Manual. Design the facility in accordance with the DHS Instruction Manual 121-01- 010-01 Physical Security. US Coast Guard has not formally adopted Unified Facilities Criteria (UFC) 4-010-01. Meeting additional UFC 04-010-01 Standards is encouraged, but not required and must be closely coordinated with the US Coast Guard to prevent mission impacts.

There is no intrusion detection system included. See Section 01800 1.14.1 for physical access control systems (PACS) requirements.

The exterior windows are fixed and do not include man-bars.

RFP SECTION 01800 1.4.1 Project Site/Existing Conditions

REMOVE: Parking and laydown areas will be provided with stormwater drainage and site lighting within the property. A hardened security fence with a pedestrian gate that matches the existing security fence around the expanded footprint will be installed, with the bid option for the removal and installation of a new vehicle sliding gate and pedestrian gate to optimize the site layout. The existing ATON yard will be relocated within the site to allow for traffic and personnel flow between parcels C and C1, and the existing fencing between these parcels will be demolished in conjunction with the installation of the expanded security fence.

INSERT: Parking and laydown areas will be provided with stormwater drainage and site lighting within the property. The existing ATON yard will be relocated within the site to allow for traffic and personnel flow between parcels C and C1, and the existing fencing between these parcels will be demolished in conjunction with the installation of the expanded security fence. As part of bid Option Item 2, provide and install a hardened security fence, as defined by Chapter 2 of the “Force Prot Physical Security ATFP CIM_5530_1C” document, around the expanded footprint.

Provide and install a new sliding gate, as well as a pedestrian gate that matches the new security fence that optimizes the site layout.

RFP SECTION 01800 1.4.7.2 Water Demand

REMOVE: PVC Plastic Piping, ASTM B 1785, minimum schedule 40, SDR to provide minimum 150 psi pressure rating. Fittings, ASTM D 2466. Not acceptable for pier, wharf or dock locations.

2. Gate Valve smaller than 3 inches:

MSS-SP-80, Class 150, solid wedge, non-rising stem.

3. Piping materials sized 4 inch to 12 inch:

Ductile-Iron, AWWA C151 with cement-mortar lining.

Polyvinyl Chloride (PVC), AWWA C900 with cast iron pipe equivalent outside diameter.

Not acceptable for pier, wharf or dock locations.

High Density Polyethylene (HDPE), ASTM F714, pipe and fittings manufactured from a PE 3408 resin that meets ASTM D3350 with a cell classification of 345464C. Materials shall have a 150 psi rated working pressure. Join all pipe and fittings by either butt fusion or flanges as per manufacturer’s recommendation. No mechanical joints are allowed. Butt fusion fittings meet ASTM D3261.

4. Flanged joints meet ASTM D3261. Not acceptable for pier, wharf or dock locations.

Joints and Jointing materials shall be AWWA C111/A21.11 push-on or mechanical joints for Ductile-iron Pipe. Polyvinyl Chloride (PVC) pipe joint and jointing material shall be push-on ASTM D 3139. Compression-type joints/mechanical joints can be used as joints between pipe and metal fittings, valves, and other accessories. Gaskets shall be provided.

Plastic pipe and fittings shall bear the seal of the National Sanitation Foundation (NSF) for potable water service. Plastic pipe and fittings shall be supplied by the same manufacturer. Not acceptable for pier, wharf or dock locations

INSERT: PVC Plastic Piping, ASTM B 1785, minimum schedule 40, SDR to provide minimum 150 psi pressure rating. Fittings, ASTM D 2466. Not acceptable for pier, wharf or dock locations.

2. Gate Valve smaller than 3 inches:

MSS-SP-80, Class 150, solid wedge, non-rising stem.

3. Piping materials sized 4 inch to 12 inch:

Ductile-Iron, AWWA C151 with cement-mortar lining.

Polyvinyl Chloride (PVC), AWWA C900 with cast iron pipe equivalent outside diameter.

Not acceptable for pier, wharf, or dock locations.

High Density Polyethylene (HDPE), ASTM F714, pipe and fittings manufactured from a PE 3408 resin that meets ASTM D3350 with a cell classification of 345464C. Materials shall have a 150-psi rated working pressure. Join all pipe and fittings by either butt fusion or flanges as per manufacturer’s recommendation. No mechanical joints are allowed. Butt fusion fittings meet ASTM D3261. Flanged joints meet ASTM D3261. Not acceptable for pier, wharf, or dock locations.

4. Joints and jointing material shall be AWWA C111/A21.11. Push-on or mechanical joints for Ductile-iron Pipe. Polyvinyl Chloride (PVC) pipe joint and jointing material shall be push-on ASTM D 3139. Compression-type joints/mechanical joints can be used as joints between pipe and metal fittings, valves, and other accessories. Gaskets shall be provided.

5. Plastic pipe and fittings shall bear the seal of the National Sanitation Foundation (NSF) for potable water service. Plastic pipe and fittings shall be supplied by the same manufacturer. Not acceptable for pier, wharf, or dock locations. This is not to exclude the fitting types, but to exclude PVC carrier on pier, wharf, or dock.

RFP SECTION 01800 1.4.8.2 Sanitary Sewer Oil Water Separator

REMOVE: N/A

INSERT: 1.4.8.2 Sanitary Sewer Oil Water Separator Contractor shall provide bilge and oily waste (BOW) oil water separator per UFC 4-150-02 3-6 to support the WLB.

RFP SECTION 01800 1.4.12 Site Physical Security

REMOVE: The option to provide a new passive vehicle control gates shall be provided for the access to the site. Gate shall be single slide gate intended to limit traffic access to the site in the event of a high security threat on base. The gate shall have a latch and locking mechanism for a keyed lock. Individual gate lock and multiple keys shall be provided. The gate bars should be painted safety yellow. Provide 6 foot high, black, decorative wrought iron security fencing around the perimeter of the property in compliance with the Physical Security Manual COMDTINST M5530.1C., match existing fence type and style. Provide lockable gates as shown on the site plan. Posts/supports are to be located on the inside of the fencing. All fastening and hinge hardware shall be secured by peening or welding. No fence will be located so that the features of the land or structures defeat it purpose by allowing passage over, around, or under the fence. The fence is to be 6 feet high with 5.5 feet of fence slats and a 6 inch top guard constructed of upward vertical angle. Fence shall be installed per ASTM F567-11. The perimeter fencing and gates shall be grounded.

INSERT: Provide a new passive vehicle control gate to provide access to the site in Option Item

02. Gate shall be single slide gate intended to limit traffic access to the site. Provide lockable gates as shown on site plan, the gates shall have a latch and locking mechanism for a keyed lock.

Individual gate lock and multiple keys shall be provided. The gate bars should be painted safety yellow. Gate security requirements is to be in compliance with the “Force Prot Physical Security ATFP CIM_5530_1C” document. Provide security fencing around the perimeter of the property in compliance with the “Force Prot Physical Security ATFP CIM_5530_1C” document. Fence shall be installed per ASTM F567-11.

RFP SECTION 01800 1.4.13 Gate Operator

REMOVE: The option to provide a new passive vehicle control gate shall have a motorized sliding gate at the main entrance as shown on the site plan. Provide security cameras for observation of each of the entrances, feeding back to the Communications Center. Provide Surveillance equipment, controls and connections for sliding gate operation as follows:

a. Entry: Provide card reading controls with intercom outside the gates and provide intercom and controls in the Communications Center connected so that: 1) entry of the correct code on the keypad shall operate the gate; 2) intercoms shall provide direct communications between vehicle occupants at the gate with the withstander in the Communications Center; 3) activation of a pushbutton at the Watchstander location in the Communications Center shall operate the gate.

b. Exit: The gate shall open automatically upon vehicle approach. The gate shall remain open until vehicular traffic has completely passed beyond the gate and shall then close automatically. The operator for the gate shall be [Swing gate operator / Roll gate operator / Barrier gate operator] and shall at a minimum operate within the following parameters:

1. Roll gate operators: 1 ft/sec

See Paragraph 1.13 and 1.14 for additional electrical and communication requirements

INSERT: The new passive vehicle control gate to provide access to the site in Option Item 02 shall have a motorized sliding gate at the main entrance as shown on the site plan. Provide security cameras for observation of each of the entrances, feeding back to the existing US Coast Guard office building on Tract C. Provide Surveillance equipment, controls and connections for sliding gate operation as follows:

a. Entry: Provide card reading controls with intercom outside the gates and provide intercom and controls in the existing US Coast Guard office building on Tract C: 1) See Paragraph 1.14.1 for access cards that shall operate the gate; 2) intercoms shall provide direct communications between vehicle occupants at the gate to the location of the CCTV monitors in the existing US Coast Guard office building on Tract C; 3) activation of a pushbutton at the location of the CCTV monitors in the existing US Coast Guard office building on Tract C shall operate the gate.

b. Exit: The gate shall open automatically upon vehicle approach. The gate shall remain open until vehicular traffic has completely passed beyond the gate and shall then close automatically. The operator for the gate shall be [Swing gate operator / Roll gate operator / Barrier gate operator] and shall at a minimum operate within the following parameters:

1. Roll gate operators: 1 ft/sec

See Paragraph 1.13 and 1.14 for additional electrical, security, and CCTV requirements.

RFP SECTION 01800 1.8.3 Design Life

REMOVE: The design life of all of the waterfront structural concrete and steel components of the new approach pier, wharf, floating dock, mooring dolphin, and gangway shall be a minimum of 75 years. The design life shall ensure continued use of the structural component with no reduction in strength, function, and use during design life. Steel materials shall be sized for corrosion loss over the service life. Passive cathodic protection anodes may be used with the assumption that the anode life is a minimum of 25 years before they are replaced. Fiberglass and plastic materials shall include UV resistance for the required service life. The design life of the foam-fenders, fender chains and fender rub strips shall be a minimum of 35 years prior to the need for reconditioning or replacement.

INSERT: The design life of all the waterfront structural concrete and steel components of the new approach pier, wharf, and mooring dolphin shall be a minimum of 75 years. The design life of all the waterfront structural concrete and steel components of the new floating dock, and gangway shall be a minimum of 50 years. The design life shall ensure continued use of the structural component with no reduction in strength, function, and use during design life. Steel materials shall be sized for corrosion loss over the service life. Passive cathodic protection anodes may be used with the assumption that the anode life is a minimum of 25 years before they are replaced. Fiberglass and plastic materials shall include UV resistance for the required service life. The design life of the foam-fenders, fender chains and fender rub strips shall be a minimum of 35 years prior to the need for reconditioning or replacement.

RFP SECTION 01800 1.8.11.4 Design Loads

REMOVE: Live Loads (UNO)

Uniform 600 psf

Concentrated 75-ton mobile crane outrigger

(each distributed on a 4’x4’ cribbing pad)

Vehicular Live Loads AASHTO HS20-44

20-ton Dual Axle Magni Telehandler in transit with load

75-ton mobile crane 9-ton Buoy Storage on Deck distributed over a 12” x 24” block

INSERT: Live Loads (UNO)

Uniform 600 psf

Concentrated 70-ton mobile crane outrigger

(each distributed on a 4’x4’ cribbing pad)

Vehicular Live Loads AASHTO HS20-44

20-ton Dual Axle Magni Telehandler in transit with load

70-ton mobile crane 9-ton Buoy Storage on Deck distributed over a 12” x 24” block

RFP SECTION 01800 1.8.18 Fender System

REMOVE: The WLB must minimize its standoff distance from the wharf for crane operations.

The current fender system on the timber wharf is 24” diameter composite plastic camels backed by timber fender piles and maintained in position by floating chain guides with concrete “dead-men” weights at the chain ends. This system allows the camels to rise and fall with the tidal changes. The system is reportedly serving the WLB well. The DOR shall replicate this fender system on the new wharf with the exception that the timber fender piles will be replaced with 13” diameter composite plastic or fiberglass piles which are resistant to marine borer decay and do not leach harmful chemicals into the sea. Use “hardened” steel hanging chain to avoid premature wear from wave action.

INSERT: The WLB must minimize its standoff distance from the wharf for crane operations.

The current fender system on the timber wharf is 24” diameter composite plastic camels backed by timber fender piles and maintained in position by floating chain guides with concrete “dead-men” weights at the chain ends. This system allows the camels to rise and fall with the tidal changes. The system is reportedly serving the WLB well. The DOR shall replicate this fender system on the new wharf with the exception that the timber fender piles will be replaced with composite plastic or fiberglass piles which are resistant to marine borer decay and do not leach harmful chemicals into the sea. The DOR may utilize rubber fenders behind the upper wale, if the fender dimension does not increase the offset by more than 12". Use “hardened” steel hanging chain to avoid premature wear from wave action.

RFP SECTION 01800 1.13.1 Electrical Service

REMOVE: Provide electrical service to new Waterfront Facilities Shore Power Switchboard from Sitka City Electric Department. The design intent, to be coordinated with the power utility, is to loop through the existing service transformer to a new, pad mounted, 1250kVA, 480Y/277V secondary transformer with new switchboard including utility metering in compliance with the City of Sitka standards.

INSERT: The Contractor shall coordinate with the City of Sitka Electric Utility (Electric Utility) for a new, primary metered service to the US Coast Guard site and decommissioning of the existing US Coast Guard power service to the site. Primary meter and meter vault including primary work upstream will be by the Electric Utility. The Contractor shall provide a new padmount transformer to serve the US Coast Guard site, associated primary conduit and cable between the primary meter and the new transformer, and all secondary conduit, cable and equipment required to serve new and existing facilities at the US Coast Guard site. The padmount transformer size is estimated at 1250kVA, 480Y/277V secondary. Service switchboard shall be provided and sized for the loads to be served. The Contractor shall provide metering of the US Coast Guard service in agreement with US Coast Guard metering standards (See section 1.13.5).”

RFP SECTION 01800 1.14.1 Security System

REMOVE: Security systems shall be intrusion detection systems (IDS). Provide intrusion detection systems, including all wiring, equipment and components required to provide intrusion coverage for the new FRC floating dock, new WLB pier, new boat maintenance facility, and coverage of newly acquired Tract C1 located in the existing USCG office building on Tract C.

Intrusion detection systems shall include a control panel, balanced magnetic switches on doors and operable windows, break glass sensors on windows, volumetric detectors, door access controls keypads, electric strikes, and other equipment as required to provide intrusion protection for the specified area. For an IDS protecting only a Weapons Storage Area (WSA), the control panel shall be installed inside the WSA.

1.14.1.1 The IDS shall be zoned and programmable so that the system can be set not to go into alarm when the programmed entry code is entered in the door access control for entry into a protected space when a protected space is occupied for normal operations.

1.14.1.2 Provide a secondary battery power supply for the system with capacity for system operation for a minimum of 24 hours standby followed by 15 minutes alarm. Provide a remote alarm, including red strobe light with horn rated 90 db at 10 feet.

INSERT: Security systems shall be physical access control systems (PACS). Provide PACS, including all wiring, equipment and components required to provide coverage for the sliding gate as part of bid Option Item 2, and all exterior doors to the FRC boat bay maintenance building as part of bid Option Item 1. The PACS is to be HSPD-12/FIPS 201 compliant with CAC per Chapter 10 of the “CI 5532.1 FOUO Physical Access Control (4 Jan 2023)” document.

RFP SECTION 01800 1.18.5.2.2 Excess Construction Dirt/Soil/Fill Removal and Disposal

REMOVE: Any excess soil/dirt/fill material generated as part of the project that is not required or suitable to complete on-site work shall not be considered, classified, or defined as an “unrestricted” use material. The Contractor shall transport and dispose of this material at an off-site permitted EPA RCRA Subtitle D Municipal Solid Waste Landfill that routinely accepts the type of material being removed from the site. The Contractor shall also meet all additional state and local landfill regulatory requirements.

INSERT: Any excess soil/dirt/fill material generated as part of the project that is not required or suitable to complete on-site work shall not be considered, classified, or defined as an “unrestricted” use material. The Contractor shall transport and dispose of this material at an off-site permitted EPA RCRA Subtitle D Municipal Solid Waste Landfill that routinely accepts the type of material being removed from the site. The Contractor shall also meet all additional state and local landfill regulatory requirements. Any excess dirt/soil/fill material, which has been verified to not exceed any federal, state, or local contamination thresholds for reuse and is otherwise suitable for use onsite, may be reused onsite or offsite at the arrangement of the Contractor in accordance with all additional state and local regulatory requirements.

RFP Appendix A – RFP Drawings

REMOVE: Appendix A, Sheets D1, C1, C2, C3, C4, C6, A2, E1, E2, E5, E6, WS-6, WS-7, WS-

10, WS-11,

INSERT: Appendix A, Sheets D1, C1, C2, C3, C4, C6, A2, E1, E2, E5, E6, WS-6, WS-7, WS- 10, WS-11, in this amendment. File names are as follows:

Amendment 006_Appendix A Revisions.pdf

II. THE FOLLOWING ANSWERS TO QUESTIONS/PRE-PROPOSAL INQUIRIES

ARE PROVIDED:

4. The SOW for the Existing Wind Turbine is inconsistent (discard, salvage to a local high school and/or reinstall on a new concrete foundation with new electrical and communication cables. Please confirm the RFP does NOT require the Contractor deliver the existing Wind Turbine to and specific location such as Mt. Edgecumbe Highschool.

Project Description:

"Dismantle and discard the existing wind turbine."

Civil and Sitework Design:

"This project includes the dismantling and discarding of an existing wind turbine structure and its foundation."

Drawing D1: Demolition Note #11 indicates, "REMOVE AND SALVAGE WIND TURBINE.

TRANSPORT TO THE MOUNT EDGECUMBE HIGHSCHOOL LOCATED AT 1330

SEWARD AVE, SITKA, AK 99835."

Basis of Design - Existing Wind Turbine Relocation:

"The site contains an existing wind turbine constructed by the City's historic society members, including Matt Hunters, and is to be relocated offsite. The existing wind turbine is bolted to a concrete foundation which needs to be removed and a new concrete foundation needs to be added to support the wind turbine at its new location. Any electric and communication cables need to be extended to the new location."

Answer: The existing wind turbine is to be dismantled and discarded. See Section 01800 Paragraph 1.1.1, Section 01800 Paragraph 1.4.1, and revised Appendix A Sheet D1 in this amendment.

5. The SOW for the Existing Wind Turbine is inconsistent (discard, salvage to a local high school and/or reinstall on a new concrete foundation with new electrical and communication cables. Please confirm the Contractor has NO responsibility to install a new concrete foundation or any electrical or communication cable for salvage or reuse of the Existing Wind Turbine.

Project Description:

"Dismantle and discard the existing wind turbine."

Civil and Sitework Design:

"This project includes the dismantling and discarding of an existing wind turbine structure and its foundation."

Drawing D1: Demolition Note #11 indicates, "REMOVE AND SALVAGE WIND TURBINE.

TRANSPORT TO THE MOUNT EDGECUMBE HIGHSCHOOL LOCATED AT 1330

SEWARD AVE, SITKA, AK 99835."

Basis of Design - Existing Wind Turbine Relocation:

"The site contains an existing wind turbine constructed by the City's historic society members, including Matt Hunters, and is to be relocated offsite. The existing wind turbine is bolted to a concrete foundation which needs to be removed and a new concrete foundation needs to be added to support the wind turbine at its new location. Any electric and communication cables need to be extended to the new location."

Answer: See the response to PPI #4.

6. Basic Wind Speed (Per ASCE 7) specified in 01800-1.8.6 are indicated to be 150 mph. Wind Velocity is also called out in the Basis of Design in several locations with varying Wind Speeds.

Please confirm the contractor is to follow the specified Wind Speed for the Specified SOW item as shown below for Waterfront Structural and Structural.

Waterfront Structural

1) WLB Wharf: 100 mph Wind Speed on the wharf & berthed vessel; and 130 mph Wind Speed on the vacant berth wharf structure.

2) Approach Pier: 130 mph Wind Speed on the pier structure.

3). FRC Floating Dock: 130 mph on the exposed dock surfaces of the vacant dock; 100 mph on a 154 FRC moored on one side + the exposed dock surfaces not shaded by the ship; and 75 mph on a (2) nested FRCs + the exposed dock surfaces not shaded by the ships.

Structural - Design Criteria

Design Wind Speed (Ultimate): 150 mph.

Answer: The Contractor is to use the wind speeds as specified in the RFP.

8. There are inconsistencies between the RFP Drawings and the Basis of Design. Please confirm that the USCG and SHPO have agreed that a gable roof with 4:12 slope is acceptable for the PEMB to be constructed by the Contractor.

Drawing A2:

Detail A2 on Drawing A2 indicates a gable roof (standing seam) with a 4:12 slope.

Basis of Design - Architectural Compatibility

The Boat Bay Building form and exterior colors are to match closely to the nearby Station Building. Per the State Historic Preservation Office (SHPO) requirements the design of the new facility is required to be compatible with the look of the type of building, landscape, and spaces that were in Sitka in World War II with similar massing, gable roof lines at 3:12 slope, horizontal siding that mimics wood clapboard siding, and fenestration. Additionally, SHPO requires that new facilities be no taller than necessary, as measured to the tip of the gable roof, to accommodate boats and equipment and support of maintenance requirements. The new building height will be minimized, to the extent possible, and limited to 30 height.

Basis of Design - Roof System

The roof slope will be 3:12. The roof panel will be a 36-inch wide by nominal 4-inch-thick composite insulated standing seam roof panel which contains interior and exterior metal faces surrounding a foam core.

Answer: A gable roof with 4:12 slope is not acceptable. Provide a gable roof with 3:12 slope. See revised Appendix A Sheet A2.

9. There are inconsistencies between the RFP Drawings and the Basis of Design. Please confirm that the USCG and SHPO have agreed that prefinished metal siding panels are acceptable for the exterior of the PEMB to be constructed by the Contractor.

Drawing A2:

Detail A2 on Drawing A2 indicates prefinished metal siding panels for the exterior material.

Basis of Design - Architectural Compatibility

The Boat Bay Building form and exterior colors are to match closely to the nearby Station Building. Per the State Historic Preservation Office (SHPO) requirements the design of the new facility is required to be compatible with the look of the type of building, landscape, and spaces that were in Sitka in World War II with similar massing, gable roof lines at 3:12 slope, horizontal siding that mimics wood clapboard siding, and fenestration. Additionally, SHPO requires that new facilities be no taller than necessary, as measured to the tip of the gable roof, to accommodate boats and equipment and support of maintenance requirements. The new building height will be minimized, to the extent possible, and limited to 30 height.

Basis of Design - Wall Cladding

The building wall system will feature prefinished single-skin metal panel siding mounted on an insulated metal panel backup wall, utilizing one-piece panels that extend from base to eave. Both the exterior and interior panels will be constructed from G90 galvanized steel, finished with a durable fluoropolymer coating on the exterior and a polyester color coat on the interior.

Answer: Provide prefinished single skin metal panel siding to resemble horizontal clapboard siding and meet SHPO requirements as described in Section 01800 1.7.5.1.5 and graphically shown in the elevations on Sheet A2.

10. Site Note #9 indicates "Security Fence". Are the new Security Fence and gates required to grounded? If yes, then please specify the grounding requirements.

Answer: The Contractor shall include in their bid, costs associated with grounding the fence around the City of Sitka Electric Utility switchgear and service transformer. During construction, the selected Contractor shall coordinate with the City of Sitka for coordination of bonding and grounding with their equipment installation. The rest of the security fence is to be grounded if necessary per Chapter 2 of the “Force Prot Physical Security ATFP CIM_5330_1C” document.

21. Will existing floating dock still be used once the WLB Wharf is constructed? Seems it will be “locked in” by the Approach Pier.

Answer: The existing floating dock will remain in use if bid Option Item 3 is not awarded.

If bid Option Item 3 is awarded, the existing floating dock will remain, but it will no longer be in use. See revised Appendix A, Sheet C1 in this amendment for additional clarification.

28. Are there any designated areas where floating equipment, such as floating cranes and barges, be stored when not performing work.

Answer: There are no designated areas. The US Coast Guard will allow floating construction equipment to be stored between the existing wharf and the north end of the cove, as long as it does not project beyond the outboard face alignment of the existing wharf (which would impede the channel width). Stored floating equipment shall also maintain a 50' clearance from the Bouy Tender when it is berthed and a 30' wide clearance for US Coast Guard small boats between small boat floating dock and the main channel.

After award, the Contractor is to coordinate with the local operational US Coast Guard units if additional space is temporarily necessary.

29. What are the limits of work on the water side for operation of floating equipment.

Answer: Contractor shall limit the intrusion of his floating equipment to 120’ or less into the channel, as measured from the outboard face of the new wharf and float alignment. Floating equipment which extends more than 60’ into the channel from the face of the new wharf and float alignment must have navigation lights and be actively manned.

After award, the Contractor is to coordinate with the local operational US Coast Guard units if additional space is temporarily necessary.

30. Are there standoff distances that must be maintained while WLB and small boats are present at berth or loading and unloading.

Answer: Maintain a 30' wide clearance from the US Coast Guard small boats at berth and 50' from the WLB. After award, the Contractor is to coordinate with the local operational US Coast Guard units if additional space is temporarily necessary. The Contractor is to coordinate the work schedule with the WLB berth schedule to avoid conflict within these limits.

35. Is there excavation or removals required to construct the Approach Pier Abutment?

Answer: Refer to RFP Appendix A, drawing sheets D1, C2, C3, C6, & WS-6. Riprap may need to be temporarily stockpiled, then restored to install abutment piling. Riprap may need to be removed and excavated to place abutment, wingwalls, and approach apron.

Grading is required for sitework. Per Section 01800 1.5.3, provide excavation for foundations. See revised Appendix A, sheet C6 in this amendment.

44. RFP states "The DOR shall replicate this fender system on the new wharf with the exception that the timber fender piles will be replaced with 13" diameter composite plastic or fiberglass piles." Please confirm that the 13" diameter composite or fiberglass piles shall be used for bidding purposes, but if found during the design analysis to not provide adequate mooring/berthing resistance, this would be a changed condition subject to modification.

Answer: See revised Section 01800 1.8.18. The 13” diameter pile size in the drawings of Appendix A is approximate. The design of the wharf fender system is the responsibility of the DOR. Per the RFP Section 01800 1.8.18, the fender pile solution must consist of fiberglass piles filled with concrete or reinforced plastic piling. The DOR shall select the pile properties to meet the WLB berthing load requirements. The actual solution that the Contractor uses for pile size is not a changed condition.

45.1 Amendment 0004 RFI# 45 for the Sitka Waterfront project asked if the entire standpipe system should be 316 stainless steel. The RFI response stated to follow the requirements of Section 01800 1.10.2.2 which is as follows:

A316 stainless steel schedule 40 vertical fire department connection pipe will be installed adjacent to the entrance of the new main approach pier and shall be routed to the new hose connection manifolds located around the pier. The fire department connection piping will contain a low point drain to allow the water that collects in the vertical standpipe to drain and prevent freezing within the pipe. The fire department connection shall be two 2 ½” outlet connections, cap, and chain, or of a type required by the Sitka Fire department. The fire department connection shall be placed out of the collapse zone of any adjacent building, but no further than 100’-0” from the nearest ire hydrant. The piping serving the fire department connection will contain a swing check valve to prevent the flow of water in the wrong direction. Each new hose connection manifold will be (2) 2 ½” bronze hose valves, unless otherwise specified by the Sitka Fire Department.

In reading this spec section we are interpreting that 316 stainless steel is required for the vertical fire department and the horizontal piping runs around the pier. This is an extremely expensive option and not a typical requirement.

We are accustomed to seeing the vertical fire department connections be 316 stainless steel but the horizontal dry standpipe run being schedule 40 galvanized steel.

Can you please clarify the response to RFI #45 to address if it is required for the entire dry standpipe run to be 316 stainless steel or if just the vertical fire department connections are required to be 316 stainless steel.

Answer: This response amends the response to PPI #45 in Amendment 004.

As defined in Section 01800 1.10.2.2, 316 stainless steel schedule 40 is required for the entire dry standpipe system, which includes the horizontal piping runs around the pier.

46. Sheet C1 shows WLB dolphin as base bid. Sheet WS-5 shows new dolphin as bid option 3.

Please clarify.

Answer: The dolphin is part of bid Option Item 3. See revised Appendix A, sheet C1 in this amendment.

55. The RFP does not specify that an Incidental Take Regulation (ITR) has been acquired from U.S. Fish and Wildlife Service; however, based on conversations with the agency, it is expected that a proposed regulation for this project will be published in the Federal Register in the near future. Would this ITR become a contract document? Can the Government provide the application?

Answer: Once available, the Government will provide a copy of the published Incidental Take Regulations (ITRs); its publication is expected by July 15, 2025. The Contractor shall abide by all ITR regulations. The Contractor will assume all Best Management Practices (BMPs) found in the Environmental Assessment, and assume practices related to Marine Mammals Protection (MMP) and Endangered Species Acts (ESA) will be applicable/required for the project. Additional BMPs not listed in Environmental Assessment, but required by the published ITR will be considered changed site conditions.

62. Section 01800-1.1.1 states the fencing shall be "hardened". Section 1.4.12 states fencing shall be IAW COMDTINST M5530.1C which does not speak to "hardened" fencing. Please confirm requirement of "hardened" fence and if required please provide requirement for "hardening".

Answer: COMDTINST M5530.1C defines "Hardened" as a security fence that is specifically designed to resist unauthorized access, tampering, and physical attack. See revised Section 01800 1.1.1, 1.4.1, and 1.4.12.

63. RFP Drawings E-1 shows the removal of electrical service to the existing wharf. RFP Section 01800 1.4.1 states, "The scope of work includes the demolition and capping of unneeded utilities". Please clarify whether all existing utilities must be removed from the existing wharf, or just the electrical? If not, please confirm remaining water and sewer lines do not require electricity.

Answer: The new electrical service will feed to the existing approach and will connect to the existing electrical distribution system near the near the existing site transformer that is to be demolished after completion of the new wharf. Reference RFP Appendix A, sheet E6 for required electrical connections. Existing utilities on the existing wharf are to remain.

See Appendix A, sheet D1 for utility demolition, and sheet E1 for electrical demolition.

70. Minimum standoff of the fender system is desired, and the contractor shall replicate the existing fender system but use concrete filled fiberglass piles. It does not appear that there will be room for an energy absorbing fender at the top of the fender pile. If required by the fender designer, can the standoff of the fender piles be increased to allow for the addition of a fender element between the top of the pile and the wharf?

Answer: See revised Section 01800 1.8.18.

75. Paragraph 1.1.1.2 indicates the Boat Bay building is Level 1 and to follow the countermeasures in accordance with the 2021 version of the Risk Management Process ISC standard Appendix B. Please provide Appendix B to the ISC document.

Answer: See revised RFP Section 01800 1.1.1.2, enclosed “DHS Instr Manual Physical Security 121-01-010-01”, and enclosed “Force Prot Physical Security ATFP CIM_5530_1C” in this amendment.

76. Is the contractor to assume the FRC and WLB cutters’ CHT (collection, holding and transfer) system pumps have the capacity to transfer waste via the 3 in forced main to the existing manhole on shore at which point the existing gravity sanitary sewer system will take over? Or will the contractor be required to provide a lift station to transfer sanitary sewer waste to the existing manhole on shore at which point the existing gravity sanitary sewer system will take over?"

Answer: For bidding purposes, assume FRC and WLB system pumps have sufficient capacity to pump sewer using force main to existing shore sewer systems without additional lift station and holding tanks. Contractor is to verify with their own sewer calculations whether a lift station is required.

77. The RFP drawings and Basis of Design call for a 3” sanitary sewer force main from the shore-ties to the ashore manhole. UFC 4-150-02 Dockside Utilities paragraph and FRC ILSP Appendix E specify a 4” line.

Please clarify what is required to be provided in regard to the sanitary sewer (i.e. the 3” force main as shown on RFP Sheet C4 and RFP Basis of Design titled Wet Utilities Sanitary Sewer or if a 4" line is required per FRC ILSP and UFC 4-150-02).

Answer: Use a 4” sewer force main per UFC 4-150-02 and FRC ILSP Appendix E. See revised Appendix D, sheet C4 in this amendment.

78. UFC 4-150-02 Dockside Utilities

See paragraph 6-1 for ‘Freeze Protection’. Sitka is in Region I (Severe) according to Figure B-1;

see below; Seattle is in Region IV (Mild). Can Sitka can be considered a milder region than Region I?

Answer: Sitka is to be considered Region I (Severe) per Figure B-1 of UC 4-150-02.

79. RFP Basis of Design Stakeholder Comments (Appendix) has an unanswered comment pertaining to the need for freeze protection, "Q. 138, Waterlines /Sewer lines may freeze on pier is there any freeze mitigation besides heat tape? " Please provide an answer to this question.

Answer: Provide insulated water and sewer lines on the pier per the relevant pier building codes.

80. Confirm the Existing site Utility Transformer and the existing primary cabling is property of City of Sitka Electric and is to be removed by the utility company and the remaining empty conduit/vault systems are to be abandoned in place.

Answer: Existing transformer and primary cabling are owned by the City of Sitka and will be removed by them once existing facilities have been transferred to alternate power.

81. Sheet E1 requires the pole light and pole bases to be demolished. Is the UG Conduit/wire required to be removed also?

Answer: See revised Appendix A, sheet E1 in this amendment.

82. Sheet E1 clearly shows the removal of the existing site utility transformer and that the existing secondary between the utility transformer and Service Switchboard is to be removed once the new electrical system is in place. Sheet E6 shows feeding the existing pier from the new switchboard, none of the provided plan sheets show how this feeder is to be routed or how the existing pier service is to be refed. Confirm how the existing switchboard is to be refed? Is it possible to re-use the existing service primary/ and secondary conduits to refeed the existing wharf electrical service?

Answer: The Contractor shall determine routing during the design-build process. Existing service switchboard may be re-used with adjusted ampacity as required to maintain existing loads to remain.

83. Specification states that “The existing fire alarm control panel shall be evaluated to ensure it has the capacity to allow the installation of new notification and initiation devices.” Confirm if there is capacity in the existing fire alarm control panel to support new fire alarm installation.

Answer: The existing Simplex 4008 control panel is operating under normal conditions.

The Simplex 4008, according to the manufacturers data sheet, has the capacity for 200 addressable devices and has (2) Notification Appliance Circuits. The existing building is not using anywhere near 200 addressable devices and the remaining capacity of the NAC is unknown. The Contractor is to assume that a NAC booster panel may be required and is to verify whether or not it is necessary.

84. Plan Sheet E1 construction note 2 calls out for New Service Transformer by City of Sitka Electric Utility. Plan Sheet 5 note 2 states "Provide primary, loop feed padmount transformer with switching and fusing as shown. On Sheet 5 One line diagram 3 shows the pad mounted meter provided by City of Sitka Electric utility. Specifications are not clear as to who is to provide transformer and utility metering. Confirm that the City of Sitka Electric Utility is to provide the Primary Meter with Disconnect and new padmount transformer on new transformer vault.

Answer: The padmount primary meter/disconnect work is to be done by the City of Sitka.

The Padmount service transformer is to be provided by the Contractor. See revised Appendix A, sheet E5 in this amendment.

86. Please provide the City of Sitka Utility electrical installation guideline requirements for electrical service to the site.

Answer: See the enclosed “Sitka Electric Utility Construction Guidelines” document within this amendment. For more information visit:

https://www.cityofsitka.com/departments/Electric/electric-department-construction-guidelines

88. Spec Sections listed in respect to IDS/ACS requirements contradict each other. Confirm that IDS/ACS is not required for this project.

Answer: IDS is not a requirement for this project, but PACS is a requirement as part of bid Option Items 1 & 2. See revised RFP Section 01800 1.1.1.2 and 1.14.1 in this amendment.

89. Please confirm that Option Items will not be awarded seperately from the Base Bid Award or at a later date from the Base Bid Award.

Answer: Option Items that are exercised, if any, will be exercised at time of award. The Contractor shall mark its proposal valid up to 90 calendar days after receipt of the price proposal.

95. Refers to a minimum design life of 75 years for waterfront structural concrete and steel components. Due to the nature of float manufacturing, construction, and design characteristic restrictions (concrete coverage limitations over internal structural reinforcement), will a design life of 50 years be acceptable for the floating structure? Recent projects similar in scope and size published by the USCG have accepted these design criteria.

Answer: See revised Section 01800 1.8.3 in this amendment.

96. Refers module segments to be a minimum length of 20 ft. Will modular segments of 10 ft. in length be acceptable for shipping and handling purposes?

Answer: Per Section 01800 1.8.21.5 the minimum permitted length for a "match-cast" system of precast segments is 20 ft.

97. Refers to Cast-in-Place Concrete. Will Pre-Cast Concrete applications be exempt from the requirements stated in this section?

Answer: Section 01800 1.8.4.3 does not apply to precast concrete elements.

98. Will Fiber Reinforced Polymer (FRP) rebar be an acceptable replacement for internal concrete structural reinforcement?

Answer: Non-Corrosive composite reinforcing materials, such as FRP are allowed.

Research and Testing data must be supplied with the design calculations to support the design properties used, including deflection.

100. Spec section 1800 1.8.3 refers to a minimum design life of 75 years for waterfront structural concrete and steel components. Due to the nature of float manufacturing, construction, and design characteristic restrictions (concrete coverage limitations over internal structural reinforcement), will a design life of 50 years be acceptable for the floating structure? Recent projects similar in scope and size published by the USCG have accepted these design criteria.

Answer: See response to PPI #95.

101. Spec section 1800 1.8.21.5 refers module segments to be a minimum length of 20 ft. Will modular segments of 10 ft. in length be acceptable for shipping and handling purposes?

Answer:…