01d Price Proposal FORM.pdf

PDF 456 KB Posted

Attached to
Design-Build Sitka Waterfront Improvements (Sitka, AK)
Solicitation number
70Z05025R43000002
Issued by

About this file

This is a Price Proposal Form for the Design-Build Sitka Waterfront Improvements project, solicitation number 70Z05025R43000002, issued by the US Coast Guard. The project requires comprehensive design and construction services for a Coast Guard facility in Sitka, Alaska, with a total project performance period of 1,030 calendar days. The solicitation is structured with a Base Item and three Option Items, including: (1) a fixed Seagoing Buoy Tender (WLB) wharf and approach pier, (2) a boat maintenance facility, (3) landside sitework, and (4) a Fast Response Cutter (FRC) floating dock and mooring dolphin. The proposal form requires contractors to submit separate design and construction prices for each item, with a total combined price encompassing all base and optional elements. The document emphasizes that innovative or cost-saving proposals must be included in the total price, and contractors are warned that proposals containing conditional language may be rejected.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE PROPOSAL FORM

Design-Build Sitka Waterfront Improvements (Sitka, AK) Project # 7198749

Task Order Announcement # 70Z05025R43000002

Provide prices per the following structure. Project scope is divided into Base Item and Option Items, as indicated. See Specifications, Drawings, and Appendices, labeled Volumes I through III, for more detail.

BASE ITEM – Design-Build Wharf and Approach Pier All necessary supervision, labor, materials, transportation, equipment, permitting, and other necessary ancillary services to design and construct a new fixed Seagoing Buoy Tender (WLB) wharf, a new fixed approach pier, and associated infrastructure to homeport one WLB at USCG Sitka Mooring (Sitka, AK).

Design Price: $________________ Construction Price: $________________ Total Base Item Price: $________________

OPTION ITEM 1 – Design-Build Boat Bay Maintenance Facility.

All necessary supervision, labor, materials, transportation, equipment, permitting, and other necessary ancillary services to design and construct a new boat maintenance building and associated utility work.

Design Price: $________________

Total Option Item 1: $________________

OPTION ITEM 2 - Landside Sitework.

Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct landside sitework such as earthwork, demolition, paving, and utilities not included in Base Item or other option items.

Design Price: $________________

Total Option Item 2: $________________

OPTION ITEM 3 – Design-Build FRC Floating Dock and Mooring Dolphin

A. Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct waterfront, shore facilities, and associated infrastructure necessary to homeport one Fast Response Cutter (FRC). The work includes a new FRC floating dock and new gangway.

B. Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct a mooring dolphin, connected to the WLB wharf with a catwalk as described in the Specifications, Drawings and Appendices.

Design Price: $________________

Total Option Item 3: $________________

TOTAL PRICE (Base Item plus Option Items 1 through 3) $________________

Contractors that include language in their proposal containing conditions may be rejected.

BETTERMENT WILL NOT BE ACCEPTED. ALL INNOVATIVE, CREATIVE, OR COST SAVING

PROPOSALS ARE TO BE INCLUDED AS PART OF THE TOTAL PRICE. OFFERORS THAT

INCLUDE LANGUAGE IN THEIR PROPOSALS CONTAINING CONDITIONS MAY BE REJECTED.

TOTAL PRICE: The Total Price shall be deemed to include all costs required for all the specified work to be completed in accordance with the plans and specifications.

TOTAL PRICE (Base Item, Option Item 1, Option Item 2, and Option Item 3).

Options that are exercised, if any, will be exercised at time of award. $__________________