Amendment 001 extends the pre-proposal inquiry and proposal due dates for the U.S. Coast Guard's Sitka Waterfront Improvements Design-Build project by one week. The solicitation seeks comprehensive design and construction services for facilities at USCG Sitka Mooring, including a new Seagoing Buoy Tender (WLB) wharf and approach pier as the base item, with optional items for a boat maintenance facility, landside sitework, and a Fast Response Cutter (FRC) floating dock and mooring dolphin.

The contract performance period is 1,030 calendar days, with pre-proposal inquiries now due on April 11, 2025, and proposals due April 25, 2025. The project involves providing all necessary supervision, labor, materials, transportation, equipment, and permitting to design and construct infrastructure to homeport maritime vessels, with the government evaluating the total price for the base and optional items at the time of award. The solicitation is issued by the U.S. Coast Guard Seattle office under the NMACC III, Unrestricted Pool 1 contract.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

70Z05025R43000002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

A. GOVERNMENT RESPONSES TO PRE-PROPOSAL INQUIRIES (PPI)

AMENDMENT 001

001 We request a Bid Date (PROPOSAL) extension of 8 weeks from the time this PPI is answered.

In this competitive construction market, it is unreasonable to limit proposers to 4 weeks to ask PPIs and 6 weeks to submit a responsive and responsible bid on a $50 million Design-Build project, that includes over 2,500 pages of specifications. The USCG may already understand design teams need time to develop preliminary custom designs before Contractors can begin to plan their means and methods, find and coordinate with compliant subcontractors and suppliers, prepare a schedule, and estimate this project.

In addition, under this MACC contract, this pursuit overlaps in the region with the $190 million USCG Base Seattle task order project pursuit.

Contractors have limited estimating bandwidth to pursue multiple large-value projects at the same time. Time is of the essence to reply to this PPI for contractors to finalize a decision of whether to proceed working on this proposal.

RESPONSE The USCG’s response extends the following due dates by 1 (one) week:

AMEND 001 Pre-Proposal Inquiries (PPIs) are due 04-11-2025.

Proposals are due 04-25-2025.

All other terms and conditions remain unchanged.

NMACC Contract Holders are reminded to acknowledge receipt of this amendment when submitting their Proposal.

SITKA WATERFRONT

IMPROVEMENTS

Sitka, AK

General Information

Purpose of this pre-proposal conference is for informational purposes only and does not change the content of the Task Order Announcement which seeks a Request For Proposal (RFP).

This procurement is a Design-Build (D-B) RFP.

Questions must be submitted in writing and submitted via email to Tracianne.Torklep@uscg.mil and Gabriel.D.Perez@uscg.mil. No questions should be asked during the site visit.

Changes to the Task Order Announcement and responses to questions will only be made through the issuance of an amendment.

Key Players Pre-Award

Tracianne Torklep – Contracting Officer

Tracianne.Torklep@uscg.mil or 571 607-1536 (Seattle time zone = PDT)

Gabe Perez – Senior Field Contracting Officer

Gabriel.D.Perez@uscg.mil

Joe McKenna – Project Manager

Joseph.A.McKenna@uscg.mil

PROJECT BACKGROUND

& SOLICITATION INFORMATION

◦ Design and construct facilities to homeport Offshore Patrol Cutters (OPCs) and Fast Response Cutters (FRCs) at Base Kodiak. This phase of the project includes waterfront improvements, utilities, permits, and other site amenities.

◦ Performance Period: The contract performance period is 1,030 calendar days after award of Task Order for the Base Item and all Option Items.

◦ Pre-Proposal Inquiries (PPIs) are currently due on April 11, 2025.

◦ Proposals are currently due April 25, 2025. Both deadlines are subject to change via amendment.

◦ FAR 52.27- 4 Evaluation of Options Exercised at Time of Contract Award (June 1988) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate the total price for the basic requirement together with any option(s) exercised at the time of award.

Project Base and Option Items ◦BASE ITEM – Design-Build Wharf and Approach Pier.

All necessary supervision, labor, materials, transportation, equipment, permitting, and other necessary ancillary services to design and construct a new fixed Seagoing Buoy Tender (WLB) wharf, a new fixed approach pier, and associated infrastructure to homeport one WLB at USCG Sitka Mooring (Sitka, AK).

◦OPTION ITEM 1 – Design-Build Boat Bay Maintenance Facility.

All necessary supervision, labor, materials, transportation, equipment, permitting, and other necessary ancillary services to design and construct a new boat maintenance building and associated utility work.

◦OPTION ITEM 2 - Landside Sitework.

Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct landside sitework such as earthwork, demolition, paving, and utilities not included in Base Item or other option items.

◦OPTION ITEM 3 – Design-Build FRC Floating Dock and Mooring Dolphin.

A. Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct waterfront, shore facilities, and associated infrastructure necessary to homeport one Fast Response Cutter (FRC). The work includes a new FRC floating dock and new gangway.

B. Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct a mooring dolphin, connected to the WLB wharf with a catwalk as described in the Specifications, Drawings and Appendices.