70Z04720RTYEBDB_Amendment 0004.pdf

PDF 1 MB Posted

Attached to
REBUILD FACILITIES & WATERFRONT, STATION TYBEE ISLAND, USCG STATION TYBEE, COCKSPUR ISLAND, GA
Solicitation number
70Z04720RTYBEDB
Issued by

View the file

Other files

File Type Posted
70Z04720RTYBEDB_Amendment 0013.pdf PDF
70Z04720RTYBEDB_Amendment 0012.pdf PDF
70Z04720RTYBEDB_ Amend 0012_ pgs2of4.pdf PDF
USCG Station Tybee NEPA EA_DRAFT PUBLIC REVIEW 12222020 REV1.pdf PDF
AdeptZip_Tybee StationBldg_As-Builts.zip ZIP file
70Z04720RTYBEDB_Amendment 0011.pdf PDF
70Z04720RTYEBDB Amendment 0010.pdf PDF
TYBEE FINAL CIVIL C302R_26OCT20.pdf PDF
TYBEE FINAL CIVIL C301R_26OCT20.pdf PDF
70Z04720RTYEBDB_Amendment 0008.pdf PDF
TYBEE FINAL CIVIL C203R_26OCT20.pdf PDF
Amended_1.16 Telecomm Design - (002).pdf PDF
TYBEE FINAL CIVIL C300R_26OCT20.pdf PDF
TYBEE FINAL CIVIL C401R_26OCT20.pdf PDF
TYBEE FINAL CIVIL C303R_26OCT20.pdf PDF
TYBEE FINAL CIVIL C202R_26OCT20.pdf PDF
70Z04720RTYBEDB_Amendment 0007.pdf PDF
70Z04720RTYBEDB_Amendment 0006.pdf PDF
Amended_ISCS_pg 292.pdf PDF
Amendment 0005 Page 1.pdf PDF
70Z04720RTYBEDB_ Amend 0005_ pgs2-11.pdf PDF
Amended_1.16 Telecomm Design.pdf PDF
A103-Amended_10-19.pdf PDF
A102-Amended.pdf PDF
USCG Station Tybee NEPA EA_DRAFT 10092020.pdf PDF
A103-Amended.pdf PDF
70Z04720RTYBEDB_ Amend 0003_ pgs2-4.pdf PDF
Amendment 0003 Page 1.pdf PDF
70Z04720RTYBEDB_Amendment 0002.pdf PDF
70Z04720RTYBEDB_Amendment 0001.pdf PDF
Appendix E - Industry Standards for Const Docs-Sept2012.docx DOCX document
SOI_rehabilitation-guidelines.pdf PDF
AdeptZip_Mark Bryant_20200317_121920.zip ZIP file
OandM Part 1 Existing SAM Coast Guard Maintained Equipment.pdf PDF
Lightscape Management.pdf PDF
Appendix D - Design Narrative-Sept2012.docx DOCX document
Example of Facilities Preventative Maintenance Plan.pdf PDF
Appendix C -FDCC File Naming-SEP 2014.docx DOCX document
DB_Wage_Det_Heavy_GA_20200002_01_03_2020.pdf PDF
USCG STA Tybee_Sewage Mgmt Evaluation_FINAL_modified for solicitation.pdf PDF
OandM Part 3 SAM Job Plan.pdf PDF
29 RB-S on Trailer.pdf PDF
Appendix O and M_Tybee.pdf PDF
Appendix B -ElectDeliv-Sept2012.docx DOCX document
TOA_70Z04720RTYBEDB.pdf PDF
OandM Part 1 Existing SAM Coast Guard Maintained Equipment.xlsx XLSX spreadsheet
TANB General Arrangement.pdf PDF
29 RB-S Information.pdf PDF
Appendix A-ComputerGenDrwgs-Sept2012.docx DOCX document
10876834_StaTybee_RFP_MstrDoc.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment 0004

70Z04720RTYBEDB

SOLICITATION 70Z04720RTYBEDB IS AMENDED AS FOLLOWS:

1. The text that reads “OPEN TO ABOVE” for MINIMUM CEILING HEIGHT for The Individual Space

Criteria Sheet (ISCS) on page 265 of 304 pages of the RFP Guide Specifications dated June 2020 shall be deleted and replaced with 19’ – 0”.

2. The following text “ 12’ x 16’ ” shall be added to The Individual Space Criteria Sheet (ISCS) on page

265 of 304 pages under the “Finishes” heading in the “Door” row.

3. In Section 1.17, paragraph 1.17.13.95 delete the following:

and REPLACE with the following:

4. CAD files for the civil drawings, as part of drawings requested, shall be provided as reference information and shall be burned onto individual computer discs and shipped via Federal Express to each of the nine firms on the current DHS NMACC II.

5. Delete Sheet A103 and replace with Amended Sheet A-103. Amended Drawing A103 shall be provided as a separate attachment to Amendment 0004.

THE FOLLOWING QUESTIONS WERE RECEIVED IN RESPONSE TO THE SOLICITATION:

1. QUESTION: RFP Section 01800 paragraph 1.18.2 - Section 01800 paragraph 1.18.2 states that the

Government has initiated the permit work for the NEPA Environmental Assessment and it is scheduled to be completed in January 2021. Please confirm that delays in receipt of the NEPA Environmental

Assessment outside the control of the Contractor will result in a contract modification.

RESPONSE: A NEPA EA is still under development by the Government, and not yet available. The

Government will provide a Draft NEPA EA prior to the bid due date and the contractors submitting bids shall review and incorporate this document into the design/build project to include any and all environmental project requirements, consultations, environmental best management practices, environmental permits and permit conditions, and environmental conditions into the project. The

Final NEPA EA will not be available until after contract award. The Contractor will be responsible for reviewing the final NEPA EA and incorporating this document into the project. Any changes between the draft and final NEPA EA that impact the design or construction will be considered changed site conditions.

2. QUESTION: RFP Drawings - Please provide CAD files for the civil drawings if available.

RESPONSE: CAD files will be provided as reference information. See Amendment No. 4 above.

3. QUESTION: Section 01800 Paragraph 1.1.1.4 - Section 01800, Paragraph 1.1.1.4 Accessibility: Please clarify which spaces are exempt from the listed accessibility guidelines. The RFP-provided plans do not appear to provide full accessibility for Locker Rooms, Locker Room Showers, Galley, and Berthing

Rooms.

RESPONSE: Any space that is not intended for general public access is exempt from accessibility requirements. Spaces such as the Locker room, Locker Room Showers, Galley, and Berthing Rooms are not intended for general public access.

4. QUESTION: Section 01800, Paragraph 1.11.3.4: Berthing Rooms shall have tank toilets, but RFP-provided plans appear to show wall mounted type toilets. Please clarify.

RESPONSE: Flush valve toilet symbol shown on RFP drawings do not indicate a wall mounted fixture. Toilets can be tank type or flush valve.

5. QUESTION: Appendix F - Appendix F, Individual Space Criteria Sheets: Boat Bay 115, MK Shop 116, Boatswain Shop 117, Paint Shop 118, ATON Shop and Storage 119 & 120, General Building Storage 121, R&S Controlled Storage 122, Battery Storage 123, and Mail Room 124 all call for “Concrete, Painted” walls. Is “CMU, Painted” an acceptable alternative?

RESPONSE: Painted concrete or CMU are both acceptable.

6. QUESTION: Drawing A-103 - Drawing A-103: In Laundry Room 307, Keynote 2 is expected but not shown. Please confirm if/how many stacked washer/dryers (and connections) shall be provided.

RESPONSE: There shall be two provided. See Amendment No. 5 above.

7. QUESTION: Appendix F, Individual Space Criteria Sheets: Please provide minimum clear overhead height required in Boat Storage 115 - Appendix F, Individual Space Criteria Sheets: Please provide minimum clear overhead height required in Boat Storage 115.

RESPONSE: A minimum of 19ft is required. See Amendment No. 1 above.

8. QUESTION: Appendix F, Individual Space Criteria Sheets: Please provide minimum clear overhead height required in tractor/forklift storage area of Boat Storage 115 – Appendix F, Individual Space Criteria

Sheets: tractor/forklift storage area of Boat Storage 115 - Appendix F, Individual Space Criteria

Sheets: Please provide minimum clear overhead height required in tractor/forklift storage area of Boat

Storage 115.

RESPONSE: A minimum of 19ft is required. See Amendment No. 1 above.

Note

Failure to acknowledge amendments may be cause for rejection of your offer.

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0004
Code[0]:
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: Rebuild Facilities and Waterfront, Station Tybee, USCG Station Tybee, Cockspur Island, GA

Description of Amendment 0004: Continued on Page 2.

FacilityCode[0]:
Code[2]: NA
IssuedBy[0]: Contracting Division

USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-2431

NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]: NA
AmendmentNo[1]: 70Z04720RTYBEDB
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 4
EffectiveDate[0]: 10/06/2020
Dated9B[0]: 09/03/2020
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: Off
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: 1
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]:
CopiesReturned[0]: 1

File details come from the government source that posted it. Updated .