Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment 0012
70Z04720RTYBEDB
___________________________________________________________________________Page 2 of 4
SOLICITATION 70Z04720RTYBEDB IS AMENDED AS FOLLOWS:
1. AMEND RFP Specification Section 1800 – Subsection 1.18 as follows:
Replace 1800 - 1.18.2.1 with the following:
1.18.2.1 INITIAL GOVERNMENT PERMIT WORK
The Government has initiated permit work as follows:
NEPA Environmental Assessment - A NEPA Environmental Assessment (EA) Draft
Final has been completed. This document is provided as an attached document. The contractor shall incorporate recommendations and requirements of this document into all design and construction requirements. The Final EA, which is anticipated to be available by March 1, 2021, will be provided to the contractor once available, and the contractor will reevaluate and incorporate the final document into the design and construction of this project. Any changes between the draft and final version of the EA that require additional work will be considered a changed site condition.
In accordance with Section 106 of the National Historic Preservation Act (NHPA), the
USCG has concluded that the project will have an “adverse effect” to a historical resource, and is preparing a Memorandum of Agreement (MOA), which is anticipated to be available by March 1, 2021. The MOA will be signed by the USCG, Georgia SHPO, and the National Park Service. The USCG will provide the contractor with a copy of this
Agreement once it is available. The contractor shall incorporate all requirements of this document into the design and construction of this project. At a minimum, the contractor shall assume the following requirements will be part of the MOA agreement and the contractor shall include these requirements in their bid proposal:
a. All archeologist working on this project shall meet all Department of Interior
Professional Qualifications Standards (see 36 CFR Part 61, Appendix A).
b. An archeologist shall develop an unanticipated discovery plan for all excavation activities associated with the project and provide appropriate on-site training to all construction personnel engaged in excavation activities on this site. With the exception of the existing U.S. Coast Guard compound (the fenced-in Station) on
Cockspur Island, an archeologist shall also be onsite and shall monitor all excavation activities. The areas to be monitored are further described as the areas associated with the construction of the new wastewater system, the construction of the boat ramp and associated boat ramp road, and the potable water pump house and all associated water utilities (well, water lines, tie-in points). A professional monthly report written by the archeologist of all findings and observations shall be provided to the COR within 14 calendar days of the end of each month that excavation activities occurred.
___________________________________________________________________________Page 3 of 4
c. As part of the design phase of this project, for all work associated with constructing the new water pump house, water lines, and work in the immediate vicinity of the ground water well and pump house, the contractor shall utilize nondestructive ground penetrating radar (GPR) and/or other appropriate nondestructive technologies to identify the presence of any subsurface archeological features and will reconfigure or relocate construction of the pump house and associated utilities to avoid any identified subsurface anomalies. An archeologist shall be present during all site investigation activities, review all findings, and recommend any proposed changes to the footprint of new structures in this area. A professional report written by the archeologist overseeing this effort of all findings, observations, and recommendations shall be provided to the COR within 14 calendar days of the completion of field activities.
d. See Sections 01800 -18.4.1.18 for additional requirements
Further note that changed site conditions will not include or extend to typically required environmental permits and best management practices (storm water, in-water work permits, fuel tanks, spill plans, air pollution, disposal, etc.).
Replace 1800 – 1.18.4.1.18 with the following:
1.18.4.1.18 This project is located on the west end of Cockspur Island on lands owned by the NPS that are located within the boundaries of the National Register of Historic
Places (NRHP)-listed Fort Pulaski National Monument (PARK). The PARK is rich in history and cultural resources.
The NPS and the GA SHPO will be concurrently reviewing the design submittals and submitting their comments to the USCG for our consideration. Discuss actions to be taken during the design phase to ensure that the NPS and GA SHPO office will concur with the design.
Provide a description of any anticipated historical and archeological resources that must be protected during the project and the plan to protect these resources. Provide steps to be taken should unknown cultural resources be discovered during construction. Develop a project/site specific Unanticipated Discovery Plan to address potential cultural resources should they be encountered during excavation. At a minimum, this plan shall address recognition of cultural resources, on-site responsibilities, contacts and consultation, appropriate notifications, special procedures in the event human remains are discovered, documentation of archaeological/cultural discoveries, steps to be taken/plan of action prior to proceeding with construction. Include in the plan a discussion of the logistics in having qualified archeologist on-site and monitoring all
___________________________________________________________________________Page 4 of 4 active excavation activities outside of the main U.S. Station Tybee compound. The author of the plan shall be a qualified archeologist that has experience and qualifications in developing, preparing, and writing at least two previous Unanticipated Discovery
Plans for projects similar in size and scope. The plan can either be a standalone document or incorporated into the EPP.
All on-site construction crew members involved in ground disturbing activities shall have an awareness, understanding, and appropriate training in what their responsibilities are and what actions should be taken in the event of an unanticipated discovery at this site.
Upon evaluation by the Archeologist that a cultural resource discovery is determined to be significant and change or delay the construction, this will be considered a changed site condition.
2. Draft Environmental Assessment for the USCG, Station Tybee Station Rebuild Project shall be included in RFP 70Z04720RTYBEDB as a separate attachment.
THE FOLLOWING QUESTION WAS RECEIVED IN RESPONSE TO THE
SOLICITATION:
1. RFP Specifications 01800, Paragraph 1.4.8_ Since a Wasteload Allocation Request has not been made for an effluent discharge into the Savannah River, how should the potential for extended permitting time and unexpected effluent water quality parameters be captured in the proposal document's schedule and cost? Could an allowance be established for the anticipated duration of the permitting duration relative to the sanitary system?
Response: Government is unable to provide an allowance. Contractor should to refer to provided engineering study to formulate best estimate regarding permitting duration.
Note
Failure to acknowledge amendments may be cause for rejection of your proposal
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0012 |
| Code[0]: |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: Rebuild Facilities and Waterfront, Station Tybee, USCG Station Tybee, Cockspur Island, GA |
Amendment 0012 is continued on Page 2:
| FacilityCode[0]: |
| Code[2]: NA |
| IssuedBy[0]: Contracting Division |
USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-2431
| NameandAddress[0]: |
| AdministeredBy[0]: |
| ContractIDCode[0]: |
| ReqNumber[0]: NA |
| AmendmentNo[1]: 70Z04720RTYBEDB |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 4 |
| EffectiveDate[0]: 01/12/2021 |
| Dated9B[0]: 09/03/2020 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: Off |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: 1 |
| Extended[0]: Off |
| NotExtended[0]: 1 |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: |
| CopiesReturned[0]: 1 |
File details come from the government source that posted it. Updated .