This Standard Form 30 (SF-30) Amendment of Solicitation document cancels the existing solicitation for the Joint Requirements Integration and Management System (JRIMS) Capabilities Documents for the United States Coast Guard. The government is canceling the current Request for Proposals (RFP) due to significant scope changes that align with new administrative priorities, which exceed what prospective offerors could have reasonably anticipated during the initial submission period.

The amendment indicates that a revised solicitation will be issued at a future date, though the timeline is uncertain and may take several months. The cancellation aims to ensure fairness in the competitive process by providing all interested vendors an equal opportunity to propose under updated requirements. The original solicitation was a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside for program management and technical support services, with an estimated total contract value of $60,000 and a potential five-year contract duration.

View the file

Other files

File Type Posted
SF-30 for Amendment 70Z02324R771000010011 final.pdf PDF
Questions and Answers for 70Z02324R77100001 as of 2024 07 23.xlsx XLSX spreadsheet
Addendum 1 - Section B to M for 70Z02324R77100001 V3.9.pdf PDF
SF-30 for 70Z02324R771000010010.pdf PDF
70Z02324R77100001 Amendment 0010 Changes Summary 2024 07 11.pdf PDF
SF-30 for Amendment 70Z02324R771000010009 V1.0.pdf PDF
Questions and Answers for 70Z02324R77100001 as of 2024 05 31.xlsx XLSX spreadsheet
Addendum 1 - Section B to M for 70Z02324R77100001 V3.7.pdf PDF
70Z02324R77100001 Amendment 0008 Changes Summary 2024 05 30.pdf PDF
SF-30 for Amendment 70Z02324R771000010008 V1.0.pdf PDF
SF-30 for Amendment 70Z02324R771000010007 V1.0.pdf PDF
Addendum 1 - Section B to M for 70Z02324R77100001 V3.6.pdf PDF
Addendum 1 - Section B to M for 70Z02324R77100001 V3.5.pdf PDF
Questions and Answers for 70Z02324R77100001 as of 2024 05 02.xlsx XLSX spreadsheet
SF-30 for Amendment 70Z02324R771000010006 V1.0.pdf PDF
Attachment J-2-Pricing Spreadsheet for 70Z02324R77100001 V2.1.xlsx XLSX spreadsheet
70Z02324R77100001 Amendment 0006 Changes Summary 2024 TBD.pdf PDF
SF-1449 for RFP 70Z02324R77100001 V1.2.pdf PDF
Attachment J-1 - Labor Category Descriptions V2.0.pdf PDF
70Z02324R77100001 Amendment 0005 Changes Summary 2024 04 26.pdf PDF
SF-30 for Amendment 70Z02324R771000010005 V1.0.pdf PDF
Addendum 1 - Section B to M for 70Z02324R77100001 V3.4.pdf PDF
SF-1449 for RFP 70Z02324R77100001 V1.1.pdf PDF
Questions and Answers for 70Z02324R77100001 as of 2024 04 26.xlsx XLSX spreadsheet
70Z02324R77100001 Amendment 0004 Changes Summary 2024 04 15.pdf PDF
Questions and Answers for 70Z02324R77100001 as of 2024 04 15.xlsx XLSX spreadsheet
SF-30 for Amendment 70Z02324R771000010004 V1.0.pdf PDF
Addendum 1 - Section B to M for 70Z02324R77100001 V3.3.pdf PDF
SF-30 for Amendment 70Z02324R771000010003 V1.0.pdf PDF
Addendum 1 - Section B to M for 70Z02324R77100001 V3.2.pdf PDF
SF-30 for Amendment 70Z02324R771000010002 V1.0.pdf PDF
Questions and Answers for 70Z02324R77100001 as of 2024 04 03.xlsx XLSX spreadsheet
70Z02324R77100001 Amendment 0002 Changes Summary 2024 TBD.pdf PDF
Attachment J-2-Pricing Spreadsheet for 70Z02324R77100001 V2.0.xlsx XLSX spreadsheet
Questions and Answers for 70Z02324R77100001 as of 2024 03 19.xlsx XLSX spreadsheet
70Z02324R77100001 Amendment 0001 Changes Summary 2024 03 20.pdf PDF
Addendum 1 - Section B to M for 70Z02324R77100001 V3.1.docx DOCX document
70Z02324R77100001 Amendment 0001 Changes Summary 2024 03 19.docx DOCX document
Addendum 1 - Section B to M for 70Z02324R77100001 V3.1.pdf PDF
SF-30 for Amendment 70Z02324R771000010001 final V1.0.pdf PDF
Attachment 1 - Past Performance Questionnaire - 70Z02324R77100001.pdf PDF
Attachment J-1 - Labor Category Descriptions V1.0.pdf PDF
Attachment J-2-Pricing Spreadsheet for 70Z02324R77100001 draft V1.0.xlsx XLSX spreadsheet
SF-1449 for 70Z02324R77100001 final V1.0.pdf PDF
Addendum 1 - Section B to M for 70Z02324R77100001 V3.0.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

70Z02324R771000010012

Summary of Changes

The solicitation in block 9A is hereby amended as follows:

The Government hereby cancels the subject solicitation because the scope of the requirements has undergone significant changes to align with the priorities of the new administration. These updates reflect substantial revisions to the original scope, exceeding what prospective offerors could reasonably have anticipated at the time of submission. As these modifications are still ongoing, it has been deemed necessary to cancel the existing RFP to maintain fairness in the competitive process.

By canceling and revising the solicitation, we aim to ensure all interested vendors have an equal opportunity to propose under updated requirements. A revised solicitation will be issued at a future date; however, due to various factors affecting the timeline, it may be several months before this occurs.

Text52:
Text54: 1
TOTAL_NO_OF_PAGES: 2
CUST_PROJ_CODE:
DOCUMENT_NUMBER: 70Z02324R771000010012
EFFECTIVE_DATE: 2025-04-16T16:51:28.000-04:00
REF_PR_NUM_T:
SOL_DOCUMENT_NUMBER: 70Z02324R77100001
SOL_OPEN_BID_DATE: 2024-07-26T11:31:26.000-04:00
NO_OF_COPIES: 1
Check Box91: Yes
Check Box92: Off
MANUAL_EXTEND_FLAG: Y
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Text1: AMENDMENT CONTROL NUMBER :
HDR_DOCUMENT_NUMBER: 70Z02324R77100001
Text134: SUMMARY OF CHANGES :
AMENDMENT_DESCRIPTION: AMEND-See Schedule
Text2: Same As Issuing Office
AMD_ISSUING_OFFICE_LADDR: 70Z023 CG-9123

2703 Martin Luther King Ave, SE Washington, DC, 20593, US

AMD_ISSUING_OFFICE_LOCCODE: 70Z023