This document contains a pricing template and independent government cost estimate for technical support services required by the United States Coast Guard under solicitation number 70Z02324R77100001. The solicitation seeks a single Indefinite Delivery, Indefinite Quantity contract to provide program management, analysis, and documentation support for all phases of the Coast Guard's requirements generation process over a five-year period consisting of a one-year base and four one-year options. Deliverables include formal reports, studies, and documents. The template includes fully burdened labor rates for various categories to be completed by offerors. The independent cost estimate provides example rates and calculations for evaluation purposes. The requirement is set aside for Service Disabled, Veteran Owned Small Businesses. The total independent government estimate for the five-year ordering period is $60,000.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Period
| Complete blue cells only. This form will auto calculate. Save as Excel 2007 (.xlsx) | ||||
| Pricing Worksheet | ||||
| Category | Fully Loaded Rate | Unit | Qty | Cost |
| Program Manager (Government Site Rate) | $0.00 | Hour | 2080 | $ - 0 |
| Project Manager (Contractor Site Rate) | $0.00 | Hour | 10400 | $ - 0 |
| Senior Management Analyst (Contractor Site Rate) | $0.00 | Hour | 624 | $ - 0 |
| Management Analyst (Contractor Site Rate) | $0.00 | Hour | 4160 | $ - 0 |
| Junior Management Analyst (Contractor Site Rate) | $0.00 | Hour | 832 | $ - 0 |
| Senior Acquisition Analyst (Contractor Site Rate) | $0.00 | Hour | 416 | $ - 0 |
| Acquisition Analyst (Contractor Site Rate) | $0.00 | Hour | 4000 | $ - 0 |
| Junior Acquisition Analyst (Contractor Site Rate) | $0.00 | Hour | 520 | $ - 0 |
| Senior Technical Writer / Editor (Contractor Site Rate) | $0.00 | Hour | 1040 | $ - 0 |
| Technical Writer / Editor (Contractor Site Rate) | $0.00 | Hour | 12480 | $ - 0 |
| Junior Technical Writer / Editor (Contractor Site Rate) | $0.00 | Hour | 1590 | $ - 0 |
| Senior Data Analyst (Contractor Site Rate) | $0.00 | Hour | 1040 | $ - 0 |
| Data Analyst (Contractor Site Rate) | $0.00 | Hour | 10400 | $ - 0 |
| Junior Data Analyst (Contractor Site Rate) | $0.00 | Hour | 1590 | $ - 0 |
| Senior Cost Analyst (Contractor Site Rate) | $0.00 | Hour | 416 | $ - 0 |
| Cost Analyst (Contractor Site Rate) | $0.00 | Hour | 4032 | $ - 0 |
| Junior Cost Analyst (Contractor Site Rate) | $0.00 | Hour | 520 | $ - 0 |
| Systems Engineer (Contractor Site Rate) | $0.00 | Hour | 1040 | $ - 0 |
| Total Labor Qty & Cost: | 57180 | $ - 0 |
Travel 0.00% Dollar NTE $ 10,000.00
| Other Direct Costs (ODCs) | Rate | Unit | Qty 1 | Cost 1 |
| Mileage | $ - 0 | Mile | 0 | $ - 0 |
| Vehicle Rental | $ - 0 | Daily | 0 | $ - 0 |
| Airport Parking | $ - 0 | Daily | 0 | $ - 0 |
| Conference Facilities | $ - 0 | Daily | 0 | $ - 0 |
| USCG HQ Parking | $ - 0 | Daily | 0 | $ - 0 |
| Report Reproduction | $ - 0 | Page | 0 | $ - 0 |
| Total ODC Qty & Cost: | 0 | $ - 0 | ||
| % of Total ODC | 0% | 0% |
| Travel/ Transportation | Rate | Unit | Qty 1 | Cost 1 |
| Per Diem-Washington, D.C. | $ - 0 | Daily | 0 | $ - 0 |
| Per Diem- City #2 | $ - 0 | Daily | 0 | $ - 0 |
| Airfare (Vendor/ Washington, DC) | $ - 0 | Round Trip | 0 | $ - 0 |
| Airfare (Vendor/ City #2) | $ - 0 | Round Trip | 0 | $ - 0 |
| Rent Car Gas | $ - 0 | Gallon | 0 | $ - 0 |
| Total Travel & Transportation Qty & Cost: | 0 | $ - 0 | ||
| % of Total Trav / Transportation | 0% | 0% |
| Subtotal ODCs & Travel/Transportation | $ - 0 | ||
| General & Administrative Surcharge | |||
| on ODC & Travel/Transportation | 10% | $ - 0 | |
| Grand Total Project Qty & Cost | 57180 | $ - 0 | |
| % of Grand Total | ERROR:#REF! | 0% |
Maximum Price for Base Period $ 10,000.00
&"Times New Roman,Bold"&14Draft Independent Government Estimate for (Specify Program Office) (Specify Project)
COTR Name COTR Office Page &P of &N &D
Period 1
| Complete blue cells only. This form will auto calculate. Save as Excel 2007 (.xlsx) | ||||
| Pricing Worksheet | ||||
| Category | Fully Loaded Rate | Unit | Qty | Cost |
| Program Manager (Government Site Rate) | $ - 0 | Hour | 2080 | $ - 0 |
| Project Manager (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 |
| Senior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 624 | $ - 0 |
| Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 4160 | $ - 0 |
| Junior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 832 | $ - 0 |
| Senior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 |
| Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 4000 | $ - 0 |
| Junior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Senior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 12480 | $ - 0 |
| Junior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 |
| Senior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 |
| Junior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 |
| Senior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 |
| Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 4032 | $ - 0 |
| Junior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Systems Engineer (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Total Labor Qty & Cost: | 56140 | $ - 0 |
Travel 0.00% Dollar NTE $ 10,000.00
| Other Direct Costs (ODCs) | Rate | Unit | Qty 1 | Cost 1 |
| Mileage | $ - 0 | Mile | 0 | $ - 0 |
| Vehicle Rental | $ - 0 | Daily | 0 | $ - 0 |
| Airport Parking | $ - 0 | Daily | 0 | $ - 0 |
| Conference Facilities | $ - 0 | Daily | 0 | $ - 0 |
| USCG HQ Parking | $ - 0 | Daily | 0 | $ - 0 |
| Report Reproduction | $ - 0 | Page | 0 | $ - 0 |
| Total ODC Qty & Cost: | 0 | $ - 0 | ||
| % of Total ODC | 0% | 0% |
| Travel/ Transportation | Rate | Unit | Qty 1 | Cost 1 |
| Per Diem-Washington, D.C. | $ - 0 | Daily | 0 | $ - 0 |
| Per Diem- City #2 | $ - 0 | Daily | 0 | $ - 0 |
| Airfare (Vendor/ Washington, DC) | $ - 0 | Round Trip | 0 | $ - 0 |
| Airfare (Vendor/ City #2) | $ - 0 | Round Trip | 0 | $ - 0 |
| Rent Car Gas | $ - 0 | Gallon | 0 | $ - 0 |
| Total Travel & Transportation Qty & Cost: | 0 | $ - 0 | ||
| % of Total Trav / Transportation | 0% | 0% |
| Subtotal ODCs & Travel/Transportation | $ - 0 | ||
| General & Administrative Surcharge | |||
| on ODC & Travel/Transportation | 10% | $ - 0 | |
| Grand Total Project Qty & Cost | 56140 | $ - 0 | |
| % of Grand Total | ERROR:#REF! | 0% |
Maximum Price for Period One $ 10,000.00
(Specify Project)
COTR Office Page &P of &N &D
Period 2
| Complete blue cells only. This form will auto calculate. Save as Excel 2007 (.xlsx) | ||||
| Pricing Worksheet | ||||
| Category | Fully Loaded Rate | Unit | Qty | Cost |
| Program Manager (Government Site Rate) | $ - 0 | Hour | 2080 | $ - 0 |
| Project Manager (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 |
| Senior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 624 | $ - 0 |
| Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 4160 | $ - 0 |
| Junior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 832 | $ - 0 |
| Senior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 |
| Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 4000 | $ - 0 |
| Junior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Senior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 12480 | $ - 0 |
| Junior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 |
| Senior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 |
| Junior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 |
| Senior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 |
| Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 4032 | $ - 0 |
| Junior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Systems Engineer (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Total Labor Qty & Cost: | 56140 | $ - 0 |
Travel 0.00% Dollar NTE $ 10,000.00
| Other Direct Costs (ODCs) | Rate | Unit | Qty 1 | Cost 1 |
| Mileage | $ - 0 | Mile | 0 | $ - 0 |
| Vehicle Rental | $ - 0 | Daily | 0 | $ - 0 |
| Airport Parking | $ - 0 | Daily | 0 | $ - 0 |
| Conference Facilities | $ - 0 | Daily | 0 | $ - 0 |
| USCG HQ Parking | $ - 0 | Daily | 0 | $ - 0 |
| Report Reproduction | $ - 0 | Page | 0 | $ - 0 |
| Total ODC Qty & Cost: | 0 | $ - 0 | ||
| % of Total ODC | 0% | 0% |
| Travel/ Transportation | Rate | Unit | Qty 1 | Cost 1 |
| Per Diem-Washington, D.C. | $ - 0 | Daily | 0 | $ - 0 |
| Per Diem- City #2 | $ - 0 | Daily | 0 | $ - 0 |
| Airfare (Vendor/ Washington, DC) | $ - 0 | Round Trip | 0 | $ - 0 |
| Airfare (Vendor/ City #2) | $ - 0 | Round Trip | 0 | $ - 0 |
| Rent Car Gas | $ - 0 | Gallon | 0 | $ - 0 |
| Total Travel & Transportation Qty & Cost: | 0 | $ - 0 | ||
| % of Total Trav / Transportation | 0% | 0% |
| Subtotal ODCs & Travel/Transportation | $ - 0 | ||
| General & Administrative Surcharge | |||
| on ODC & Travel/Transportation | 10% | $ - 0 | |
| Grand Total Project Qty & Cost | 56140 | $ - 0 | |
| % of Grand Total | ERROR:#REF! | 0% |
Maximum Price for Period Two $ 10,000.00
(Specify Project)
COTR Office Page &P of &N &D
Period 3
| Complete blue cells only. This form will auto calculate. Save as Excel 2007 (.xlsx) | ||||
| Pricing Worksheet | ||||
| Category | Fully Loaded Rate | Unit | Qty | Cost |
| Program Manager (Government Site Rate) | $ - 0 | Hour | 2080 | $ - 0 |
| Project Manager (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 |
| Senior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 624 | $ - 0 |
| Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 4160 | $ - 0 |
| Junior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 832 | $ - 0 |
| Senior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 |
| Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 4000 | $ - 0 |
| Junior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Senior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 12480 | $ - 0 |
| Junior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 |
| Senior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 |
| Junior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 |
| Senior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 |
| Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 4032 | $ - 0 |
| Junior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Systems Engineer (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Total Labor Qty & Cost: | 56140 | $ - 0 |
Travel 0.00% Dollar NTE $ 10,000.00
| Other Direct Costs (ODCs) | Rate | Unit | Qty 1 | Cost 1 |
| Mileage | $ - 0 | Mile | 0 | $ - 0 |
| Vehicle Rental | $ - 0 | Daily | 0 | $ - 0 |
| Airport Parking | $ - 0 | Daily | 0 | $ - 0 |
| Conference Facilities | $ - 0 | Daily | 0 | $ - 0 |
| USCG HQ Parking | $ - 0 | Daily | 0 | $ - 0 |
| Report Reproduction | $ - 0 | Page | 0 | $ - 0 |
| Total ODC Qty & Cost: | 0 | $ - 0 | ||
| % of Total ODC | 0% | 0% |
| Travel/ Transportation | Rate | Unit | Qty 1 | Cost 1 |
| Per Diem-Washington, D.C. | $ - 0 | Daily | 0 | $ - 0 |
| Per Diem- City #2 | $ - 0 | Daily | 0 | $ - 0 |
| Airfare (Vendor/ Washington, DC) | $ - 0 | Round Trip | 0 | $ - 0 |
| Airfare (Vendor/ City #2) | $ - 0 | Round Trip | 0 | $ - 0 |
| Rent Car Gas | $ - 0 | Gallon | 0 | $ - 0 |
| Total Travel & Transportation Qty & Cost: | 0 | $ - 0 | ||
| % of Total Trav / Transportation | 0% | 0% |
| Subtotal ODCs & Travel/Transportation | $ - 0 | ||
| General & Administrative Surcharge | |||
| on ODC & Travel/Transportation | 10% | $ - 0 | |
| Grand Total Project Qty & Cost | 56140 | $ - 0 | |
| % of Grand Total | ERROR:#REF! | 0% |
Maximum Price for Period Three $ 10,000.00
(Specify Project)
COTR Office Page &P of &N &D
Period 4
| Complete blue cells only. This form will auto calculate. Save as Excel 2007 (.xlsx) | ||||
| Pricing Worksheet | ||||
| Category | Fully Loaded Rate | Unit | Qty | Cost |
| Program Manager (Government Site Rate) | $ - 0 | Hour | 2080 | $ - 0 | 1040 |
| Project Manager (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 | 5200 |
| Senior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 624 | $ - 0 | 312 |
| Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 4160 | $ - 0 | 2080 |
| Junior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 832 | $ - 0 | 416 |
| Senior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 | 208 |
| Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 4000 | $ - 0 | 2000 |
| Junior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 | 260 |
| Senior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 | 520 |
| Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 12480 | $ - 0 | 6240 |
| Junior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 | 795 |
| Senior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 | 520 |
| Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 | 5200 |
| Junior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 | 795 |
| Senior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 | 208 |
| Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 4032 | $ - 0 | 2016 |
| Junior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 | 260 |
| Systems Engineer (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 | |
| Total Labor Qty & Cost: | 56140 | $ - 0 |
Travel 0.00% Dollar NTE $ 10,000.00
| Other Direct Costs (ODCs) | Rate | Unit | Qty 1 | Cost 1 |
| Mileage | $ - 0 | Mile | 0 | $ - 0 |
| Vehicle Rental | $ - 0 | Daily | 0 | $ - 0 |
| Airport Parking | $ - 0 | Daily | 0 | $ - 0 |
| Conference Facilities | $ - 0 | Daily | 0 | $ - 0 |
| USCG HQ Parking | $ - 0 | Daily | 0 | $ - 0 |
| Report Reproduction | $ - 0 | Page | 0 | $ - 0 |
| Total ODC Qty & Cost: | 0 | $ - 0 | ||
| % of Total ODC | 0% | 0% |
| Travel/ Transportation | Rate | Unit | Qty 1 | Cost 1 |
| Per Diem-Washington, D.C. | $ - 0 | Daily | 0 | $ - 0 |
| Per Diem- City #2 | $ - 0 | Daily | 0 | $ - 0 |
| Airfare (Vendor/ Washington, DC) | $ - 0 | Round Trip | 0 | $ - 0 |
| Airfare (Vendor/ City #2) | $ - 0 | Round Trip | 0 | $ - 0 |
| Rent Car Gas | $ - 0 | Gallon | 0 | $ - 0 |
| Total Travel & Transportation Qty & Cost: | 0 | $ - 0 | ||
| % of Total Trav / Transportation | 0% | 0% |
| Subtotal ODCs & Travel/Transportation | $ - 0 | ||
| General & Administrative Surcharge | |||
| on ODC & Travel/Transportation | 10% | $ - 0 | |
| Grand Total Project Qty & Cost | 56140 | $ - 0 | |
| % of Grand Total | ERROR:#REF! | 0% |
Maximum Price for Period Four $ 10,000.00
(Specify Project)
COTR Office Page &P of &N &D
6-month Option
| Complete blue cells only. This form will auto calculate. Save as Excel 2007 (.xlsx) | ||||
| Pricing Worksheet | ||||
| Category | Fully Loaded Rate | Unit | Qty | Cost |
| Program Manager (Government Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Project Manager (Contractor Site Rate) | $ - 0 | Hour | 5200 | $ - 0 |
| Senior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 312 | $ - 0 |
| Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 2080 | $ - 0 |
| Junior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 |
| Senior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 208 | $ - 0 |
| Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 2000 | $ - 0 |
| Junior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 260 | $ - 0 |
| Senior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 6240 | $ - 0 |
| Junior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 795 | $ - 0 |
| Senior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 5200 | $ - 0 |
| Junior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 795 | $ - 0 |
| Senior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 208 | $ - 0 |
| Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 2016 | $ - 0 |
| Junior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 260 | $ - 0 |
| Systems Engineer (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Total Labor Qty & Cost: | 28070 | $ - 0 |
Travel 0.00% Dollar NTE $ 10,000.00
| Other Direct Costs (ODCs) | Rate | Unit | Qty 1 | Cost 1 |
| Mileage | $ - 0 | Mile | 0 | $ - 0 |
| Vehicle Rental | $ - 0 | Daily | 0 | $ - 0 |
| Airport Parking | $ - 0 | Daily | 0 | $ - 0 |
| Conference Facilities | $ - 0 | Daily | 0 | $ - 0 |
| USCG HQ Parking | $ - 0 | Daily | 0 | $ - 0 |
| Report Reproduction | $ - 0 | Page | 0 | $ - 0 |
| Total ODC Qty & Cost: | 0 | $ - 0 | ||
| % of Total ODC | 0% | 0% |
| Travel/ Transportation | Rate | Unit | Qty 1 | Cost 1 |
| Per Diem-Washington, D.C. | $ - 0 | Daily | 0 | $ - 0 |
| Per Diem- City #2 | $ - 0 | Daily | 0 | $ - 0 |
| Airfare (Vendor/ Washington, DC) | $ - 0 | Round Trip | 0 | $ - 0 |
| Airfare (Vendor/ City #2) | $ - 0 | Round Trip | 0 | $ - 0 |
| Rent Car Gas | $ - 0 | Gallon | 0 | $ - 0 |
| Total Travel & Transportation Qty & Cost: | 0 | $ - 0 | ||
| % of Total Trav / Transportation | 0% | 0% |
| Subtotal ODCs & Travel/Transportation | $ - 0 | ||
| General & Administrative Surcharge | |||
| on ODC & Travel/Transportation | 10% | $ - 0 | |
| Grand Total Project Qty & Cost | 28070 | $ - 0 | |
| % of Grand Total | ERROR:#REF! | 0% |
Maximum Price for 6-month Option $ 10,000.00
(Specify Project)
COTR Office Page &P of &N &D
Totals
| Base Period | $ 10,000.00 |
| Period 1 | $ 10,000.00 |
| Period 2 | $ 10,000.00 |
| Period 3 | $ 10,000.00 |
| Period 4 | $ 10,000.00 |
| 6-month Option | $ 10,000.00 |
| Total | $ 60,000.00 |
Labor Categories
| Overhead Rate = | 0% | ||||||||||||||||
| Profit Rate = | 0% | ||||||||||||||||
| Base Rate | Fringe | SS/MC | Subtotal | Overhead Rate | Overhead | Subtotal | Profit Rate | Profit | Billable Rate | Bonus | 401K | Disability | Health | Pension | Weekly Rates | ||
| Program Manager (Government Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Project Manager (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Senior Management Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Management Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Junior Management Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Senior Acquisition Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Acquisition Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Junior Acquisition Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Senior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Technical Writer / Editor (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Junior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Senior Data Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Data Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Junior Data Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Senior Cost Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Cost Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Junior Cost Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Systems Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Labor rates were developed using salary.com for Washington, DC. |