This document is a pricing spreadsheet for a federal contract opportunity, Solicitation Number 70Z02324R77100001. The opportunity is for program management and technical support services to support all phases of the requirements generation process for the United States Coast Guard's Joint Requirements Integration and Management System (JRIMS).
The contract is a single Indefinite Delivery, Indefinite Quantity (IDIQ), Firm-Fixed-Price (FFP) contract with a base ordering period of one year and four one-year ordering periods. The Government is soliciting this requirement as a total Service Disabled, Veteran Owned (SDVO) Small Business Set-Aside. The pricing spreadsheet provides a breakdown of various labor categories, estimated hours, and not-to-exceed amounts for other direct costs and travel for the base period and each option period. The total evaluated price is $60,000.00.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Period
| Follow instruction in "Labor Categories" Tab. DO NOT EDIT THE ESTIMATED HOURS. | ||||
| Pricing Worksheet | ||||
| Category | Fully Loaded Rate | Unit | Qty | Cost |
| Program Manager (Government Site Rate) | $0.00 | Hour | 2080 | $ - 0 |
| Project Manager (Contractor Site Rate) | $0.00 | Hour | 10400 | $ - 0 |
| Senior Management Analyst (Contractor Site Rate) | $0.00 | Hour | 624 | $ - 0 |
| Management Analyst (Contractor Site Rate) | $0.00 | Hour | 4160 | $ - 0 |
| Junior Management Analyst (Contractor Site Rate) | $0.00 | Hour | 832 | $ - 0 |
| Senior Acquisition Analyst (Contractor Site Rate) | $0.00 | Hour | 416 | $ - 0 |
| Acquisition Analyst (Contractor Site Rate) | $0.00 | Hour | 4000 | $ - 0 |
| Junior Acquisition Analyst (Contractor Site Rate) | $0.00 | Hour | 520 | $ - 0 |
| Senior Technical Writer / Editor (Contractor Site Rate) | $0.00 | Hour | 1040 | $ - 0 |
| Technical Writer / Editor (Contractor Site Rate) | $0.00 | Hour | 12480 | $ - 0 |
| Junior Technical Writer / Editor (Contractor Site Rate) | $0.00 | Hour | 1590 | $ - 0 |
| Senior Data Analyst (Contractor Site Rate) | $0.00 | Hour | 1040 | $ - 0 |
| Data Analyst (Contractor Site Rate) | $0.00 | Hour | 10400 | $ - 0 |
| Junior Data Analyst (Contractor Site Rate) | $0.00 | Hour | 1590 | $ - 0 |
| Senior Cost Analyst (Contractor Site Rate) | $0.00 | Hour | 416 | $ - 0 |
| Cost Analyst (Contractor Site Rate) | $0.00 | Hour | 4032 | $ - 0 |
| Junior Cost Analyst (Contractor Site Rate) | $0.00 | Hour | 520 | $ - 0 |
| Systems Engineer (Contractor Site Rate) | $0.00 | Hour | 1040 | $ - 0 |
| Total Labor Qty & Cost: | 57180 | $ - 0 |
Travel NA Dollar NTE $ 10,000.00
| Other Direct Costs (ODCs) | Rate | Unit | Qty 1 | Cost 1 |
| Mileage | $ - 0 | Mile | 0 | $ - 0 |
| Vehicle Rental | $ - 0 | Daily | 0 | $ - 0 |
| Airport Parking | $ - 0 | Daily | 0 | $ - 0 |
| Conference Facilities | $ - 0 | Daily | 0 | $ - 0 |
| USCG HQ Parking | $ - 0 | Daily | 0 | $ - 0 |
| Report Reproduction | $ - 0 | Page | 0 | $ - 0 |
| Total ODC Qty & Cost: | 0 | $ - 0 | ||
| % of Total ODC | 0% | 0% |
| Travel/ Transportation | Rate | Unit | Qty 1 | Cost 1 |
| Per Diem-Washington, D.C. | $ - 0 | Daily | 0 | $ - 0 |
| Per Diem- City #2 | $ - 0 | Daily | 0 | $ - 0 |
| Airfare (Vendor/ Washington, DC) | $ - 0 | Round Trip | 0 | $ - 0 |
| Airfare (Vendor/ City #2) | $ - 0 | Round Trip | 0 | $ - 0 |
| Rent Car Gas | $ - 0 | Gallon | 0 | $ - 0 |
| Total Travel & Transportation Qty & Cost: | 0 | $ - 0 | ||
| % of Total Trav / Transportation | 0% | 0% |
| Subtotal ODCs & Travel/Transportation | $ - 0 | ||
| General & Administrative Surcharge | |||
| on ODC & Travel/Transportation | 10% | $ - 0 | |
| Grand Total Project Qty & Cost | 57180 | $ - 0 | |
| % of Grand Total | ERROR:#REF! | 0% |
Maximum Price for Base Period $ 10,000.00
&"Times New Roman,Bold"&14Draft Independent Government Estimate for (Specify Program Office) (Specify Project)
COTR Name COTR Office Page &P of &N &D
Period 1
| Follow instruction in "Labor Categories" Tab. DO NOT EDIT THE ESTIMATED HOURS. | ||||
| Pricing Worksheet | ||||
| Category | Fully Loaded Rate | Unit | Qty | Cost |
| Program Manager (Government Site Rate) | $ - 0 | Hour | 2080 | $ - 0 |
| Project Manager (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 |
| Senior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 624 | $ - 0 |
| Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 4160 | $ - 0 |
| Junior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 832 | $ - 0 |
| Senior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 |
| Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 4000 | $ - 0 |
| Junior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Senior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 12480 | $ - 0 |
| Junior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 |
| Senior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 |
| Junior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 |
| Senior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 |
| Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 4032 | $ - 0 |
| Junior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Systems Engineer (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Total Labor Qty & Cost: | 57180 | $ - 0 |
Travel NA Dollar NTE $ 10,000.00
| Other Direct Costs (ODCs) | Rate | Unit | Qty 1 | Cost 1 |
| Mileage | $ - 0 | Mile | 0 | $ - 0 |
| Vehicle Rental | $ - 0 | Daily | 0 | $ - 0 |
| Airport Parking | $ - 0 | Daily | 0 | $ - 0 |
| Conference Facilities | $ - 0 | Daily | 0 | $ - 0 |
| USCG HQ Parking | $ - 0 | Daily | 0 | $ - 0 |
| Report Reproduction | $ - 0 | Page | 0 | $ - 0 |
| Total ODC Qty & Cost: | 0 | $ - 0 | ||
| % of Total ODC | 0% | 0% |
| Travel/ Transportation | Rate | Unit | Qty 1 | Cost 1 |
| Per Diem-Washington, D.C. | $ - 0 | Daily | 0 | $ - 0 |
| Per Diem- City #2 | $ - 0 | Daily | 0 | $ - 0 |
| Airfare (Vendor/ Washington, DC) | $ - 0 | Round Trip | 0 | $ - 0 |
| Airfare (Vendor/ City #2) | $ - 0 | Round Trip | 0 | $ - 0 |
| Rent Car Gas | $ - 0 | Gallon | 0 | $ - 0 |
| Total Travel & Transportation Qty & Cost: | 0 | $ - 0 | ||
| % of Total Trav / Transportation | 0% | 0% |
| Subtotal ODCs & Travel/Transportation | $ - 0 | ||
| General & Administrative Surcharge | |||
| on ODC & Travel/Transportation | 10% | $ - 0 | |
| Grand Total Project Qty & Cost | 57180 | $ - 0 | |
| % of Grand Total | ERROR:#REF! | 0% |
Maximum Price for Period One $ 10,000.00
(Specify Project)
COTR Office Page &P of &N &D
Period 2
| Follow instruction in "Labor Categories" Tab. DO NOT EDIT THE ESTIMATED HOURS. | ||||
| Pricing Worksheet | ||||
| Category | Fully Loaded Rate | Unit | Qty | Cost |
| Program Manager (Government Site Rate) | $ - 0 | Hour | 2080 | $ - 0 |
| Project Manager (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 |
| Senior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 624 | $ - 0 |
| Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 4160 | $ - 0 |
| Junior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 832 | $ - 0 |
| Senior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 |
| Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 4000 | $ - 0 |
| Junior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Senior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 12480 | $ - 0 |
| Junior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 |
| Senior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 |
| Junior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 |
| Senior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 |
| Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 4032 | $ - 0 |
| Junior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Systems Engineer (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Total Labor Qty & Cost: | 57180 | $ - 0 |
Travel NA Dollar NTE $ 10,000.00
| Other Direct Costs (ODCs) | Rate | Unit | Qty 1 | Cost 1 |
| Mileage | $ - 0 | Mile | 0 | $ - 0 |
| Vehicle Rental | $ - 0 | Daily | 0 | $ - 0 |
| Airport Parking | $ - 0 | Daily | 0 | $ - 0 |
| Conference Facilities | $ - 0 | Daily | 0 | $ - 0 |
| USCG HQ Parking | $ - 0 | Daily | 0 | $ - 0 |
| Report Reproduction | $ - 0 | Page | 0 | $ - 0 |
| Total ODC Qty & Cost: | 0 | $ - 0 | ||
| % of Total ODC | 0% | 0% |
| Travel/ Transportation | Rate | Unit | Qty 1 | Cost 1 |
| Per Diem-Washington, D.C. | $ - 0 | Daily | 0 | $ - 0 |
| Per Diem- City #2 | $ - 0 | Daily | 0 | $ - 0 |
| Airfare (Vendor/ Washington, DC) | $ - 0 | Round Trip | 0 | $ - 0 |
| Airfare (Vendor/ City #2) | $ - 0 | Round Trip | 0 | $ - 0 |
| Rent Car Gas | $ - 0 | Gallon | 0 | $ - 0 |
| Total Travel & Transportation Qty & Cost: | 0 | $ - 0 | ||
| % of Total Trav / Transportation | 0% | 0% |
| Subtotal ODCs & Travel/Transportation | $ - 0 | ||
| General & Administrative Surcharge | |||
| on ODC & Travel/Transportation | 10% | $ - 0 | |
| Grand Total Project Qty & Cost | 57180 | $ - 0 | |
| % of Grand Total | ERROR:#REF! | 0% |
Maximum Price for Period Two $ 10,000.00
(Specify Project)
COTR Office Page &P of &N &D
Period 3
| Follow instruction in "Labor Categories" Tab. DO NOT EDIT THE ESTIMATED HOURS. | ||||
| Pricing Worksheet | ||||
| Category | Fully Loaded Rate | Unit | Qty | Cost |
| Program Manager (Government Site Rate) | $ - 0 | Hour | 2080 | $ - 0 |
| Project Manager (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 |
| Senior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 624 | $ - 0 |
| Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 4160 | $ - 0 |
| Junior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 832 | $ - 0 |
| Senior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 |
| Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 4000 | $ - 0 |
| Junior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Senior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 12480 | $ - 0 |
| Junior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 |
| Senior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 |
| Junior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 |
| Senior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 |
| Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 4032 | $ - 0 |
| Junior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Systems Engineer (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Total Labor Qty & Cost: | 57180 | $ - 0 |
Travel 0.00% Dollar NTE $ 10,000.00
| Other Direct Costs (ODCs) | Rate | Unit | Qty 1 | Cost 1 |
| Mileage | $ - 0 | Mile | 0 | $ - 0 |
| Vehicle Rental | $ - 0 | Daily | 0 | $ - 0 |
| Airport Parking | $ - 0 | Daily | 0 | $ - 0 |
| Conference Facilities | $ - 0 | Daily | 0 | $ - 0 |
| USCG HQ Parking | $ - 0 | Daily | 0 | $ - 0 |
| Report Reproduction | $ - 0 | Page | 0 | $ - 0 |
| Total ODC Qty & Cost: | 0 | $ - 0 | ||
| % of Total ODC | 0% | 0% |
| Travel/ Transportation | Rate | Unit | Qty 1 | Cost 1 |
| Per Diem-Washington, D.C. | $ - 0 | Daily | 0 | $ - 0 |
| Per Diem- City #2 | $ - 0 | Daily | 0 | $ - 0 |
| Airfare (Vendor/ Washington, DC) | $ - 0 | Round Trip | 0 | $ - 0 |
| Airfare (Vendor/ City #2) | $ - 0 | Round Trip | 0 | $ - 0 |
| Rent Car Gas | $ - 0 | Gallon | 0 | $ - 0 |
| Total Travel & Transportation Qty & Cost: | 0 | $ - 0 | ||
| % of Total Trav / Transportation | 0% | 0% |
| Subtotal ODCs & Travel/Transportation | $ - 0 | ||
| General & Administrative Surcharge | |||
| on ODC & Travel/Transportation | 10% | $ - 0 | |
| Grand Total Project Qty & Cost | 57180 | $ - 0 | |
| % of Grand Total | ERROR:#REF! | 0% |
Maximum Price for Period Three $ 10,000.00
(Specify Project)
COTR Office Page &P of &N &D
Period 4
| Follow instruction in "Labor Categories" Tab. DO NOT EDIT THE ESTIMATED HOURS. | ||||
| Pricing Worksheet | ||||
| Category | Fully Loaded Rate | Unit | Qty | Cost |
| Program Manager (Government Site Rate) | $ - 0 | Hour | 2080 | $ - 0 | 1040 |
| Project Manager (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 | 5200 |
| Senior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 624 | $ - 0 | 312 |
| Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 4160 | $ - 0 | 2080 |
| Junior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 832 | $ - 0 | 416 |
| Senior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 | 208 |
| Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 4000 | $ - 0 | 2000 |
| Junior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 | 260 |
| Senior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 | 520 |
| Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 12480 | $ - 0 | 6240 |
| Junior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 | 795 |
| Senior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 | 520 |
| Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 10400 | $ - 0 | 5200 |
| Junior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 1590 | $ - 0 | 795 |
| Senior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 | 208 |
| Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 4032 | $ - 0 | 2016 |
| Junior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 | 260 |
| Systems Engineer (Contractor Site Rate) | $ - 0 | Hour | 1040 | $ - 0 | |
| Total Labor Qty & Cost: | 57180 | $ - 0 |
Travel 0.00% Dollar NTE $ 10,000.00
| Other Direct Costs (ODCs) | Rate | Unit | Qty 1 | Cost 1 |
| Mileage | $ - 0 | Mile | 0 | $ - 0 |
| Vehicle Rental | $ - 0 | Daily | 0 | $ - 0 |
| Airport Parking | $ - 0 | Daily | 0 | $ - 0 |
| Conference Facilities | $ - 0 | Daily | 0 | $ - 0 |
| USCG HQ Parking | $ - 0 | Daily | 0 | $ - 0 |
| Report Reproduction | $ - 0 | Page | 0 | $ - 0 |
| Total ODC Qty & Cost: | 0 | $ - 0 | ||
| % of Total ODC | 0% | 0% |
| Travel/ Transportation | Rate | Unit | Qty 1 | Cost 1 |
| Per Diem-Washington, D.C. | $ - 0 | Daily | 0 | $ - 0 |
| Per Diem- City #2 | $ - 0 | Daily | 0 | $ - 0 |
| Airfare (Vendor/ Washington, DC) | $ - 0 | Round Trip | 0 | $ - 0 |
| Airfare (Vendor/ City #2) | $ - 0 | Round Trip | 0 | $ - 0 |
| Rent Car Gas | $ - 0 | Gallon | 0 | $ - 0 |
| Total Travel & Transportation Qty & Cost: | 0 | $ - 0 | ||
| % of Total Trav / Transportation | 0% | 0% |
| Subtotal ODCs & Travel/Transportation | $ - 0 | ||
| General & Administrative Surcharge | |||
| on ODC & Travel/Transportation | 10% | $ - 0 | |
| Grand Total Project Qty & Cost | 57180 | $ - 0 | |
| % of Grand Total | ERROR:#REF! | 0% |
Maximum Price for Period Four $ 10,000.00
(Specify Project)
COTR Office Page &P of &N &D
6-month Option
| Follow instruction in "Labor Categories" Tab. DO NOT EDIT THE ESTIMATED HOURS. | ||||
| Pricing Worksheet | ||||
| Category | Fully Loaded Rate | Unit | Qty | Cost |
| Program Manager (Government Site Rate) | $ - 0 | Hour | 1040 | $ - 0 |
| Project Manager (Contractor Site Rate) | $ - 0 | Hour | 5200 | $ - 0 |
| Senior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 312 | $ - 0 |
| Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 2080 | $ - 0 |
| Junior Management Analyst (Contractor Site Rate) | $ - 0 | Hour | 416 | $ - 0 |
| Senior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 208 | $ - 0 |
| Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 2000 | $ - 0 |
| Junior Acquisition Analyst (Contractor Site Rate) | $ - 0 | Hour | 260 | $ - 0 |
| Senior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 6240 | $ - 0 |
| Junior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | Hour | 795 | $ - 0 |
| Senior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 5200 | $ - 0 |
| Junior Data Analyst (Contractor Site Rate) | $ - 0 | Hour | 795 | $ - 0 |
| Senior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 208 | $ - 0 |
| Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 2016 | $ - 0 |
| Junior Cost Analyst (Contractor Site Rate) | $ - 0 | Hour | 260 | $ - 0 |
| Systems Engineer (Contractor Site Rate) | $ - 0 | Hour | 520 | $ - 0 |
| Total Labor Qty & Cost: | 28590 | $ - 0 |
Travel NA Dollar NTE $ 10,000.00
| Other Direct Costs (ODCs) | Rate | Unit | Qty 1 | Cost 1 |
| Mileage | $ - 0 | Mile | 0 | $ - 0 |
| Vehicle Rental | $ - 0 | Daily | 0 | $ - 0 |
| Airport Parking | $ - 0 | Daily | 0 | $ - 0 |
| Conference Facilities | $ - 0 | Daily | 0 | $ - 0 |
| USCG HQ Parking | $ - 0 | Daily | 0 | $ - 0 |
| Report Reproduction | $ - 0 | Page | 0 | $ - 0 |
| Total ODC Qty & Cost: | 0 | $ - 0 | ||
| % of Total ODC | 0% | 0% |
| Travel/ Transportation | Rate | Unit | Qty 1 | Cost 1 |
| Per Diem-Washington, D.C. | $ - 0 | Daily | 0 | $ - 0 |
| Per Diem- City #2 | $ - 0 | Daily | 0 | $ - 0 |
| Airfare (Vendor/ Washington, DC) | $ - 0 | Round Trip | 0 | $ - 0 |
| Airfare (Vendor/ City #2) | $ - 0 | Round Trip | 0 | $ - 0 |
| Rent Car Gas | $ - 0 | Gallon | 0 | $ - 0 |
| Total Travel & Transportation Qty & Cost: | 0 | $ - 0 | ||
| % of Total Trav / Transportation | 0% | 0% |
| Subtotal ODCs & Travel/Transportation | $ - 0 | ||
| General & Administrative Surcharge | |||
| on ODC & Travel/Transportation | 10% | $ - 0 | |
| Grand Total Project Qty & Cost | 28590 | $ - 0 | |
| % of Grand Total | ERROR:#REF! | 0% |
Maximum Price for 6-month Option $ 10,000.00
(Specify Project)
COTR Office Page &P of &N &D
Labor Categories
| Overhead Rate = | 0% | ||||||||||||||||
| Profit Rate = | 0% | ||||||||||||||||
| Base Rate | Fringe | SS/MC | Subtotal | Overhead Rate | Overhead | Subtotal | Profit Rate | Profit | Billable Rate | Bonus | 401K | Disability | Health | Pension | Weekly Rates | ||
| Program Manager (Government Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Project Manager (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Senior Management Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Management Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Junior Management Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Senior Acquisition Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Acquisition Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Junior Acquisition Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Senior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Technical Writer / Editor (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Junior Technical Writer / Editor (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Senior Data Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Data Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Junior Data Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Senior Cost Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Cost Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Junior Cost Analyst (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Systems Engineer (Contractor Site Rate) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0% | $ - 0 | $ - 0 | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | $ - 0 | $ - 0 |
| Instructions: | |||||||||||||||||
| DO NOT EDIT THE ESTIMATED HOURS. | |||||||||||||||||
| Fill in the base rate under Column C for each labor category. | |||||||||||||||||
| Fill in the Overhead Rate in Block E2 and the Profit Rate in Block E3. | |||||||||||||||||
| Fill in the percentages on Columns N though S for Fringe Benefits. The rest of the document will fill in. | |||||||||||||||||
| If you do not want to provide the all the requested information, you may fill in the Billable Rates in Column L only. | |||||||||||||||||
| The Option Periods build in a 2% increase from year to year. If you want to change that, you will have to edit the formulas on your own. | |||||||||||||||||
| Save as Excel Workbook (*.xlsx) |
Totals
| Pricing Summary | |
| Period | Price |
| Base Period | $ 10,000.00 |
| Period 1 | $ 10,000.00 |
| Period 2 | $ 10,000.00 |
| Period 3 | $ 10,000.00 |
| Period 4 | $ 10,000.00 |
| 6-month Option | $ 10,000.00 |
| Total Evaluated Price | $ 60,000.00 |