This document provides guidance on maintaining energy savings measures implemented under an energy savings performance contract at the Federal Law Enforcement Training Centers facility in Glynco, Georgia. The contract installed energy conservation measures in 12 dormitory buildings, a dining hall facility, and other buildings. Measures included lighting upgrades, water conservation upgrades, and HVAC controls upgrades. Contractors are responsible for maintaining equipment related to these measures and reporting any deficiencies. Specific equipment installed is identified along with warranty periods. Procedures are outlined for deficiency reporting, tracking replacement parts, and ensuring savings guarantees are maintained over the 17-year performance period of the energy savings performance contract ending in 2033.

View the file

Other files

File Type Posted
70LGLY24RGLB00001-0001.pdf PDF
23. Attachment 16 WD 2020-0018 REV 9 dtd 10.04.2023.pdf PDF
21. Attachment 14 FLETC Form 121-00-02, Frequent Visitor and Vendor Request Form.pdf PDF
15. Attachment 8 ESPC Deficiency List.pdf PDF
7. Attachment 3 FTC-ADM-61 SCWR.pdf PDF
2. Attachment 2A Accountable Property.pdf PDF
7. Technical Exhibit 5 Deliverable Submittals.pdf PDF
6. Technical Exhibit 4 MONTHLY POOL LOGS.pdf PDF
5. Technical Exhibit 3 Rules and Regulations Public Swimming Pools, Spas, and Recreational Water Parks.pdf PDF
4. Technical Exhibit 2 PRS.pdf PDF
11. Attachment 6A Room Inventory 185, 186, and 187.pdf PDF
10. Attachment 5B CFP - Dorm 102.pdf PDF
8. Attachment 4 FTC-ADM-44 Survey Report.pdf PDF
4. Attachment 2C Custodial Housekeeping - GFP.pdf PDF
22. Attachment 15 QASP Dorm Management Services.pdf PDF
19. Attachment 12 Contractor Security Screening Packet.pdf PDF
18. Attachment 11 SF85.pdf PDF
16. Attachment 9 - OSHA300form1-1-04.pdf PDF
13. Attachment 6C Room Inventory Dorm 102.pdf PDF
9. Attachment 5A CFP.pdf PDF
6. Attachment 2E Custodial Housekeeping - GFP Dorm 102.pdf PDF
2. Technical Exhibit 1B Historical Data - WORK ORDER REPORT.pdf PDF
17. Attachment 10 Environmental Requirements.pdf PDF
20. Attachment 13 Instructions to Complete Contractor Security Screening Forms.pptx PPTX presentation
12. Attachment 6B Room Inventory Main Campus.pdf PDF
5. Attachment 2D GFP Dorm 102.pdf PDF
3. Attachment 2B Non-Accountable Property.pdf PDF
1. Attachment 1 FTC-SEM-34 FLETC Statement.pdf PDF
3. Technical Exhibit 1C Historical Data - SCWR.pdf PDF
1. Technical Exhibit 1A Historical Data.pdf PDF
Sol 70LGLY24RGLB00001.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

70LGLY24RGLB00001 Part 9, Attachment 7 Lodging Management Services FLETC, Glynco Georgia

June 26, 2014 (REVISED October 23, 2014)

Federal Law E11force111e11t Tmini11g Centers U.S. Department of Homeland Security 1131 Chapel Crossing Road Glynco, Georgia 31524

Homeland Security

ESPC BULLETIN - GLYNCO (Dorm Contractor)

GENERAL OVERVIEW FOR CONTRACTOR RELATED BUILDINGS WITH

ENERGY CONSERVATION MEASURES (ECMs) PROVIDED BY THE ENERGY SAVINGS

PERFORMANCE CONTRACT (ESPC} - NORESCO CONTRACTOR AT THE FLETC GLYNCO FACILITY

General Background

All federal facilities, including The Federal Law Enforcement Training Centers (FLETC), are required to reduce their energy and water consumption.

For energy and water reduction, the current federal energy policy drivers are

Energy Policy EPACT 2005 (Public Law 109-58), signed August 8 2005 http://www.gpo.gov/fdsys/pkg/PLAW-109publ58/pdf/PLAW-109publ58.pdf

Executive Order (E.O.) 13514, "Federal Leadership in Environmental, Energy, and Economic

Performance", was signed on October 5, 2009 http;//www.gpo.gov/fdsys/pkg/FR-2009-10 -08/pdf/E9-24518.pdf

Executive Order 13423, "Strengthening Federal Environmental, Energy, and Transportation

Management", signed January 26, 2007 http://www.gpo.gov/fdsys/pkg/FR-2007 -01-26/pdf /07 -374. pdf

Energy Independence and Security Act of 2007 (EISA P.L. 110-140), signed December 19, 2007 · http: //www.gpo.gov/fdsys/pkg/PLAW-11 0publ140/pdf/PLAW-1 1 0publ140.pdf

Presidential Memorandum: Federal Leadership on Energy Management, published December 5, 2013 http://www.whitehouse.gov/the-press-office/2013/1 2/05/presidential-memorandum- federal-leadership-energy-management

From these laws, executive orders and memorandums, federal agencies are specifically required to

Reduce energy intensity in non-excluded facilities by 3 percent annually or 30% by FY 2015 based on a 2003 base year (E.O. 13423) http://www.gpo.gov/fdsys/pkg/PLAW-109publ58/pdf/PLAW-109publ58.pdf http://www.gpo.gov/fdsys/pkg/FR-2009-10 http://www.gpo.gov/f http://www.gpo.gov/fdsys/pkg/PLAW-11 http://www.whitehouse.gov/the-press-office/2013/1

70LGLY24RGLB00001 Part 9, Attachment

Reduce water intensity (gallons per square foot) by 2% each year through FY 2015 for a total of 16% based on water consumption in FY 2007 {EO 13423}

Use a percentage of their electrical energy from renewable energy (wind, solar, geothermal, and biomass) - {FY13 - 7.5%, FY15 - 10%, FY16 - 15%, FY18 - 17.5% and FY20 - 20%)

In order to accomplish the mandated energy savings requirements, an ESPC implemented updates enterprise-wide for FLETC. With the ESPC contract, FLETC is able to reduce energy cost and meet regulatory requirements for reduction of greenhouse gases.

ESPC Contract

The ESPC contractor, NORESCO, installed energy savings equipment, devices and fixtures throughout many buildings at each FLETC site. With these installations, NORESCO guaranteed FLETC would see a specific energy and water reductions. At Glynco, the energy conservation methods installed included lighting, lighting fixtures, occupancy sensors and controls, water conservation, air conditioning/mechanical controls, a Building 272 HVAC boiler, kitchen vent-hood controls and Direct Digital Control {DOC} upgrades.

The equipment installations were subdivided into groups called Energy Conservation Measures {ECMs). The terms of the ESPC performance period for the ECMs is 17 years and will close out on 08/31/2033.

ESPC Deficiency Reporting Method

To ensure FLETC is achieving the guaranteed savings and adhering to the contract requirements, NORESCO will perform an annual Measurement and Verification report {M&V} and all ESPC related deficiencies will be addressed as required. In addition to the annual M&V, for the first five (5) years of the ESPC, each site will have a monthly NOR ESCO visit which will assist FLETC in reviewing the deficiencies and reviewing trends. The contractor is responsible for adding all ESPC dorm related deficiencies/changes to the FLETC ESPC Deficiency List

- Glynco, GA, attachment #1. The dorm contractor shall forward this deficiency list to their respective COR by the first working day of the month for the previous month for distribution to the ESPC COR. Any “open" items on this list will become part of each month's NORESCO visit report generated by NORESCO _. At each site, the site ESPC COR is responsible for keeping the site's consolidated deficiency list up-to-date and is the · official keeper of that site's list.

For both contractor and FLETC controlled systems and to ensure the ECMs are being maintained properly, the Facilities Management Division {FMD} will perform internal and external audits/reviews as often as necessary to validate ESPC system operations. These reviews will provide system test and verifications as a whole, with specific attention to systems related to the ECMs. Where deficiencies are found, replacements are made, changes are implemented and warranties are addressed, it will be necessary to track and record on FLETC's deficiency list, attachment #1. ESPC items found deficient will be added to the consolidated deficiency list by the ESPC COR or government designated personnel.

In accordance with the existing facilities contract, all fixtures and associated equipment pertaining to ESPC ECMs shall be maintained in working order and when found defective the repairs and replacement parts shall be equal or equivalent to the ESPC ECM installations. The replacement parts shall be approved by the FLETC ESPC Contracting Officer's Representative (COR) prior to installation. The Contractor(s) shall provide a cut-sheet or specifications of replacement parts to the FLETC ESPC COR prior to approval and installation. These replacements shall be tracked and recorded using the FLETC's deficiency list, attachment #1. For each site, the Contractor(s) COR shall provide the recorded information to the ESPC COR by the first working day of the month or as required.

As stated in the ESPC contract: "The Government will maintain adequate and necessary records from inspections, which will be made available during the annual M &V review. These records will contain at a minimum, the ECM's affected, date repair and/or replacement implemented, and description of activities performed and will be provided to the contractor to be included in the annual M & V report. "

ESPC Replacement Parts

Under warranty: All ESPC replacement parts shall be equal or equivalent to the ESPC ECMs installations and approved by the FLETC ESPC COR prior to installation. All ESPC parts under warranty shall be returned for replacement to the ESPC COR in Glynco’s Building 200 or his/her designated official.

Not under warranty: The contractor shall be responsible for the replacement of all non-warrantied ESPC parts per their existing contract. The contractor shall provide and install parts of equal or equivalent performance to the ESPC part(s). Approval shall be requested in writing and obtained from the FLETC ESPC COR prior to the purchase and installation of a replacement part(s), component or system with other than the part, component or system originally installed by the ESPC.

SPECIFIC BUILDINGS WITH ECMs

For Georgia, the ESPC contract is broken into five ECMs:

ECMs:

ECM-01 Lighting upgrades ECM-02 Water Conservation ECM-03 HVAC Controls Upgrade ECM-04 HVAC Equipment Upgrades ECM-10 Kitchen Hood Controls

The following facilities have ESPC Energy Conservation Measures {ECMs} that are maintained by FLETC Glynco contractors.

FLETC Glynco Dorms and Recreational Facilities Buildings: 71, 72, 95, 96, 97, 98, 270, 271, 275, 276, 277 and 278.

FLETC Glynco Dining Hall Facility Building: 75.

.The three ECMs that occurred in Glynco's dorms were ECM- 01 (Lighting), ECM-02 {Water) and ECM-03 {Controls) and the following are detailed breakdowns for each of these ECMs.

ECM-01

Lighting Upgrades

GA Dorm Project Buildings {12 Buildings): Buildings 71, 72, 95, 96, 97, 98, 270, 271, 275, 276, 277, and 278.

This ECM consists of energy efficient upgrades of the existing lighting systems and controls. NORESCO conducted a detailed survey of the lighting systems and found opportunities for fixture upgrades and lighting controls. From the survey data, NORESCO identified economically attractive lighting upgrades and controls and has installed specific retrofits for each location, taking into account the characteristics of and tasks performed in each space.

Specifically, the Glynco, GA ECM -1 Lighting Upgrades, replaced 430 fluorescent fixtures w/ electronic ballasts and T8 lamps, replaced 212 incandescent fixtures with new compact fluorescent hardwired fixtures, replaced 4 incandescent exit signs with new LED exit signs, replaced 333 existing HID fixtures with new fluorescent fixtures with electronic ballasts and T5 lamps, retrofitted 16,759 fluorescent fixtures with new electronic ballast and T8 lamps, retrofitted 15 fluorescent fixtures with new electronic ballasts, TS lamps, and centering kits, retrofitted 1,681 fluorescent fixtures with new electronic ballasts, T8 lamps, and reflectors, retrofit 557 existing fixtures with new

LED

Page 4 of l0 components and retrofit kits, retrofitted 460 existing fixtures occupancy sensors/controls, and removed 6 existing fixture across the Center.

Dorm Equipment Locations:

See Fixture Location in FLETC, Glynco, GA, ESPC, Group 3, Task Order #2, As-Built/Operations, Maintenance and Training Manual, Binder 1 of 5, ECM-01: Lighting Upgrades dated 09 May 2014. This will detail what equipment was installed in a building and in which building area.

Dorm Equipment Upgrades:

Re-lamp & Re-ballast w/ (2) F28T8 Lamps & (1) 2/32 Elec.

Low-Power High Efficiency Ballast 42 H50 WSD 1 LED Wall Pack Fixture w/ 13w LED Bars w/ 350ma LED Driver, Photo-cell

For further details, see Manufacturer's Parts List and Manufacturer's Specification Sheets in FLETC, Glynco, GA, ESPC, Group 3, Task Order #2, As-Built/Operations, Maintenance and Training Manual, Binder1 of 5, ECM-01:

Lighting Upgrades dated 09 May 2014.

Warranty Periods:

Installation Notice Date (Beneficial Use): 11/01/2013 NORESCO Subcontractor Workmanship Warranty Expiration Date (one year) 11/01/2014 Lamps-Three {3} Years (Universal Ballast Coverage) 11/01/2016 Ballasts - Five years from date stamp Ballast Sensors - Five Years 11/01/18 RAB LED Fixtures - Five years 11/01/18

· For further details, see Warranty Information FLETC, Glynco, GA, ESPC, Group 3, Task Order #2, As- Built/Operations, Maintenance and Training Manual, Binder 1 of 5, ECM-01: Lighting Upgrades dated 09 May 2014.

ECM-02

Water Conservation Upgrades

GA Dorm Project Buildings (12 Buildings): Buildings 71, 72, 95, 96, 97, 98, 270, 271, 275, 276, 277, and 278.

This ECM consisted of four elements. This ECM consists of four elements: plumbing retrofits, ice machines, ice cream dipper wells, and pre-rinse sprayers.

The first element retrofits the existing faucets with low-flow aerators, retrofits the existing showerheads to low-flow showerheads and replaces toilets and urinals with new high-efficiency fixtures. These upgrades will reduce water consumption and save water and sewer costs.

NORESCO conducted a detailed survey of the sanitary water system and found opportunities for fixture upgrades in many buildings.

The second element included in this ECM called for installation of the Vizion Chill heat exchanger device on several commercial ice machines and called for the replacement of the existing water- cooled ice machine in the gym with an air-cooled unit. The Vizion Chill installation generates energy savings by pre-cooling the incoming domestic water supply to the unit which reduces required energy consumption for ice-making. Replacement of the water-cooled unit with an air- cooled unit eliminates process water waste for ice machine compressor cooling.

The third element reduced water consumption with the installation of a controllable flow regulator on the valve to the existing ice cream dipper well. This installation reduces water flow to 0.25 GPM and reduces operating hours from constant operation to a maximum of ten hours of daily use.

The fourth element replaced 11existing pre-rinse sprayer nozzles with new low-flow units in the campus cafeteria.

This reduces water consumption and saves energy associated with reduced domestic hot water usage. Existing pre-rinse nozzle flows are based on the manufacturer's specification and field observations where existing units appeared to use less than the intended specification.

Specifically, the Glynco, GA ECM -2, Water Conservation Measure, replaced 1678 toilets, 200 urinals, 985 showerheads, 2201 faucet flow restrictors, 11pre-rinse sprayers, installed 39 chill recovery heat exchangers on ice machines, and 2 timer controls for ice cream dipper wells across the Center.

See Fixture Location in ECM-02 section of FLETC, Glynco, GA, ESPC, Group 2, Task Order #2, As- Built/Operations, Maintenance and Training Manual, ECM-02: Water Conservation; and ECM-04: HVAC Equipment Upgrades dated 09 April 2014. This will detail what equipment was installed in a building and in which building area.

Dorm Equipment Upgrades:

New 1.3 gpf Flush-Valve High Efficiency Toilet (HET) w/ Top Spud - 4 Bolt - Wall Mounted - Rear Discharge China, Elongated Open Seat, Exposed Hand Actuator, 1-1/2" Dia. VBt, 9" Length

New 1.3 gpf Flush-Valve High Efficiency Toilet (HET) w/ Top Spud - 2 Bolt - Floor Mounted - Floor Discharge China, 12" Rough-In, Standard Rim Height, Elongated Open Seat, Exposed Hand Actuator, 1 1/2" Dia. VBt, 9" Length

New "Small Pint" 1/8gpf (0.125 gallon per flush) Flush-Valve Wall Mounted Urinal w/ large footprint, Exposed Sensor Actuator, 3/4" Dia. VBt, 9" Length

New 1.1gpf Pressure-Assist Tank High Efficiency Toilet (HET) w/ 2 Bolt - Floor Mounted - Floor Discharge China, 12" Rough-In, Standard Rim Height, Elongated Open Seat

New 0.5gpm Spray Nozzle w/ Large Male Thread

New 1.0 gpm Aerator Nozzle w/.Large Male Thread New 1.5gpm Chromed Showerhead, Neoprene Faceplate Vizion Chill ICE on existing ice machine

For further details, see Manufacturer's Parts List and Manufacturer's Specification Sheets in FLETC, Glynco, GA, ESPC, Group #2, Task Order #2, As-Built/Operations, Maintenance and Training Manual, ECM-02: Water Conservation; and ECM-04: HVAC Equipment Upgrades dated 09 April 2014.

Warranty Period:

Installation Notice Date (Beneficial Use) 11/1/2013 NORESCO Subcontractor Workmanship Warranty Expiration Date (1Year) 11/1/2014 Scotsman Ice machines - Three (3) years {11/1/16) Crane - Limited Lifetime Warranty on China I Limited 1Year Warranty on Parts Jet-Stream" Showerheads - 20-Years {11/1/2033) Mansfield Vitreous China Products - Limited Lifetime FLUSH MATE® (flushometer tank} - Ten (10} Years & lifetime on tank Zurn (Other than ZGEN6000} - Three (3) Years from date of purchase Zurn Generator (ZGEN6000} - Five (5) years {11/1/2018) - Within warranty period replace w/ZTR sensor valve with long-life lithium battery

For further details, see Warranty Information in FLETC, Glynco, GA, ESPC, Group 2,Task Order #2, As- Built/Operations, Maintenance and Training Manual, ECM-02: Water Conservation; and ECM-04: HVAC Equipment Upgrades dated 09 April 2014.

ECM-03

HVAC Controls Upgrades

GA Dorm Project Buildings (12 Buildings): Building 71, 72, 95, 96, 97, 98, 270, 271, 275, 276, 277 and 278

NORESCO upgraded the existing energy management control system (EMCS} in order to allow for the implementation of several energy saving control strategies. The scope of this ECM includes 28 buildings. The implementation of this measure produces a significant improvement in Glynco's ability to manage and control its HVAC systems. As part of the EMCS upgrade, NORESCO commissioned the control systems at all 28 buildings to ensure proper control system operation including scheduling, set-points, and overrides.

The cost savings achieved through this ECM are primarily generated through the implementation of the following energy saving control strategies:

Unoccupied setback and setup

New uniform occupied temperature set-point of 74°F for cooling and 70°F for heating Supply air temperature reset

Demand controlled ventilation Hot water and chilled water supply temperature reset I> Economizer capability on the air handling units Real Time Pricing (RTP} demand response (via temperature setback and outside air demand limiting) HVAC occupancy control in Dormitories

Specifically, this ECM provided and installed either a new Automated Logic .Controls (ALC} system, or an upgrade to existing ALC systems, over the new multi-site two-way communication network;

for the specified buildings as follows: provided and installed, a new up-to-date ALC control system in buildings 2200 and 2400, upgraded the pre-existing ALC controls with up-to-date software & hardware, perform point to point (P2P} wiring verifications on existing control points, and make appropriate corrections to meet the intent of the new sequences in Buildings 75, 76, 210, 212, 215, 216, 261,263, 272, and 681, upgraded the pre-existing ALC controls with up-to-date software & hardware, and installed new ALC controllers on specified equipment in Buildings 71, 72, 93, 94, 95, 96, 98, 109, 1 6, 221,270, 271, 275, 276, 277, and 278 and implemented new control strategies including, but not limited to: scheduling with temperature start/stop override, unoccupied temperature setback, C02 control, Real Time Pricing (RTP} demand response, occupancy controls, variable speed operation and outside air economizer control across the Center.

The new/upgraded BACnet DDC system includes new points, hardware, software, and control sequences in order to take advantage of the latest energy efficiency strategies.

Heating and air-conditioning requirements for dorm rooms are as follows:

* Heating Mode = Occupied - 70 degrees (F) / Unoccupied Setback - 65 degrees (F)

* Cooling Mode = Occupied - 74 degrees (F) / Unoccupied Setback - 79 degrees (F)

See As-Built Drawings and Sequence of Operations in FLETC, Glynco, GA, ESPC, Group 3, Task Order #2,As-Built/Operations, Maintenance and Training Manual, Binder 3 of 5,ECM-03: HVAC Controls Upgrades (As-Built Controls Drawings & Sequence of Operations) Part 1 (Buildings 71, 72, 75, 76,93, 94, 95, 96, & 98} dated 09 May 2014 and FLETC, Glynco, GA, ESPC, Group 3, Task Order #2,As- Built/Operations, Maintenance and Training Manual, Binder 5 of 5, ECM-03: HVAC Controls Upgrades (As-Built Controls Drawings & Sequence of Operations) Part 3 {Buildings 261, 263, 270, 271, 272, 275,276, 277,278, 681, 2200 & 2400} dated 09 May 2014 These drawings will detail what equipment was installed in a building and in which building area.

Equipment Upgrades:

Manufacturer Equipment Description Model No.

Belden Inc.

Belden Inc.

Automated Logic

Twisted wire 18/2 & 18/3 Arcnet wire ZS pro sensor

6300FE

1585A

ZSPL-H-ALC

Automated Logic Network termination device BT485 Veris Ind. Duct led c02 sensor CDE Bapi Room Humidity sensor ALC/H200-R Automated logic Control module SE6166 Automated Logic Zone controller ZN551 IR-TECH Infrared occ sensor OS-550 Automated Logic Network protection module PROT485 Automated Logic RS pro sensor w/setpoint adj. RSP Automated Logic VAV control module ZN341V+ Automated Logic ZS pro sensor w/setpoint adj. ZSPL-H-ALC Automated Logic Arcnet controller AAR Automated Logic Arcnet repeater REP485 Veris Ind. Duct led c02 sensor CDLCXX Flair Magnetic door switch VIP-39 Automated Logic Network Repeater Module REP485 Automated Logic Duct Humidity Sensor ALC/H200-D-BB Automated Logic Control Module MX080 Automated Logic Control Module ZN141V+ Automated Logic Control Module SE6104 Automated Logic Control Module ZN551 BAPI OA Temp/Humidity Sensor ALC/10k-2-H200-0-WP Automated Logic Control Module SE6104A Veris Ind. Current Switch H308 BAPI Duct Temp Probe ALC/101<-2-D-4-BB HOFFMAN NEMA 112x12x4 Enclosure A-12N124 HOFFMAN Back-panel plate A-12N12P HOFFMAN NEMA 116x20x6.62 Enclosure A-16N20ALP

For further details, see Manufacturer's Product Information and User Manuals in FLETC, Glynco, GA, ESPC, Group 3, Task Order #2, As-Built/Operations, Maintenance and Training Manual, Binder 2 of 5, ECM-03: HVAC Controls Upgrades dated 09 May 2014

Warranty Period:

Installation Notice Date {Beneficial Use) 4/17/2014

NORESCO Subcontractor Workmanship Warranty Expiration Date {1 Year) 4/17/2015 BAPI- Sensors-2 Years (4/17/2016); Thermo-well Limited Lifetime Veris-C02 Sensor 3 Years (4/17/2017); Current Sensor 5 Years (4/17/2019) Current Switches w/ Relay 5 Years (4/17/2019) Pressure Transducer - 5 Years (4/17/2019); Adj. & Fixed Trip Point Current Sensor - 5 Years (4/17/2019): Enclosed Victory Relays- 5 Years (4/17/2019) Belimo- Actuators-5 Years (4/17/2019) l<ele-Occupancy Sensor - 5 Years {4/17/2019); Power Supply - 18 Months {10/17/2015) Flair Electronics-Magnetic Contact - Lifetime

NORESCO Extended O&M Expiration Date:

For the first five years of the ECM-03 post acceptance performance period, NORESCO will provide controls technician assistance time for 40 hours per month (5 days total).

For further details, see Manufacturer's Warranty in FLETC, Glynco, GA, ESPC, Group 3, Task Order #2, As-Built/Operations, Maintenance and Training Manual, Binder 2 of 5, ECM-03: HVAC Controls Upgrades dated 09 May 2014.

SPECIFIC BUILDINGS WITH ECMs
ECMs:
ECM-01
Dorm Equipment Locations:
Dorm Equipment Upgrades:
ECM-03

File details come from the government source that posted it. Updated .