Attachment 48-Fitness and Training Venues.pdf
PDF 172 KB Posted
- Attached to
- Training Support Services
- Solicitation number
- 70LART25RPFB00006
About this file
This is a facilities equipment list detailing the required physical training (PT) venues and equipment for a Federal Law Enforcement Training Center (FLETC) location. The document outlines specific equipment requirements across multiple buildings and training areas.
The main facility, Building 2, contains multiple mat rooms (107, 108, 119, 120, 123, 160, 165, 135, 134, 136, 137) that each must be equipped with 12 blue upright bags, 12 black strike bags, 2 grappling dummies, and 2 cuff dummies. Additional facilities include CPR classrooms, boxing room, weight rooms, PEB room, cardio rooms, and a pool area equipped with life vests, ring buoys, throw bags, duty belts, bricks, kickboards, and leg floats. The gym must have 2 sleds, 2 buckets of basketballs, 2 agility ladders, and foam jump boxes. Mat room 185 requires the same equipment as other mat rooms. Responsibilities include daily setup and cleanup at 0730 and 1630, equipment inspections, maintenance reporting to x8050, and CPR mannequin maintenance. Instructors are responsible for obtaining student issue items from buildings 2 or 8.
View the file
Other files
Show 40 more
Latest 50 of 75 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fitness Equipment and Facili�es:
PT Venues:
• Building 2 mat rooms and classrooms o Mat rooms 107, 108 119, 120, 123. 160, 165, 135, 134, 136, 137 shall have the following:
12 blue upright bags 12 black strike bags 2 grappling dummies 2 cuff dummies o Building 2 classrooms
166 CPR
165 CRP
116 classroom Boxing room Weightroom-return weights Weightroom-return weights Weightroom-return weights PEB room Cardio room Cardio room
• Building 2 pool o Life vest o Ring Bouy o Throw Bags o Duty belts o Bricks o Kickboards o Leg float
• Building 2 Gym o 2 sleds o 2 buckets of basketball o 2 agility ladders o Foam jump boxes
• Mat room 185 o 12 blue upright bags o 12 black strike bags o 2 grappling dummies o 2 cuff dummies
• Building 1003
Responsibili�es: at 0730 and 1630 (when rooms are in con�nuous use, these rooms should be reset at a minimum, prior to 0730 and 1630).
• Mat room/PT venue set up and clean up before and a�er each class.
• Reset mat room and PT venues with required equipment.
• On request would provide addi�onal PT equipment in a mat room PT venue, i.e., extra upright blue bags, cuffing dummy etc. Instructors are s�ll responsible to get building 2 or 8 student issue items themselves.
• A�er each class shall reset mat room PT/PT venue back to original required setup, i.e., correct number of upright blue bags, weights put away correctly.
• Daily inspec�ons of PT training equipment and facility. Shall call 8050 if facility requires work outside this scope (plumbing, electrical, structural, etc…) PT equipment repairs are the requirement of the facility contractor and shall be reported to x8050.
• Replacement/replenishment of CPR Mankin items.
File details come from the government source that posted it. Updated .