This document is a Federal Standard Form 30 Amendment of Solicitation/Modification of Contract for Training Support Services at the Federal Law Enforcement Training Center (FLETC) in Artesia, New Mexico. The amendment extends key procurement dates, with the question deadline moved to 3/14/2025 at 2 PM ET, answers to questions due 3/20/2025, and Phase One due 3/24/2025 at 2 PM ET.
The contract covers a base year from 07/01/2025 to 09/30/2025 with four additional one-year option periods through 09/30/2029. Service lines include Project Management, Issue Support, Recreation, Training Support, Educational Aids, Role Players, and Materials/Supplies. Each year includes a $50,000 not-to-exceed budget for miscellaneous supplies and services, reimbursed at invoiced cost with no markup for overhead or profit. The solicitation requires vendors to review updated FAR clauses, provisions, environmental preferability requirements, and performance work statement sections, with a multi-phased procurement approach.
View the file
Other files for this federal contract opportunity
Show all 50
Training Support Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
70LART25RPFB00006
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
70LART
ARTESIA NM 88210
1300 W RICHEY AVE
FEDERAL LAW ENFORCEMENT TRAINING CENTERS
DEPARTMENT OF HOMELAND SECURITY
02/13/20250003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/13/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to extend the question deadline to 3/14/2025 2PM ET.
Answer to questions 3/20/2025 and Phase One due date of 3/24/2025 2PM ET.
The purpose of this amendment is for updates in FAR via executive orders. Prospective offerors should reread the requirement document “clauses and provisions”, with an emphasis on sections L and M, Environmental Preferability, Performance Work Statement, and period of performance date changes (due to fiscal availability of funds).
Clin xxx7 and 0008 AA/AC IDIQ items. Read Multi phased Procurement (date timelines)
Period of Performance: 07/01/2025 to 09/30/2025
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Nicholas J. Antal
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 13
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70LART25RPFB00006/0003
Change Item 0001 to read as follows(amount shown is the total amount):
0001 Project Management
Base Year 07/01/2025-09/30/2025
C.1, C.1.7.2
Change Item 0002 to read as follows(amount shown is the total amount):
0002 Issue
Base Year 07/01/2025-09/30/2025
C.3.1, C.3.2,C.3.3
Change Item 0003 to read as follows(amount shown is the total amount):
0003 Recreation
Base Year 07/01/2025-09/30/2025
C.4
Change Item 0004 to read as follows(amount shown is the total amount):
0004 Training Support
Base Year 07/01/2025-09/30/2025
C.5
Change Item 0005 to read as follows(amount shown is the total amount):
0005 Ed Aids
Base Year 07/01/2025-09/30/2025
C.6
Change Item 0006 to read as follows(amount shown is the total amount):
0006 Role Players
Base Year 07/01/2025-09/30/2025
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 13
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70LART25RPFB00006/0003
C.7
Change Item 0007 to read as follows(amount shown is the total amount):
0007 Materials and Supplies
Base Year 07/01/2025-09/30/2025
Not to exceed $50,000 SCWR
Clin is for misc. supplies and services in support of the various functional areas and reimbursed at invoiced cost with no markup for overhead, G&A or profit. Vendor invoices are to be submitted with the monthly invoice.
Add Item 0008AA as follows:
0008AA Issue 100 HR
Base Year 07/01/2025-09/30/2025
C.3.1, C.3.2,C.3.3
Add Item 0008AC as follows:
0008AC Training Support 100 HR
Base Year 07/01/2025-09/30/2025
C.5
Change Item 1001 to read as follows(amount shown is the total amount):
1001 Project Management
Option Year One 10/01/2025-09/30/2026
C.1, C.1.7.2
(Option Line Item)
Anticipated Option Exercise Date 09/01/2025
Period of Performance: 10/01/2025 to 09/30/2026
Change Item 1002 to read as follows(amount shown is the total amount):
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 13
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70LART25RPFB00006/0003
1002 Issue
Option Year One 10/01/2025-09/30/2026
C.3.1
C.3.2
C.3.3
(Option Line Item)
Anticipated Option Exercise Date 09/01/2025
Period of Performance: 10/01/2025 to 09/30/2026
Change Item 1003 to read as follows(amount shown is the total amount):
1003 Recreation
Option Year One 10/01/2025-09/30/2026
C.4
(Option Line Item)
Anticipated Option Exercise Date 09/01/2025
Period of Performance: 10/01/2025 to 09/30/2026
Change Item 1004 to read as follows(amount shown is the total amount):
1004 Training Support
Option Year One 10/01/2025-09/30/2026
C.5
(Option Line Item)
Anticipated Option Exercise Date 09/01/2025
Period of Performance: 10/01/2025 to 09/30/2026
Change Item 1005 to read as follows(amount shown is the total amount):
1005 Ed Aids
Option Year One 10/01/2025-09/30/2026
C.6
(Option Line Item)
Anticipated Option Exercise Date 09/01/2025
Period of Performance: 10/01/2025 to 09/30/2026
Change Item 1006 to read as follows(amount shown
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
5 13
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70LART25RPFB00006/0003
is the total amount):
1006 Role Players
Option Year One 10/01/2025-09/30/2026
C.7
(Option Line Item)
Anticipated Option Exercise Date 09/01/2025
Period of Performance: 10/01/2025 to 09/30/2026
Change Item 1007 to read as follows(amount shown is the total amount):
1007 Materials and Supplies
Option Year One 10/01/2025-09/30/2026
Not to exceed $50,000 SCWR
SCWR
Clin is for misc. supplies and services in support of the various functional areas and reimbursed at invoiced cost with no markup for overhead, G&A or profit. Vendor invoices are to be submitted with the monthly invoice.
(Option Line Item)
Anticipated Option Exercise Date 09/01/2025
Period of Performance: 10/01/2025 to 09/30/2026
Add Item 1008AA as follows:
1008AA Issue 100 HR
Option Year One 10/01/2025-09/30/2026
C.3.1
C.3.2
C.3.3
(Option Line Item)
Anticipated Option Exercise Date 09/01/2025
Period of Performance: 10/01/2025 to 09/30/2026
Add Item 1008AC as follows:
1008AC Training Support 100 HR
Option Year One 10/01/2025-09/30/2026
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
6 13
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70LART25RPFB00006/0003
C.5
(Option Line Item)
Anticipated Option Exercise Date 09/01/2025
Period of Performance: 10/01/2025 to 09/30/2026
Change Item 2001 to read as follows(amount shown is the total amount):
2001 Project Management
Option Year Two 10/01/2026-09/30/2027
C.1, C.1.7.2
(Option Line Item)
Anticipated Option Exercise Date 09/01/2026
Period of Performance: 10/01/2026 to 09/30/2027
Change Item 2002 to read as follows(amount shown is the total amount):
2002 Issue
Option Year Two 10/01/2026-09/30/2027
C.3.1
C.3.2
C.3.3
(Option Line Item)
Anticipated Option Exercise Date 09/01/2026
Period of Performance: 10/01/2026 to 09/30/2027
Change Item 2003 to read as follows(amount shown is the total amount):
2003 Recreation
Option Year Two 10/01/2026-09/30/2027
C.4
(Option Line Item)
Anticipated Option Exercise Date 09/01/2026
Period of Performance: 10/01/2026 to 09/30/2027
Change Item 2004 to read as follows(amount shown is the total amount):
2004 Training Support
Option Year Two 10/01/2026-09/30/2027
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
7 13
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70LART25RPFB00006/0003
C.5
(Option Line Item)
Anticipated Option Exercise Date 09/01/2026
Period of Performance: 10/01/2026 to 09/30/2027
Change Item 2005 to read as follows(amount shown is the total amount):
2005 Ed Aids
Option Year Two 10/01/2026-09/30/2027
C.6
(Option Line Item)
Anticipated Option Exercise Date 09/01/2026
Period of Performance: 10/01/2026 to 09/30/2027
Change Item 2006 to read as follows(amount shown is the total amount):
2006 Role Players
Option Year Two 10/01/2026-09/30/2027
C.7
(Option Line Item)
Anticipated Option Exercise Date 09/01/2026
Period of Performance: 10/01/2026 to 09/30/2027
Change Item 2007 to read as follows(amount shown is the total amount):
2007 Materials and Supplies
Option Year Two 10/01/2026-09/30/2027
Not to exceed $50,000 SCWR
SCWR
Clin is for misc. supplies and services in support of the various functional areas and reimbursed at invoiced cost with no markup for overhead, G&A or profit. Vendor invoices are to be submitted with the monthly invoice.
(Option Line Item)
Anticipated Option Exercise Date 09/01/2026
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
8 13
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70LART25RPFB00006/0003
Period of Performance: 10/01/2026 to 09/30/2027
Add Item 2008AA as follows:
2008AA Issue 100 HR
Option Year Two 10/01/2026-09/30/2027
C.3.1
C.3.2
C.3.3
(Option Line Item)
Anticipated Option Exercise Date 09/01/2026
Period of Performance: 10/01/2026 to 09/30/2027
Add Item 2008AC as follows:
2008AC Training Support
Option Year Two 10/01/2026-09/30/2027
C.5
(Option Line Item)
Anticipated Option Exercise Date 09/01/2026
Period of Performance: 10/01/2026 to 09/30/2027
Change Item 3001 to read as follows(amount shown is the total amount):
3001 Project Management
Option Year Three 10/01/2027-09/30/2028
C.1, C.1.7.2
(Option Line Item)
Anticipated Option Exercise Date 09/01/2027
Period of Performance: 10/01/2027 to 09/30/2028
Change Item 3002 to read as follows(amount shown is the total amount):
3002 Issue
Option Year Three 10/01/2027-09/30/2028
C.3.1
C.3.2
C.3.3
(Option Line Item)
Anticipated Option Exercise Date 09/01/2027
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
9 13
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70LART25RPFB00006/0003
Period of Performance: 10/01/2027 to 09/30/2028
Change Item 3003 to read as follows(amount shown is the total amount):
3003 Recreation
Option Year Three 10/01/2027-09/30/2028
C.4
(Option Line Item)
Anticipated Option Exercise Date 09/01/2027
Period of Performance: 10/01/2027 to 09/30/2028
Change Item 3004 to read as follows(amount shown is the total amount):
3004 Training Support
Option Year Three 10/01/2027-09/30/2028
C.5
(Option Line Item)
Anticipated Option Exercise Date 09/01/2027
Period of Performance: 10/01/2027 to 09/30/2028
Change Item 3005 to read as follows(amount shown is the total amount):
3005 Ed Aids
Option Year Three 10/01/2027-09/30/2028
C.6
(Option Line Item)
Anticipated Option Exercise Date 09/01/2027
Period of Performance: 10/01/2027 to 09/30/2028
Change Item 3006 to read as follows(amount shown is the total amount):
3006 Role Players
Option Year Three 10/01/2027-09/30/2028
C.7
(Option Line Item)
Anticipated Option Exercise Date 09/01/2027
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
10 13
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70LART25RPFB00006/0003
Period of Performance: 10/01/2027 to 09/30/2028
Change Item 3007 to read as follows(amount shown is the total amount):
3007 Materials and Supplies
Option Year Three 10/01/2027-09/30/2028
Not to exceed $50,000 SCWR
SCWR
Clin is for misc. supplies and services in support of the various functional areas and reimbursed at invoiced cost with no markup for overhead, G&A or profit. Vendor invoices are to be submitted with the monthly invoice.
(Option Line Item)
Anticipated Option Exercise Date 09/01/2027
Period of Performance: 10/01/2027 to 09/30/2028
Add Item 3008AA as follows:
3008AA Issue 100 HR
Option Year Three 10/01/2027-09/30/2028
C.3.1
C.3.2
C.3.3
(Option Line Item)
Anticipated Option Exercise Date 09/01/2027
Period of Performance: 10/01/2027 to 09/30/2028
Add Item 3008AC as follows:
3008AC Training Support 100 HR
Option Year Three 10/01/2027-09/30/2028
C.5
(Option Line Item)
Anticipated Option Exercise Date 09/01/2027
Period of Performance: 10/01/2027 to 09/30/2028
Change Item 4001 to read as follows(amount shown is the total amount):
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
11 13
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70LART25RPFB00006/0003
4001 Project Management
Option Year Four 10/01/2028-09/30/2029
C.1, C.1.7.2
(Option Line Item)
Anticipated Option Exercise Date 09/01/2028
Period of Performance: 10/01/2028 to 09/30/2029
Change Item 4002 to read as follows(amount shown is the total amount):
4002 Issue
Option Year Four 10/01/2028-09/30/2029
C.3.1
C.3.2
C.3.3
(Option Line Item)
Anticipated Option Exercise Date 09/01/2028
Period of Performance: 10/01/2028 to 09/30/2029
Change Item 4003 to read as follows(amount shown is the total amount):
4003 Recreation
Option Year Four 10/01/2028-09/30/2029
C.4
(Option Line Item)
Anticipated Option Exercise Date 09/01/2028
Period of Performance: 10/01/2028 to 09/30/2029
Change Item 4004 to read as follows(amount shown is the total amount):
4004 Training Support
Option Year Four 10/01/2028-09/30/2029
C.5
(Option Line Item)
Anticipated Option Exercise Date 09/01/2028
Period of Performance: 10/01/2028 to 09/30/2029
Change Item 4005 to read as follows(amount shown is the total amount):
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
12 13
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70LART25RPFB00006/0003
4005 Ed Aids
Option Year Four 10/01/2028-09/30/2029
C.6
(Option Line Item)
Anticipated Option Exercise Date 09/01/2028
Period of Performance: 10/01/2028 to 09/30/2029
Change Item 4006 to read as follows(amount shown is the total amount):
4006 Role Players
Option Year Four 10/01/2028-09/30/2029
C.7
(Option Line Item)
Anticipated Option Exercise Date 09/01/2028
Period of Performance: 10/01/2028 to 09/30/2029
Change Item 4007 to read as follows(amount shown is the total amount):
4007 Materials and Supplies
Option Year Four 10/01/2028-09/30/2029
Not to exceed $50,000 SCWR
SCWR
Clin is for misc. supplies and services in support of the various functional areas and reimbursed at invoiced cost with no markup for overhead, G&A or profit. Vendor invoices are to be submitted with the monthly invoice.
(Option Line Item)
Anticipated Option Exercise Date 09/01/2028
Period of Performance: 10/01/2028 to 09/30/2029
Add Item 4008AA as follows:
4008AA Issue 100 HR
Option Year Four 10/01/2028-09/30/2029
C.3.1
C.3.2
C.3.3
(Option Line Item)
Anticipated Option Exercise Date 09/01/2028
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
13 13
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70LART25RPFB00006/0003
Period of Performance: 10/01/2028 to 09/30/2029
Add Item 4008AC as follows:
4008AC Training Support 100 HR
Option Year Four 10/01/2028-09/30/2029
C.5
(Option Line Item)
Anticipated Option Exercise Date 09/01/2028
Period of Performance: 10/01/2028 to 09/30/2029
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
File details come from the government source that posted it. Updated .