Attach_9_-_INFOR_Routine_PM_WOR_Codes,_Operations_Data,_and_Mail_Run.pdf
PDF 566 KB Posted
- Attached to
- NETC Facility O&M Support Services
- Solicitation number
- 70FA2018R00000013
About this file
Attach 9 - INFOR Routine PM WOR Codes, Operations Data, and Mail Run
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP# 70FA2018R00000013
Attachment 9
TABLE OF CONTENTS
INFOR Routine Preventative Maintenance Work Requirements by Task Code & Description
OPERATIONS HISTORICAL DATA
WAREHOUSE
MAILROOM
COPIER ROOM OPERATIONS
WORK ORDERS BY SECTION
NETC CAMPUS MAILRUN
INFOR Routine Preventative Maintenance Work Requirements by Task Code & Description
Task Description
A-01 Air Dryer, Refrigerated/Regenerative
A-02 Water Fountain
A-03 Humidification Systems
A-04 Air Compressor
A-05 Dehumidification, PKG Unit
A-06 Air Conditioning, PKG Unit, Comfort
A-07 Air Conditioning Machine
A-08 Air Conditioning – Unit/Window
A-09 Air Cooled Condenser
A-10 Heat Pump
A-11 Air Handler Unit
A-12 VRF Condenser
A-13 Water Source H/P Condenser
A-16 Unitary Heating and Cooling Unit
A-17 AV Equipment/LCD Projectors
B-01 Battery Charger
B-02 Boiler (Coal, Oil, Gas)
B-03 Burner, Gas
B-04 Burner, Oil
B-05 Electric Boilers
C-02 Remote Air Intake Dampers
C-03 Coils, Preheat, Reheat, etc.
C-04 Central Mini-Computer HVAC System
C-05 Auto Mixing Box, Pneumatic or Electric
C-06 Controls, Central System
C-07 Condensate or Vacuum Pump
C-08 Central Control Panel
C-09 Cooling Tower, Maintenance
C-10 Cooling Tower, Cleaning
C-11 Evaporative Condenser
C-21 Carts, & Scooters, Engine or Battery Monthly Equipment Inspection Log
D-01 Door, Power Operated
D-03 Drains, Gutter
D-04 Door, Automatic Hydraulic, Electric or Pneumatic Operated – Main Entrance
D-05 Door, Main Entrance
D-06 Drains, Areaway/Driveways/Storm
D-07 Clothes Dryer
D-08 Electronic Door Lock, Interior Units
D-09 Electronic Door Lock, Exterior Units
D-10 Door Manual Overhead
D-13 Exhaust Duct – PBS P 5850.1B
D-15 Tow Motor (Forklift) (Pallet Truck)
D-16 Hand Dryers
D-17 Dorm Inspection
D-18 Damper, Motor Operated
E-01 Elevator, Electric/Hydraulic
E-13 Kitchen Electrical Equipment
E-15 Handicapped Lifts
E-17 Expansion Joints in Piping
E-18 Emergency Lights (Wet Cell)
E-19 Emergency Lights
E-20 Induction Disc Over Current Relay
E-21 Over and/or Under Voltage Relay
E-22 Variable Frequency Drive
E-25 Low Voltage Molded Cased CB Panels
E-26 Low Voltage Molded Cased CB
E-27 Low Voltage Power Circuit Breaker
E-28 Motor Starters – 100 Horsepower and Up
E-29 High Voltage Oil Circuit Breaker
E-30 Switchboards, Medium Voltage
E-32 High Voltage Network and Power Oil Transformer
E-33 High Voltage Network and Power Dry Type Transformers
E-34 Disconnects
E-35 Motor Control CNTR (Under 100 HP)
E-36 Automatic Transfer Switch
E-37 Aluminum Bus Duct and Connectors
E-38 High Voltage Air Circuit Breaker
E-39 Supervision Set
E-40 Emergency Generator, Electric, Gasoline, or Natural Gas
E-41 Emergency Generator, Electric Diesel Power
E-41-1 Generator (Weekly)
E-42 Emergency Generator, Electric
E-43 Lead Acid Battery
E-44 Edison Nickel-Iron – Alkaline Battery (Per Cell)
E-56 Dimmer/Control, Stage/General Light
E-57 Low Voltage Dry Transformer
E-58 High Voltage Network (Daily)
E-58-1 High Voltage Network (Annually)
F-01 Alarm Check Valves/Accessories
F-02 Dry Pipe, Deluge/Pre-act Valves
F-03 Fire Post Indicator Valve
F-04 Fire Control Valves/Interior
F-05 Fire Pump (Motor/Engine Driven)
F-06 Fire Pump (Monthly PM)
F-07 Fire Pump (Annual PM)
F-08 Fire Hose (1.5” Racked in Buildings
F-09 Fire Department Hose Connection
F-10 Fire Department Pumper Connections
F-11 Fire Doors – Stairwell/Exits
F-12 Fire Doors – Sliding Types
F-13 Fire Supervisory Signal Test
F-14 Automatic Fire Detection
F-15 Fire Alarm Control Panel, MXL
F-16 Fire Alarm System – Recorder
F-17 Pull Station
F-18 Fire and Smoke Dampers
F-19 Fire Hydrant – Dry/Wet Barrel
F-20 Sprinkler Head
F-21 Fire Extinguisher – Soda Acid or Foam
F-22 Fire Extinguishers Annual
F-23 Fire Extinguishers Annual
F-24 Fire Extinguishers Monthly
F-25 Fire Extinguishers, Hydrostatic Testing
F-26 Fire Extinguishers System CO1, Halon
F-27 Fan Centrifugal
F-28 Filter, Movable Curtain, Oil Coated
F-29 Filter, Roll Type, Disposable
F-30 Filters, Reusable
F-31 Filter, Roll Type, Disposable Media
F-32 Filter, Throw Away
F-33 Filter, Electrostatic
F-34 Fluorescent Light Fixture, Washing and Re-lamping
F-35 Fluorescent Light Fixture, Re-lamping Only
F-36 Fan, Propeller, 24” or Larger
F-37 Floor Polishing Machine
F-38 Lighting Protection
F-45 Security System Testing
F-50 Non-Supervised Smoke Detector Inspection
F-56 Flag Pole Inspection
G-02 Grease Traps
G-03 Powered Sliding Gate
G-04 Powered Swinging Gate
G-05 Generator
H-01 Hot Water Converter
H-02 Hot Water Heater, Gas
H-03 Hot Water Heater, Electric
H-04 Heat Pump Water Heater
H-06 Hot Air Furnace
H-14 Hoist, Lighting
I-02 Fan coil unit, floor model
I-03 Induction Units, Under Window Type
I-04 Fan Coil Unit, Ceiling Hung
K-17 Ice Machine
L-01 Lawn Mower, Edger, Blowers, Chain Saws, Pump, etc.
L-02 Loading Ramp, Adjustable
L-03 Lighting, Special Fixture
L-04 Lighting, Outside
L-10 Lift, Electric, Stage Screen, Portable
L-12-1 JLG Lift
L-12-2 Lift
L-12-3 Lift
M-01 Manhole, Electrical
M-02 Manhole, Sewer
M-03 Motors in Excess of 1 Horsepower
O-01 Typewriter
O-02 Fax Machine
P-03 Waste Water Pump – Unit Heater – Steam/Hot Water
P-04 Pump, Centrifugal
R-01 Radiator, Heating
R-02 Roof Inspection
R-04 Refrigeration Leak Detection Monitor
R-05 Refrigeration Machine, Centrif
R-06 Refrigeration Machine. Recip and Scroll
R-09 Radiation Baseboard
R-13 Refrigerators (Dorm and Office)
R-13-A Kitchen Refrigeration Equipment – Semiannual
S-01 Cooling Tower Sump Pump
S-02 Sewage Ejector
S-03 FETN Satellite Receiver
S-05 Sweeper/Mower/Rotary Broom
S-06 Sewage Ejector, Sump Type
S-07 Sump Pump
S-08 Strainer, Y-Type
S-10 Scrubbing Machine (Battery or Propane Powered)
S-11 Snow Blower
S-13 Kitchen Steam Equipment
T-01 Tank, Water
T-02 Tank, Air/Refrigerant/LP Gas
T-03 Tank, Fuel Oil Storage
T-04 Glycol Feed System
T-05 Trash Compactor
T-06 Tank, Air Separator
T-07 Tank, Bypass Feeder
T-19 Carpet Cleaning
U-01 Unit Heaters (Steam and Hot Water)
U-02 Unit Heater (Gas and Oil Fired)
UPS Uninterruptible Power System Semiannual
V-01 Vacuum Cleaner, Heavy Duty
V-02 Valve, Safety Relief
V-03 Valves, Regulating
V-04 Valve, Safety Relief Domestic
V-05 Valve, Manually Operated
V-06 Valve, Motor Operated
V-07 Valve, Hydraulic, Pneumatic, Electric
V-08 Valve, Check
V-09 Backflow Preventer
V-10 Valve, Balancing
V-11 Valve, Thermostatic Water Controller
V-12 Vehicle Cleanup and Maintenance
V-13 Vehicle Repair and Maintenance As Per Vehicle Report
W-01 Drinking Water Filter Systems
W-02 Emergency Wash
W-03 Water Softener
W-04 Filter, Water
W-05 Clothes Washing Machine
W-07 Wheelchair lift
W-10 Weight Room Exercise Equipment
X-23 Heater Unit, Electric
X-41 Tractor, Diesel
OPERATIONS HISTORICAL DATA
WAREHOUSE
Deliveries: 3064 (Incoming from UPS/Fed Ex/Other Carriers)
Supply Orders/Deliveries: 1499
Outgoing Shipments: 4995 (Fed Ex/UPS/Other Carriers)
Deliveries: 3341 (Incoming from UPS/Fed Ex/Other Carriers)
Supply Orders/Deliveries: 1507
Outgoing Shipments: 5065 (Fed Ex/UPS/Other Carriers)
Deliveries: 3629 (Incoming from UPS/Fed Ex/Other Carriers)
Supply Orders/Deliveries: 1251
Outgoing Shipments: 4972 (Fed Ex/UPS/Other Carriers)
MAILROOM
U.S. Postal Service Incoming Pieces of Mail: 5186
U.S. Postal Service Outgoing Pieces of Mail: 8049
U.S. Postal Service Incoming Pieces of Mail: 2315
U.S. Postal Service Outgoing Pieces of Mail: 7802
U.S. Postal Service Incoming Pieces of Mail: 2068
U.S. Postal Service Outgoing Pieces of Mail: 4875
COPIER ROOM OPERATIONS
Total # of Requests: 1268
Total # of Pages: 305,022
Total # of Copies: 8,320,624
Total # of Impressions: 4,135,881
Total # of Requests: 1220
Total # of Pages: 292,114
Total # of Copies: 86,958
Total # of Impressions: 5,238,158
Total # of Requests: 1243
Total # of Pages: 264,970
Total # of Copies: 65,534
Total # of Impressions: 4,279,981
WORK ORDERS BY SECTION
Maintenance Section: 851
HVAC/Plumbing Section: 457
Electrical Section: 315
Moves/Setups: 1416
Engraving Section: 41
Housekeeping Section: 22
Student Services Section: 0
Grounds Section: 204
Maintenance Section: 784
HVAC/Plumbing Section: 416
Electrical Section: 329
Moves/Setups: 974
Engraving Section: 35
Housekeeping Section: 36
Student Services Section: 0
Grounds Section: 220
Maintenance Section: 2193
HVAC/Plumbing Section: 1011
Electrical Section: 608
Moves/Setups: 2007
Engraving Section: 71
Housekeeping Section: 67
Student Services Section: 2
Grounds Section: 389
NETC CAMPUS MAILRUN
8:00 – 10:00 Vehicle Check/Sorting of Mail/Delivery of Signature Mail
Begin Run 10:00
I-216 Admissions
I-2nd Floor Outside Room 229 Hallway
N-102 USFA
N-4th Floor 406 (Copy Room)
K-Kitchen
K-2nd Floor (Independent Study)
L – Lobby
S-110 Simulation Lab
J-2nd Floor Room 207
J-2nd Floor Room 227
G-1st Floor
G-2nd Floor
H-3rd Floor
H-2nd Floor
H-Basement
F-117 EMI
E-003
E-Budget Room 112
E-113 EMI
E-101
E-3rd Floor
D-Housekeeping
11:30 – 12:00 Lunch Break
12:30 Resume Run
C-Lobby
D-107 Procurement
N-LRC
N-4th Floor Room 406 (Copy Room)
N-3rd Floor (N-300A)
N-102 USFA
O-Basement
V-Security
M-Computer Lab
I-116
I-120 Publications
I-2nd Floor Outside Room 229 Hallway
I-216 Admissions
3:00 - 3:30 Outgoing Mail Run to Emmitsburg Post Office, Fuel Government Vehicle
If required deliver any mail items for O’Leary’s, B Building Recreation Association, and NFFF.
File details come from the government source that posted it.