TANK 5A
1 REMOVE TANK 5A BLADDER CELL.
Note
ROUTE BLADDER CELL TO OSV FOR INSP/REPAIR.
2 REMOVE LOWER CENTER, LEFT AND RIGHT TANK 5A FLOOR PANELS,2 EACH FLOOR PANELS ON L/H & R/H SIDES, REMOVE 3 EACH ACCESS PANELS ON L/H & R/H SIDEWALL PANELS, REMOVE BOMB BAY DOOR UPLOCK COVER TO INCLUDE ALL TAPE.
3 PERFORM ZONAL INSPECTION OF THE FUEL CELL CAVITY AND SIDE WALL AREA INSIDE FUSELAGE.
4 MASK, PREP, PRIME AND TOP COAT WHITE TANK 5A CAVITY INTERIOR BELLY SKIN AND STRUCTURE.
5 INSTALL, LOWER CENTER, LEFT AND RIGHT TANK 5A FLOOR PANELS,2 EACH FLOOR PANELS ON L/H & R/H SIDES, INSTALL 3 EACH ACCESS PANELS ON L/H & R/H SIDEWALL PANELS, INSTALL BOMB BAY DOOR UPLOCK COVER, & APPLY TAPE.
6 INSTALL TANK 5A BLADDER.