Attachment L003_ES_ Sample Task Order.pdf
PDF 460 KB Posted
- Attached to
- PROGRAM SUPPORT SERVICES 693KA9-20-R-00001 AMENDMENT #5 Federal contract opportunity
- Solicitation number
- 693KA9-20-R-00001
About this file
This document includes a sample task order and related solicitation for program support services. The task order outlines required support across multiple directorates and programs within the Federal Aviation Administration, including systems engineering, software engineering, safety management, and other services. Responses to the solicitation were due by April 8, 2020, and contract awards are scheduled for November 2020. The period of performance is seven years with options. The solicitation identifies incumbent contractors and sets aside a portion of the opportunity for small businesses. The task order lists estimated labor hours by category for three base periods and outlines deliverables and reporting requirements.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Program Support Services (PSS) –
Attachment L003 Sample Task Order 693KA9-20-R-00001
ENTERPRISE SERVICES
SAMPLE TASK ORDER
(For Evaluation Puposes Only)
A. GENERAL INFORMATION
Contractor: TBD
Period of Performance: Base Period 1: 02/01/2021 – 01/31/2022
Base Period 2: 02/01/2022 – 01/31/2023
Base Period 3: 02/01/2023 – 01/31/2024
Task Order Contract Type: T&M
Estimated Labor Hours: TBD
Contracting Officer’s Representative: TBD
Task Order Representative: TBD
This task order is pursuant to G.1.1 Placement of Task Orders Against the Contract as well as other sections of the contract.
B.1 TASK ORDER CEILING INFORMATION
The ceiling value for each Subtask in this Task Order (TO) is in the amount shown below. This
TO ceiling cannot be exceeded except by approval and modification by the FAA Contracting
Officer. The contractor shall not exceed this amount without authorization of the FAA Contracting
Officer.
Base Period 1 Base Period 2 Base Period 3
Estimated Labor Cost: TBD TBD TBD
Estimated ODCs (Travel and Materials): TBD TBD TBD
Estimated Total Cost: TBD TBD TBD
B.2 FUNDING INFORMATION
Per 3.3.1-14 Limitation of Funds, the incremental funding provided for this TO is in the amount shown below and represents the Government’s maximum liability for this task unless modified in writing by the FAA Contracting Officer. The contractor shall not exceed this amount without additional funding provided by the Contracting Officer.
PR Number(s) Accounting Data Amount Funded
See Attached TBD
The period of allotment is through September 30, 2021.
C. SCOPE
The Enterprise Services directorate is responsible for the implementation and execution of the systems and services that tie ground systems and aircraft together through communications, navigation, weather and aeronautical information and flight services in the National Airspace
System (NAS). The directorate plays a critical role in establishing infrastructure for NextGen.
The directorate requires support services for the following programs and initiatives:
• Communications, Information & Network Programs Group AJM-3100
― Air Ground Voice Services
• Navigation Programs Group AJM-3200
― Satallite Navigation
― Ground Based NAVAIDS & Lighting Systems
― NAS Implementation
― Navigation Program Engineering
― Navigation Program Support Team
• Aviation Weather & Aeronautical Services Programs Group AJM-3300
― Aviation Weather Dissemination
― Aviation Weather Observation
― NextGen Weather Systems
― Aviation Weather Services
― Unmanned Aircraft Systems
• Data Communications Group AJM-3400
― DataComm
• Program Engineering Services Group AJM-3500
― Integrated Risk Management
― Specialty Engineering
As identified in section D, the Contractor shall provide all necessary technical, managerial, administrative, cost and financial support such as: engineering, logistics, configuration management, planning, organizing, managing, coordinating, and tracking cost, schedule, performance and program management for the maintenance of existing and the acquisition and implementation of new or enhanced products, systems and services into the NAS.
D. STATEMENT OF WORK
The Contractor must provide support to the Enterprise Services directorate (AJM-3) in accordance with the following Program Support Services (PSS) Statement of Work (SOW) functional areas:
D.1 System Engineering
The Contractor must support all aspects of systems engineering for the programs and initiatives that comprise the Enterprise Services directorate (AJM-3). System engineering task include, but are not limited to, the following: operational concepts and requirements preparation/review;
problem reports tracking and analysis; developing and validating systems requirements;
engineering studies and assessments; risk assessments; interface analysis; architecture and design assessments; mission need analysis; life-cycle cost analysis; technical evaluations and studies;
cost-benefit assessments; Reliability Maintainability and Availability (RMA) analysis;
maintaining databases; system design analysis; performance analyses; documentation reviews;
technical meetings participation/facilitation; and the testing, evaluation, integration and installation of software.
D.2 Software Engineering
The Contractor must support all aspects of software engineering involving the design, development, testing, maintenance for the Aviation Weather Dissemination and Observation programs and the PMO Integrated Risk Management software. Support tasks include, but are not limited to: requirements verification and validation; test and evaluation procedures review; specification compliance assessments; monitor coding and unit/string testing; software development estimates and assessments; test support for factory acceptance testing, Operational Test and Evaluation (OT&E) support and software maintenance.
D.3 Hardware Engineering Support
The Contractor must support all aspects of hardware engineering involving the design, development, testing, maintenance and related hardware activity for the DataComm programs.
Support tasks include, but are not limited to: technical meetings participation/facilitation;
documentation reviews; requirements analysis; specification compliance assessments; hardware development estimates and assessments; monitor development activities; monitor hardware product procurement; monitor integration and testing; analysis and metric generation for program technical reports; hardware transition planning; hardware maintenance activities; parts obsolescence; hardware selection evaluations; Preliminary Design Review (PDR), Critical
Design Review (CDR) and Production Readiness Review (PRR).
D.4 Human Factors Engineering
The Contractor must support all aspects of human engineering for the Program Engineering
Services Group. Human factors engineering task include, but are not limited to, the following:
human factors planning; design and analysis of early operational evaluations/involvement;
human factors engineering assessments; human factors design requirements; review contractor deliverables; technical interchange meetings participation/facilitation; testing of user-system interface attributes; human factors studies; and human factors engineering assessments.
D.5 Information System Security Support
The Contractor must support all aspects of Information Systems Security (INFOSEC) for the
Aviation Weather Services programs. Support tasks include, but are not limited to: identification of threats; performance of risk and vulnerability assessments; risk analyses and risk mitigation recommendations; incident detection and remediation; testing of proposed and applicable security solutions; development of security policies and requirements; review of INFOSEC documentation; and development of security certification and authorization packages.
D.6 Safety Management Support
The Contractor must support all aspects of the implementation of the Safety Management
System across the Aviation Weather Dissemination and Observation and Weather Services programs. Task and activities involve measures to mitigate hazards or reduce risk to an acceptable level, verification that mitigation measures are incorporated into product design and implementation, and assessment of residual risk and other safety related activities. Support tasks include, but are not limited to: generation of Program Safety Plans (PSP); safety risk analysis and documentation; validation/verification of the implementation of risk mitigation actions;
generation of System Safety Assessment Reports (SSAR); safety assurance activities;
participation/facilitation of Safety Risk Management Panels (SRMP); and safety education activities.
D.7 Strategic Planning Support
The Contractor must support all aspects of strategic planning, scheduling and coordination, providing a variety of technical and administrative support for strategic planning functions for the Enterprise Services directorate (AJM-3). Support tasks include, but are not limited to: the development, execution, and identification of solutions to complex issues for the aviation weather programs; develop long-range visions, strategic, tactical, operational plans and organizational goals; develop an overall framework and program management plan for addressing Unmanned Aircraft Systems (UAS) concepts; strategic communications planning;
analysis of planning requirements; integrated schedule development and integration planning;
and, develop, maintain and execute business plans.
D.8 Program Management Support
The Contractor must support all aspects of Program Management involving the planning, developing, organizing, coordination and conduct of Enterprise Services organizational activities to ensure FAA operational policies, processes and program elements are integrated, and documented within the directorate. Support tasks include but are not limited to: evaluating program structure, roles and functionality to identify and facilitate changes that maximize effectiveness and efficiency; minimize redundancies, and standardize organizational elements;
conducting program and or organizational analysis and process mapping to identify barriers to achieving directorate goals and objectives; working with intact groups/teams to enhance their efficiency through improved processes and systems; providing personnel to perform and assist with day-to-day activities of project and contract management, and acquisition surveillance activities using the FAA Acquisition Management System (AMS); participation in organization management meetings and reviews; development of practices, metrics, technical, programmatic and financial plans and procedures; preparation, submittal and execution of budgets across
Enterprise Services programs and projects; provide assistance in the overall management of the budget process.
D.9 Business, Financial and Acquisition Management Support
The Contractor must support all aspects of financial management involving the budget processes for the Air/Ground Voice Services, Aviation Weather Services and Acquisition Excellence programs. Tasks include, but are not limited to: developing program documentation for investment decisions, including OMB-300’s and acquisition strategy papers, briefing and presentations; developing and maintaining contract and technical documentation for cost, schedule and technical requirements; developing and maintaining project schedules; developing documentation and analysis for internal and external communications; monitoring and tracking programs financial performance; cost estimating support; developing and maintaining financial plans, and reconciling financial transactions; developing financial reports, statements, and data of both factual and analytical nature; and Earned Value Management (EVM) maintenance and analysis.
D.10 Logistics Support
The Contractor must support all aspects of integrated logistic activities and transition team support for the Aviation Weather Services programs. Support tasks include, but are not limited to: logistics engineering; tracking prime contractor contract performance and monitoring logistic activity; logistics support analysis; maintenance concept; provisioning analysis; spares acquisition plan; long lead items list; Washington Item Management; parts substitution list;
integrated support planning; logistic support analysis; technical publications provisioning and training; transition team support; logistics briefings to the sites; managing unallocated assets;
reviews of Integrated Logistics Support Plan (ILSP).
D.11 Operational Support
The Contractor must support all aspects of field operations and its sustainment involving the planning, execution, transition, and integration support activities, for the Enterprise Services programs. Support tasks include, but are not limited to: planning the hardware, software and process evolution; development of life cycle implementation activities; scheduling field support activities; technical coordination with FAA Service Center Offices; participation in acquisition management support activities; initiating deployments (i.e. site surveys, installations, and technical refresh activities; In-Service-Reviews (ISR) and related activities; resolution of ISR related issues; monitoring program trouble reports; update of system technical documentation;
preparing and coordinating task orders, specifications, statement of works, and contract changes.
E. DELIVERABLES
The deliverables for this task are as follows:
F. TRAVEL
The contractor may be required to travel to locations in the continental United States. All travel must be conducted in accordance with the Federal Travel Regulations and FAA Travel
Regulations and with prior approval of the COR.
G. ODCs
Material and equipment required to support this task order will be identified in the Work Order.
Item
No.
Deliverable Due Date Medium
No of
Copies Recipient
Program Engineering documentation draft 14 days After
Receipt of Order
(ARO),
final 30 days after FAA comment
Hard copy
Soft copy
Designated
POC
Technical Interchange
Meeting facilitation, minutes, and action item reports draft 3 days ARO, final
14 days after FAA comment
Hard copy
Soft copy
Designated
POC
Risk Issue Opportunity (RIO) process and tracking, ARM tool use, and associated
Vulnerability assessments draft 30 days ARO, final 30 days after FAA comment
Hard copy
Soft copy
Designated
POC
Contract Data Requirement
List (CDRL) documentation review in the area of system development forecast reports draft 30 days, final 14 days after FAA comment
Hard copy
Soft copy
Designated
POC
Review and analysis of technical studies draft 30 days ARO, final 14 days after FAA comment
Hard copy
Soft copy
Designated
POC
Deployment activities, Site
Surveys, and associated documentation
As required Hard copy
Soft copy
Designated
POC
In Service Review documentation As required Hard copy
Soft copy
Designated
POC
H. Skill Mix
Labor Category
(Estimated)
Est. Level of Effort
(Hours)
Base Period
Est. Level of
Effort
(Hours)
Base Period
Est. Level of Effort
(Hours)
Base Period
ATC Specialist II 3,840 3,840 3,840
Engineer II 6,000 6,000 6,000
Engineer III 2,312 2,312 2,312
Engineer IV 1,920 1,920 1,920
Engineer V 16,320 16,320 16,320
Financial Analyst III 13,440 13,440 13,440
Hardware Design/Test
Engineer II
1,920 1,920 1,920
Human Factors Engineer III 480 480 480
Program Analyst I 5,760 5,760 5,760
Program Analyst II 25,974 25,974 25,974
Program Analyst III 22,297 22,297 22,297
Project Manager II 4,080 4,080 4,080
Software Engineer III 1,920 1,920 1,920
Strategic Planner 30,712 30,712 30,712
Systems Engineer II 9,600 9,600 9,600
Tech Ops Support Spec II
960 960 960
TOTAL EST. HOURS
147,535 147,535 147,535
Due to space constraints within FAA facilitites, 30% of the estimated level of effort is anticipated to be performed at FAA facilities.
I. APPLICABLE ORDERS/SPECIFICATIONS
None
J. GOVERNMENT-FURNISHED INFORMATION (GFI)/GOVERNMENT-
FURNISHED PROPERTY (GFP)
None
K. ADDITIONAL TASK DIRECTION AND DELIVERABLES
Additional task direction and deliverables within the scope of this task order may be required and will be ordered pursuant to G.1.2 Placement of Work Orders Against the Contract.
L. CORE CAPABILITIES
The Contractor will be required to draw upon the following operational and technical knowledge to successfully perform the task (see section C.2.7 of the PSS SOW for a full description):
• Air Traffic Management (ATM) Automation
• Air Traffic Rules and Procedures
• Airspace Design and Analysis
• Communications
• Cost Benefit Analysis
• Human Factors
• NAS Air Traffic Facilities
M. AUTHORIZED SIGNATURES
Contractor Authorized Representative Date
FAA Contracting Officer Date
By execution of this task order the contractor certifies that performance of this task does not initiate a conflict of interest and/or that potential conflicts of interest have been identified and mitigated as approved by the FAA Contracting Officer. Furthermore, the prime and all subcontractors shall operate and abide by the Organizational Conflict of Interest (OCI) processes and procedures as outlined in Attachment J-012 OCI Mitigation Plan.