This solicitation seeks proposals for a federal highway project. Work includes full depth reclamation and asphalt concrete pavement of over 16 miles of roads across three sites in Great Smoky Mountains National Park, as well as drainage structure repairs, guardrail replacement, signage updates, and other miscellaneous tasks. Proposals from certified Small Business Concerns are due by March 28, 2023. The total project cost is estimated between $25-35 million. Offerors must demonstrate experience on similarly complex highway projects. The solicitation will provide further qualification requirements.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7323R000019 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: CONSTRUCTION
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: ACQUISITIONS
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1402/22/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/22/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project TN NP GRSM 10N(3), 19(1), 107(1)
The purpose of this Amendment is to:
1) Revise Proposal Schedule to include Page B-1.
2) The Proposals due date of March 28, 2023, at 2:00 p.m. EST will remain unchanged.
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0001
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001 Project TN NP GRSM 10N(3), 19(1), 107(1)
GREAT SMOKY MOUNTAINS NATIONAL PARK
Solicitation: 693C73-23-R-000019
The purpose of this Amendment is to:
1) Revise Proposal Schedule to include Page B-1.
2) The Proposals due date of March 28, 2023, at 2:00 p.m. EST will remain unchanged.
B - 1
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0100 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0150 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0200 15214-3000 SURVEY AND STAKING, PARKING AREA (AND DESIGN)
ALL LPSM $___LPSM_____ $____________
A0250 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0300 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
10,500 LNFT $____________ $____________
A0350 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
58 EACH $____________ $____________
A0400 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
A0450 20301-1100 REMOVAL OF GATE
2 EACH $____________ $____________
A0500 20301-2000 REMOVAL OF PIPE END SECTION
1 EACH $____________ $____________
A0550 20301-2400 REMOVAL OF SIGN
10 EACH $____________ $____________
A0600 20301-3400 REMOVAL OF WHEELSTOP
5 EACH $____________ $____________
A0650 20302-0400 REMOVAL OF CURB, ASPHALT
1,000 LNFT $____________ $____________
A0700 20302-1400 REMOVAL OF GUARDRAIL, TIMBER
22,940 LNFT $____________ $____________
A0750 20302-2100 REMOVAL OF PIPE CULVERT
12 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:TN NP GRSM 10N(3),19(1),107(1)
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 2
A0800 20303-3000 REMOVAL OF SIDEWALK, ASPHALT
400 SQYD $____________ $____________
A0850 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (REMOVE OLD
FORMWORK)
ALL LPSM $___LPSM_____ $____________
A0900 20315-0000 SAWCUTTING PAVEMENT
120 LNFT $____________ $____________
A0950 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
90 SQYD $____________ $____________
A1000 25102-0200 PLACED RIPRAP, METHOD A, CLASS 2
132 TON $____________ $____________
A1050 25102-0300 PLACED RIPRAP, METHOD A, CLASS 3
32 TON $____________ $____________
A1100 30101-4000 AGGREGATE BASE GRADING C OR D
30 TON $____________ $____________
A1150 30302-1000 DITCH RECONDITIONING
3,000 LNFT $____________ $____________
A1200 30302-2000 SHOULDER RECONDITIONING
61,500 LNFT $____________ $____________
A1250 30502-0800 FULL DEPTH RECLAMATION WITH CEMENT, 8-INCH DEPTH
77,300 SQYD $____________ $____________
A1300 31301-0000 AGGREGATE-TOPSOIL COURSE
1,800 TON $____________ $____________
A1350 40101-0200 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL (PG 64-22, TYPE III-B
OR TYPE IV ROUGHNESS)
6,800 TON $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 3
A1450 40101-1000 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL (PG 64-22)
10,900 TON $____________ $____________
A1600 41102-0000 PRIME COAT
77,300 SQYD $____________ $____________
A1650 41202-0000 TACK COAT
8,300 GAL $____________ $____________
A1700 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH (BRIDGE MICRO MILLING)
1,220 SQYD $____________ $____________
A1750 55220-0000 REPAIR CONCRETE (TOP OF DECK)
330 SQYD $____________ $____________
A1800 55225-0000 CLEAN AND RESEAL JOINTS (CURB, POURABLE)
60 LNFT $____________ $____________
A1850 55501-0000 STRUCTURAL STEEL (REPLACE MISSING BOLTS)
ALL LPSM $___LPSM_____ $____________
A1900 56301-2000 PAINTING, STEEL STRUCTURE (CLEAN AND PAINT BEARINGS)
ALL LPSM $___LPSM_____ $____________
A1950 56602-0000 SHOTCRETE (SCOUR REPAIR)
15 CUYD $____________ $____________
A2000 56901-0000 CONCRETE OVERLAY (POLYESTER POLYMER CONCRETE, 2-INCH DEPTH)
1,220 SQYD $____________ $____________
A2050 60201-0400 12-INCH PIPE CULVERT
14 LNFT $____________ $____________
A2100 60201-0800 24-INCH PIPE CULVERT
110 LNFT $____________ $____________
A2150 60403-0900 INLET, FLH TYPE 4B
1 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 4
A2200 60403-1900 INLET, FLH TYPE 6B
1 EACH $____________ $____________
A2250 60406-0000 INLET ADJUSTMENT
2 EACH $____________ $____________
A2300 60704-0000 CLEANING CULVERT IN PLACE
50 EACH $____________ $____________
A2350 60705-0000 REPAIRING DRAINAGE STRUCTURE
5 EACH $____________ $____________
A2400 60706-0000 CLEANING DRAINAGE STRUCTURE
88 EACH $____________ $____________
A2450 60802-0500 PAVED WATERWAY, TYPE 5
110 LNFT $____________ $____________
A2500 60815-0500 RECONDITION PAVED WATERWAY, TYPE 5
2,600 SQYD $____________ $____________
A2550 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
1,000 LNFT $____________ $____________
A2600 60901-4000 CURB, STONE, TYPE 1, 16-INCH DEPTH
50 LNFT $____________ $____________
A2650 60910-0000 RESET CURB (REMOVE AND RESET)
2,200 LNFT $____________ $____________
A2700 61501-0300 SIDEWALK, FIBER REINFORCED COLORED CONCRETE
400 SQYD $____________ $____________
A2750 61504-1000 ACCESSIBILITY RAMP, CONCRETE
30 SQYD $____________ $____________
A2800 61701-4000 GUARDRAIL SYSTEM SBTB
20,060 LNFT $____________ $____________
A2850 61702-0100 TERMINAL SECTION, TYPE SBT-BAT
77 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 5
A2900 61702-0510 TERMINAL SECTION, TYPE SBT-FAT
58 EACH $____________ $____________
A2950 61707-2000 STRUCTURE TRANSITION RAILING, SBT SYSTEM
60 LNFT $____________ $____________
A3000 61901-0000 FENCE (TEMPORARY FENCE)
500 LNFT $____________ $____________
A3050 61902-0900 GATE, METAL
2 EACH $____________ $____________
A3100 61904-0000 BOLLARD POST (CLEAN AND PAINT EXISTING BOLLARDS)
7 EACH $____________ $____________
A3150 62011-0100 STONE MASONRY HEADWALL FOR 12-INCH PIPE CULVERT
1 EACH $____________ $____________
A3200 62011-0200 STONE MASONRY HEADWALL FOR 15-INCH PIPE CULVERT
2 EACH $____________ $____________
A3250 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
1 EACH $____________ $____________
A3300 62030-0000 REPOINT STONE MASONRY
350 LNFT $____________ $____________
A3350 62501-0000 TURF ESTABLISHMENT
4.5 ACRE $____________ $____________
A3400 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
73 SQFT $____________ $____________
A3450 63308-2000 OBJECT MARKER, TYPE 2
4 EACH $____________ $____________
A3500 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
1,400 LNFT $____________ $____________
A3550 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL
4 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 6
A3600 63411-1500 RECESSED PAVEMENT MARKINGS, TYPE H, SOLID
125,000 LNFT $____________ $____________
A3650 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
100 EACH $____________ $____________
A3700 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
13 EACH $____________ $____________
A3750 63502-1900 TEMPORARY TRAFFIC CONTROL, SHADOW VEHICLE
1 EACH $____________ $____________
A3800 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
1 EACH $____________ $____________
A3850 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
48 LNFT $____________ $____________
A3900 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
189,000 LNFT $____________ $____________
A3950 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
240 SQFT $____________ $____________
A4000 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER (NORTH CAROLINA)
1,000 HOUR $____________ $____________
A4050 63507-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
55 DAY $____________ $____________
A4100 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP
1 EACH $____________ $____________
A4150 63610-1000 CONDUIT, 1 1/2-INCH, PVC
30 LNFT $____________ $____________
A4200 63621-1000 UTILITY BOX, PULLBOX
1 EACH $____________ $____________
A4250 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 7
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 8
B0100 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
B0150 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
B0200 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
B0250 15702-4000 SOIL EROSION CONTROL, FILTER BAG
ALL LPSM $___LPSM_____ $____________
B0300 15702-5000 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
ALL LPSM $___LPSM_____ $____________
B0350 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
4,100 LNFT $____________ $____________
B0400 15706-0200 SOIL EROSION CONTROL, CHECK DAM
6 EACH $____________ $____________
B0450 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
12 EACH $____________ $____________
B0500 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
B0550 20301-1100 REMOVAL OF GATE
3 EACH $____________ $____________
B0600 20301-1200 REMOVAL OF HEADWALL
2 EACH $____________ $____________
B0650 20301-1400 REMOVAL OF INLET
1 EACH $____________ $____________
B0700 20301-2400 REMOVAL OF SIGN
104 EACH $____________ $____________
B0750 20301-3400 REMOVAL OF WHEELSTOP
98 EACH $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 9
B0800 20301-3410 REMOVAL OF SPEED BUMP (PLASTIC)
3 EACH $____________ $____________
B0850 20302-0400 REMOVAL OF CURB, ASPHALT
70 LNFT $____________ $____________
B0900 20302-0600 REMOVAL OF CURB, STONE
50 LNFT $____________ $____________
B0950 20302-1400 REMOVAL OF GUARDRAIL, TIMBER
1,350 LNFT $____________ $____________
B1000 20302-2100 REMOVAL OF PIPE CULVERT
175 LNFT $____________ $____________
B1050 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
5,250 SQYD $____________ $____________
B1100 20303-3000 REMOVAL OF SIDEWALK, ASPHALT
350 SQYD $____________ $____________
B1150 20304-9000 REMOVAL OF STREAM DEBRIS (TWO MILE BRANCH CULVERT)
ALL LPSM $___LPSM_____ $____________
B1200 20315-0000 SAWCUTTING PAVEMENT
7,900 LNFT $____________ $____________
B1250 20401-0000 ROADWAY EXCAVATION
3,720 CUYD $____________ $____________
B1300 20410-0000 SELECT BORROW
1,350 CUYD $____________ $____________
B1350 20425-1000 DITCH, EXCAVATION
720 LNFT $____________ $____________
B1400 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
9,760 SQYD $____________ $____________
B1450 20801-0000 STRUCTURE EXCAVATION
10 CUYD $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 10
B1500 25102-0300 PLACED RIPRAP, METHOD A, CLASS 3
7 TON $____________ $____________
B1550 25111-0200 GROUTED RIPRAP, METHOD A, CLASS 2
50 TON $____________ $____________
B1600 30101-4000 AGGREGATE BASE GRADING C OR D
3,150 TON $____________ $____________
B1700 30110-0000 AGGREGATE SURFACE COURSE
150 TON $____________ $____________
B1750 30302-1000 DITCH RECONDITIONING
5,400 LNFT $____________ $____________
B1800 30302-2000 SHOULDER RECONDITIONING
25,000 LNFT $____________ $____________
B1850 30303-2000 AGGREGATE SURFACE RECONDITIONING
4,900 SQYD $____________ $____________
B1900 31301-0000 AGGREGATE-TOPSOIL COURSE
990 TON $____________ $____________
B1950 40201-0100 ASPHALT CONCRETE PAVEMENT, MARSHALL MIX, CLASS A (1/2-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, PG 64-22, TYPE II-B, TYPE III-B, OR
TYPE IV ROUGHNESS)
10,900 TON $____________ $____________
B2050 40201-0100 ASPHALT CONCRETE PAVEMENT, MARSHALL MIX, CLASS A (1-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, PG 64-22)
3,500 TON $____________ $____________
B2200 41202-0000 TACK COAT
12,900 GAL $____________ $____________
B2250 41301-0000 ASPHALT PAVEMENT MILLING (VARIABLE DEPTH)
450 SQYD $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 11
B2300 41301-0200 ASPHALT PAVEMENT MILLING, 1-INCH DEPTH (BRIDGE MICRO MILLING)
720 SQYD $____________ $____________
B2350 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
38,000 SQYD $____________ $____________
B2400 41301-0800 ASPHALT PAVEMENT MILLING, 3-INCH DEPTH (BRIDGE MICRO MILLING)
160 SQYD $____________ $____________
B2450 41501-0000 PAVING GEOTEXTILE
150 SQYD $____________ $____________
B2500 55220-0000 REPAIR CONCRETE (TOP OF DECK)
220 SQYD $____________ $____________
B2550 55225-0000 CLEAN AND RESEAL JOINTS (CURB, POURABLE)
15 LNFT $____________ $____________
B2600 55235-0000 EXPANSION JOINTS (ASPHALTIC PLUG)
60 LNFT $____________ $____________
B2650 55235-0000 EXPANSION JOINTS (VERTICAL, PRE-COMPRESSED HYBRID SEAL)
120 LNFT $____________ $____________
B2700 56101-0000 STRUCTURAL CONCRETE INJECTION AND CRACK REPAIR
20 LNFT $____________ $____________
B2750 56901-0000 CONCRETE OVERLAY (COLORED POLYESTER POLYMER CONCRETE, 3-INCH
DEPTH)
160 SQYD $____________ $____________
B2800 56901-0000 CONCRETE OVERLAY (POLYESTER POLYMER CONCRETE, 1-INCH DEPTH)
720 SQYD $____________ $____________
B2850 60201-0400 12-INCH PIPE CULVERT
10 LNFT $____________ $____________
B2900 60201-0600 18-INCH PIPE CULVERT
64 LNFT $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 12
B2950 60201-0800 24-INCH PIPE CULVERT
48 LNFT $____________ $____________
B3000 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
1 EACH $____________ $____________
B3050 60403-0900 INLET, FLH TYPE 4B
1 EACH $____________ $____________
B3100 60406-0000 INLET ADJUSTMENT
1 EACH $____________ $____________
B3150 60412-1000 REMOVE AND RESET METAL FRAME AND GRATE
1 EACH $____________ $____________
B3200 60503-0000 GEOCOMPOSITE PAVEMENT EDGE DRAIN SYSTEM
1,200 LNFT $____________ $____________
B3250 60704-0000 CLEANING CULVERT IN PLACE
17 EACH $____________ $____________
B3300 60706-0000 CLEANING DRAINAGE STRUCTURE
30 EACH $____________ $____________
B3350 60707-0600 LINING 30-INCH PIPE CULVERT
140 LNFT $____________ $____________
B3400 60802-0500 PAVED WATERWAY, TYPE 5
525 LNFT $____________ $____________
B3450 60901-4000 CURB, STONE, TYPE 1, 16-INCH DEPTH
1,500 LNFT $____________ $____________
B3500 60910-0000 RESET CURB (REMOVE AND RESET)
6,100 LNFT $____________ $____________
B3550 60915-1000 WHEELSTOP, CONCRETE
67 EACH $____________ $____________
B3600 61401-0000 LEAN CONCRETE BACKFILL
4 CUYD $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 13
B3650 61501-0300 SIDEWALK, FIBER REINFORCED COLORED CONCRETE
400 SQYD $____________ $____________
B3700 61501-1100 SIDEWALK, ASPHALT
15 SQYD $____________ $____________
B3750 61504-1000 ACCESSIBILITY RAMP, CONCRETE
50 SQYD $____________ $____________
B3800 61701-4000 GUARDRAIL SYSTEM SBTB
1,100 LNFT $____________ $____________
B3850 61702-0510 TERMINAL SECTION, TYPE SBT-FAT
7 EACH $____________ $____________
B3900 61707-2000 STRUCTURE TRANSITION RAILING, SBT SYSTEM
30 LNFT $____________ $____________
B3950 61901-0000 FENCE (TEMPORARY FENCE)
700 LNFT $____________ $____________
B4000 61902-0900 GATE, METAL
3 EACH $____________ $____________
B4050 61904-0000 BOLLARD POST (CAMERA POST)
1 EACH $____________ $____________
B4100 61921-1000 REMOVE AND RESET FENCE
150 LNFT $____________ $____________
B4150 62001-0000 STONE MASONRY (CAPSTONE)
1 CUYD $____________ $____________
B4200 62002-0000 STONE MASONRY (DRAINAGE CURB BREAK)
20 SQYD $____________ $____________
B4250 62011-0100 STONE MASONRY HEADWALL FOR 12-INCH PIPE CULVERT
2 EACH $____________ $____________
B4300 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT
2 EACH $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 14
B4350 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
1 EACH $____________ $____________
B4400 62013-1000 STONE MASONRY APRON
65 SQYD $____________ $____________
B4450 62025-1000 REMOVE AND RESET STONE MASONRY
1.5 CUYD $____________ $____________
B4500 62030-0000 REPOINT STONE MASONRY
1,800 LNFT $____________ $____________
B4550 62101-0000 MONUMENT (CONCRETE MILE MARKER)
1 EACH $____________ $____________
B4600 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
1,200 SQYD $____________ $____________
B4650 62501-0000 TURF ESTABLISHMENT
2.4 ACRE $____________ $____________
B4700 63301-0000 SIGN SYSTEM (REFURBISH INTERCHANGEABLE SIGN SYSTEM)
1 EACH $____________ $____________
B4750 63301-0000 SIGN SYSTEM (TURNABLE TRAFFIC SIGN POST)
1 EACH $____________ $____________
B4800 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
929 SQFT $____________ $____________
B4850 63309-0900 DELINEATOR, TYPE FLEXIBLE
5 EACH $____________ $____________
B4900 63328-0000 SPEED BUMP (PLASTIC)
3 EACH $____________ $____________
B4950 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
2,600 LNFT $____________ $____________
B5000 63405-2900 PAVEMENT MARKINGS, TYPE H, TURN ARROW
7 EACH $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 15
B5050 63405-2950 PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW
6 EACH $____________ $____________
B5100 63405-3000 PAVEMENT MARKINGS, TYPE H, STRAIGHT/TURN ARROW COMBINATION
2 EACH $____________ $____________
B5150 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL
6 EACH $____________ $____________
B5200 63411-1500 RECESSED PAVEMENT MARKINGS, TYPE H, SOLID
61,400 LNFT $____________ $____________
B5250 63411-1600 RECESSED PAVEMENT MARKINGS, TYPE H, BROKEN
900 LNFT $____________ $____________
B5300 63502-0900 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28-INCH
100 EACH $____________ $____________
B5350 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
300 EACH $____________ $____________
B5400 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
30 EACH $____________ $____________
B5450 63502-1900 TEMPORARY TRAFFIC CONTROL, SHADOW VEHICLE
1 EACH $____________ $____________
B5500 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
4 EACH $____________ $____________
B5550 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
1 EACH $____________ $____________
B5600 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
320 LNFT $____________ $____________
B5650 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
160,000 LNFT $____________ $____________
B5700 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
900 SQFT $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 16
B5750 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER (TENNESSEE)
2,500 HOUR $____________ $____________
B5800 63507-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
60 DAY $____________ $____________
B5850 63601-6000 SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM
ALL LPSM $___LPSM_____ $____________
B5900 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP
2 EACH $____________ $____________
B5950 63621-1000 UTILITY BOX, PULLBOX
2 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:B Schedule Type:Options
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 17
C0100 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
C0150 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
C0200 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
C0250 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
3,800 LNFT $____________ $____________
C0300 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
35 EACH $____________ $____________
C0350 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
C0400 20301-1100 REMOVAL OF GATE
3 EACH $____________ $____________
C0450 20301-2400 REMOVAL OF SIGN
29 EACH $____________ $____________
C0500 20301-3400 REMOVAL OF WHEELSTOP
47 EACH $____________ $____________
C0550 20301-3900 REMOVAL OF PAVEMENT MARKINGS, SYMBOLS AND WORDS
2 EACH $____________ $____________
C0600 20302-2600 REMOVAL OF PAVEMENT MARKINGS
57,500 LNFT $____________ $____________
C0650 20315-0000 SAWCUTTING PAVEMENT
30 LNFT $____________ $____________
C0700 30302-1000 DITCH RECONDITIONING
3,600 LNFT $____________ $____________
C0750 30302-2000 SHOULDER RECONDITIONING
13,000 LNFT $____________ $____________
Bid Schedule Schedule:C Schedule Type:Options
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 18
C0800 31301-0000 AGGREGATE-TOPSOIL COURSE
400 TON $____________ $____________
C0850 41202-0000 TACK COAT (NON-TRACKING POLYMER ASPHALT)
12,400 GAL $____________ $____________
C0900 41301-0000 ASPHALT PAVEMENT MILLING (VARIABLE DEPTH)
200 SQYD $____________ $____________
C0950 41402-2000 CRACKS, CLEANING AND SEALING
7.8 MILE $____________ $____________
C1000 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
400 SQYD $____________ $____________
C1050 41801-3000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3 (BLUE RIDGE PARKWAY
AND HEINTOOGA SPUR ROAD)
1,000 SQYD $____________ $____________
C1100 43101-0000 THIN LIFT ASPHALT CONCRETE PAVEMENT (GYRATORY MIX, NO.4 SIEVE
NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL, TYPE IV
ROUGHNESS, PG 64-22)
3,800 TON $____________ $____________
C1150 60704-0000 CLEANING CULVERT IN PLACE
20 EACH $____________ $____________
C1200 60705-0000 REPAIRING DRAINAGE STRUCTURE
10 EACH $____________ $____________
C1250 60706-0000 CLEANING DRAINAGE STRUCTURE
57 EACH $____________ $____________
C1300 60815-0500 RECONDITION PAVED WATERWAY, TYPE 5
500 SQYD $____________ $____________
C1350 60915-1000 WHEELSTOP, CONCRETE
47 EACH $____________ $____________
Bid Schedule Schedule:C Schedule Type:Options
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 19
C1400 61901-0000 FENCE (TEMPORARY FENCE)
500 LNFT $____________ $____________
C1450 61902-0900 GATE, METAL
3 EACH $____________ $____________
C1500 62028-1000 REMOVE AND RESET STONE MASONRY HEADWALL
1 EACH $____________ $____________
C1550 62030-0000 REPOINT STONE MASONRY
475 LNFT $____________ $____________
C1600 62501-0000 TURF ESTABLISHMENT
1.2 ACRE $____________ $____________
C1650 63301-0000 SIGN SYSTEM (TURNABLE TRAFFIC SIGN POST)
2 EACH $____________ $____________
C1700 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
194 SQFT $____________ $____________
C1750 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
57,400 LNFT $____________ $____________
C1800 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID (TRANSVERSE RUMBLE STRIP
MARKINGS)
100 LNFT $____________ $____________
C1850 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL
2 EACH $____________ $____________
C1900 63502-0900 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28-INCH
100 EACH $____________ $____________
C1950 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
10 EACH $____________ $____________
C2000 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
12 EACH $____________ $____________
Bid Schedule Schedule:C Schedule Type:Options
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 20
C2050 63502-1900 TEMPORARY TRAFFIC CONTROL, SHADOW VEHICLE
1 EACH $____________ $____________
C2100 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
1 EACH $____________ $____________
C2150 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
32 LNFT $____________ $____________
C2200 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
112,000 LNFT $____________ $____________
C2250 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
210 SQFT $____________ $____________
C2300 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER (NORTH CAROLINA)
1,000 HOUR $____________ $____________
C2350 63507-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
35 DAY $____________ $____________
C2400 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:C Schedule Type:Options
Project Name:Rehabilitation of Newfound Gap Road from MP 0.0 to MP 1.8, Rehabilitation of Lakeview Drive East, and Pavement Preservation of Heintooga Ridge Road
B - 21
PRICE PROPOSAL SUMMARY
Project TN NP GRSM 10N(3), 19(1), 107(1)
(1) Schedule A (Base Contract) Bid Total (from Page B-1) = (1) $____________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-8) = (2) $____________________
(3) Schedule C (Government Option 2) Bid Total (from Page B-17) = (3) $____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) + (3) $____________________
Maximum Time Allowed for the Contract if Schedules A, B, and C are Awarded at the Same Time:
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 487 calendar days.
If Schedules A, B, and C are NOT Awarded at the Same Time:
If the Government awards the contract as Schedules A + B, the performance period to complete all Schedules A and B work will be 386 calendar days.
If the Government awards the contract as Schedules A + C, the performance period to complete all Schedules A and C work will be 313 calendar days.
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 214 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 165 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 96 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
| Amendment 0001.pdf |
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Project TN NP GRSM 10N(3), 19(1), 107(1) |
| Solicitation: 693C73-23-R-000019 |
| B Pages_Amendment 0001.pdf |
| Hard Copy (Paper) Submissions: |
| Electronic Copy (Email) Submissions: |
| STEP 2 – PRICE PROPOSAL EVALUATION |
| To be eligible for award, Offerors must submit prices for each pay item. |
| Amendment 0001.pdf |
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Project TN NP GRSM 10N(3), 19(1), 107(1) |
| Solicitation: 693C73-23-R-000019 |
File details come from the government source that posted it. Updated .