This document summarizes a federal solicitation for bridge preventative maintenance work on the Natchez Trace Parkway. The solicitation seeks sealed bids from certified Small Business Concerns for sixteen bridge maintenance repair projects located in Hinds and Madison Counties, Mississippi. The work includes repair of deteriorated expansion joints, asphalt pavement crack cleaning and sealing, concrete repairs, and other miscellaneous tasks. The project will be split into multiple work schedules with a total expected cost between $500,000 to $1,000,000. Bid documents were to be issued on or about October 22, 2019, with bid due date and location specified in the solicitation. The solicitation was issued by the Department of Transportation Federal Highway Administration for the Natchez Trace Parkway. Annual Representations and Certifications must be completed online at SAM.gov and Vets-4212 at dol.gov.
Bridge Inspection Report
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NATR BMS FY19(1).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| 5570-503P4583.pdf | ||
| 5570-135P2750.pdf | ||
| 5570-471P13750.pdf | ||
| 5570-499P1528.pdf | ||
| Plans_-_NP-NATR_BMS_FY19(1).pdf | ||
| 5570-500P28.pdf | ||
| FP14_Eng.pdf | ||
| IFB_Solicitation_-_NATR_BMS_FY19(1).pdf | ||
| 5570-479P1528.pdf | ||
| 5570-475P2750.pdf | ||
| 5570-498P1719.pdf | ||
| 5570-484P3438.pdf | ||
| 5570-501P13750.pdf | ||
| 5570-474P3438.pdf | ||
| 5570-502P6875.pdf | ||
| 5570-473P4583.pdf | ||
| 5570-482P6875.pdf | ||
| VETS-4212_-_Form.pdf | ||
| NEPA_CE.pdf | ||
| 5570-472P6875.pdf | ||
| Synopsis_-_NATR_BMS_FY19(1).doc | DOC document |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5570-477P
WHITE OAK CREEK BRIDGE #2 INSPECTION DATE: 1/17/17
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... SLAB NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 124.0 FT (37.8 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 70.0 FT (21.3 M)
WEARING SURFACE: .......... NONE DECK WIDTH: ...................... 37.5 FT (11.4 M)
ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 34.5 FT (10.5 M)
PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 3O10 / SKEW ANGLE: ..................... 34 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 2006-NEW OVERLAY.
LOCATION
NATCHEZ TRACE PARKWAY MILE POINT: ..................... 99.13 (KM PT 159.53)
STATE: ................................. MISSISSIPPI LOCATION: 3O PROJECT SECTION
FACILITY CARRIED: ............ NATCHEZ TRACE PARKWAY
FEATURE INTERSECTED: .. WHITE OAK CREEK
STRUCTURE EVALUATION SUMMARY
This continuous concrete slab bridge is in good condition overall. Problems include deterioration of the previously saw cut pavement and sealant at the end of the approach slabs; cracking and raveling of the asphalt along the joint between the abutment spans and the approach slabs; and moderate settlement of the approach shoulders. In addition, there is an area of broken up and missing asphalt along the south abutment joint that has exposed the joint anchorage; minor erosion and undermining of the drain inlet at the east side of the south approach; and accumulation of debris along the curblines, around the drains, and in the joints.
It should also be noted that moderate to severe erosion is present under the end spans and along the piers due to drainage from the bridge deck. This has resulted in gullies measuring up to 5' wide x 5' deep. This condition will continue to be monitored during future inspection cycles.
An object marker has been installed at the drainage pipe outflow on the southeast embankment since the last inspection.
Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: L.E. SHEPTUCK, J.T. ALLEN (CLARK NEXSEN)
CONDITION ASSESSMENT:
LUKE E SHEPTUCK, FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 5/31/17
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-477P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
222.2 CLEAN AND RESEAL RELIEF JOINTS AT APPROACHES.
222.4 CLEAN AND SEAL CRACKING OF APPROACH PAVEMENT.
222.6 INSTALL ASPHALT TRANSITIONS AT APPROACH SHOULDERS TO CORRECT
SETTLEMENT.
58.3 REPAIR BROKEN UP AND MISSING SECTION OF ASPHALT WEARING SURFACE
ALONG SOUTH ABUTMENT JOINT IN NORTHBOUND LANE.
222.6 REPAIR EROSION AND UNDERMINING AROUND DRAIN INLET AT EAST SIDE OF
SOUTH APPROACH.
58.2,7 CLEAR DEBRIS ALONG CURBLINES, AROUND DRAINS, AND IN JOINTS.
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5570-477P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE
9 EXCELLENT CONDITION
8 VERY GOOD CONDITION - no problems noted.
7 GOOD CONDITION - some minor problems.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration.
5 FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 7
DECK SLAB 1. G
EXPANSION JOINTS 2. G 58, 59, 60
WEARING SURFACE 3. G
RIDEABILITY 4. G
CURBS, SIDEWALKS, AND MEDIAN 5. G
PARAPETS AND/OR RAILINGS 6. G 58.1, 59.3
DRAINS AND DRAINAGE 7. G
UTILITIES 8. N
DEFLECTION AND/OR VIBRATION 9. G
OTHER 10. N
59. SUPERSTRUCTURE 7 58.2,3
BEARING DEVICES 1. G
GIRDERS OR BEAMS 2. N
ARCH(ES) OR SLAB(S)3. G
FLOOR BEAMS AND STRINGERS 4. N
TRUSSES 5. N
DIAPHRAGMS AND BRACING
7.
6.
PAINT
N N
58.3
FASCIA(E)8. N
DEFLECTION AND/OR VIBRATION 9. G
OTHER
ALIGNMENT 10.
11. N G
58.5,6
60. SUBSTRUCTURE 7
ABUTMENTS
PILE BENTS
BREASTWALLS OR COLUMNS
2.
1. G
N 58.7
CAPS AND/OR BEARING SEATS 3. G
BACKWALLS AND/OR BULKHEADS 4. N
WINGWALLS
FOUNDATIONS
6.
5. N
G 60.1
WEEP HOLES 7. N
EXPANSION JOINTS 8. N
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
10.
9. G
G 60.3,6
SLOPE PROTECTION 11. G
OTHER 12. N
PIER(S)
WALLS AND/OR COLUMNS 13. G 60.6
PILE BENTS 14. N
CAPS AND/OR BEARING SEATS 15. G
FOUNDATIONS 16. N
EROSION AND/OR SCOUR 17. F 60.17
SETTLEMENT OR DEFLECTION 18. G
OTHER 19. N
ITEM REFERENCE AND REMARKS
MINOR VINE GROWTH ON STRUCTURE EXTENDING ONTO SLAB
UNDERSIDE.
MINOR SHRINKAGE CRACKING THROUGHOUT SLAB UNDERSIDE.
MINOR CRACKING OF SLAB UNDERSIDE, SOME WITH
EFFLORESCENCE. MINOR CRACKING WITH EFFLORESCENCE ON
SLAB SIDES OVER PIERS.
MINOR ACCUMULATION OF DEBRIS IN EXPANSION JOINTS ALONG
ROADWAY; HEAVY ALONG SHOULDERS.
WEARING SURFACE BROKEN UP AND MISSING (42"L X 6"W X 2"D)
WITH JOINT ANCHORAGE EXPOSED ALONG SOUTH ABUTMENT
JOINT IN NORTHBOUND LANE ADJACENT TO SHOULDER.
MINOR LONGITUDINAL AND TRANSVERSE CRACKING OF WEARING
SURFACE.
MINOR POPOUTS AND CRACKING OF CURBS AND RAILINGS AT
RANDOM LOCATIONS.
MINOR ACCUMULATION OF DEBRIS AND VEGETATION GROWTH
ALONG CURBLINES AND AROUND DRAINS.
MINOR VERTICAL CRACKING OF SOUTH ABUTMENT BREASTWALL.
MINOR CRACKING WITH EFFLORESCENCE ON WINGWALLS AT
BEARING SEAT AREAS.
MINOR MOWER DAMAGE THROUGHOUT WINGWALLS.
MODERATE TO SEVERE EROSION UNDER NORTH AND SOUTH
SPANS AND ALONG PIERS WITH DRAINAGE GULLIES UP TO 5 W X
5'D.
FIELD INSPECTION REPORT STRUCTURE NO. 5570-477P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 6
G F G G N
LOW
SUFF
10 FT.
222. APPROACHES 6
OTHER 9.
ALIGNMENT 8.
SIGNS 7.
SETTLEMENT 6.
EROSION 5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS 2.
1. APPROACH SLABS
(DRAIN)
N F N G G F G G G
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION 5.
EROSION AND/OR SCOUR 4.
FOUNDATION 3.
WEEP HOLES 2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 1
N N N
61.2,3 MODERATE EROSION OF CHANNEL BANKS, BANKS CUT TO
VERTICAL FACES WITH TREE ROOTS EXPOSED; SOME RIPRAP IN
PLACE ALONG DOWNSTREAM CHANNEL BANKS.
222.2,4 MINOR CRACKING OF APPROACH PAVEMENT. MINOR CRACKING
AND RAVELING OF ASPHALT ALONG JOINT BETWEEN ABUTMENT
SPANS AND APPROACH SLABS.
PAVEMENT SAW CUT AND SEALED AT APPROACH ENDS OF
APPROACH SLABS; MINOR TO MODERATE DETERIORATION OF
ASPHALT AND SEALANT.
222.5,9 CONCRETE DRAIN INLET AT EAST SIDE OF SOUTH APPROACH 1"
LOWER THAN SURROUNDING PAVEMENT. MINOR EROSION AND
UNDERMINING AROUND DRAIN INLET. MINOR MOWER DAMAGE TO
EDGES OF DRAIN INLET. ACCUMULATION OF DEBRIS PARTIALLY
BLOCKING DRAIN INLET.
222.6 MODERATE SETTLEMENT (UP TO 2") OF APPROACH SHOULDERS.
222.7 OBJECT MARKERS PRESENT AT ENDS OF RAILINGS. OBJECT
MARKER INSTALLED AT DRAINAGE PIPE OUTFLOW ON SOUTHEAST
EMBANKMENT SINCE LAST INSPECTION.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 5570-477P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 20 18 33 30
HS 36 33 60 55
TYPE 3 24 22 41 37
TYPE 3S2 32 29 53 48
TYPE 3-3 38 34 63 58
DESIGN LOADING: HS20 (MS18)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-477P
STRUCTURE IDENTIFICATION
(201) PARK: NATCHEZ TRACE PARKWAY (1) STATE: ....................................... 284 - MISSISSIPPI (MS)
(202) STRUCTURE NAME: .......... WHITE OAK CREEK BRIDGE #2 (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 089 - MADISON
(204) STRUCTURE NUMBER: ..... 5570-477P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 0 (6) FEATURES INTERSECTED:....... WHITE OAK CREEK
(207) ROAD SECTION NO: .......... 477P (7) FACILITY CARRIED: .................. NATCHEZ TRACE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5570477P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 3O PROJECT SECTION
(210) OPERATING UNIT: ............. RIDGELND (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 3O10 (11) MILE POINT: ............................. 99.13 (KM PT 159.53)
(212) DRAWING NUMBERS: ....... (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
2 - CONCRETE CONTINUOUS
01 - SLAB
70.0 FT (21.3 M)
124.0 FT (37.8 M)
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
6 - N/A
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 0 - NONE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)
(66) INVENTORY RATING: ...... 36.0 TONS (32.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 60.0 TONS (55.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 1/17 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-477P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 32°25'40.80" (51) CURB TO CURB WIDTH: ........... 34.5 FT (10.5 M)
(17) LONGITUDE: ......................... 90°10'54.60" (52) DECK WIDTH: ............................ 37.5 FT (11.4 M)
(19) DETOUR LENGTH: ............... 0 MI (0 KM) (32) APPR. ROADWAY WIDTH: ........ 34.0 FT (10.4 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 6.0 FT (1.8 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 6.0 FT (1.8 M)
(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 210 (34) SKEW ANGLE: ............................ 34 °
(30) YEAR OF ADT: ...................... 2012 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 231 (47) TOTAL HORIZ. CLEARANCE: .... 34.5 FT (10.5 M)
(115) YEAR OF FUTURE ADT: ..... 2032 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... N RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 0 - N/A
DESIGN TYPE: ........................ 0 - N/A
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.50 FT (0.76 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
5 - Stable; scour within limits of
1 - MAINTENANCE
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2006-NEW OVERLAY.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
http:90�10'54.60 http:32�25'40.80
APPENDIX STRUCTURE NO. 5570-477P
PHOTOGRAPHS STRUCTURE NO. 5570-477P
PHOTO #1 - LOOKING SOUTHBOUND TOWARD NATCHEZ
FLOW
PHOTO #2 - WEST (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW
LOOKING NORTH
PHOTO #4 - WEARING SURFACE BROKEN UP
AND MISSING WITH JOINT ANCHORAGE
EXPOSED ALONG SOUTH ABUTMENT JOINT IN
NORTHBOUND LANE
PHOTO #5 - TYPICAL CRACKING OF WEARING SURFACE; CENTER
SPAN NEAR NORTH PIER SHOWN
PHOTO #6 - TYPICAL ACCUMULATION OF DEBRIS ALONG CURBLINES;
EAST CURBLINE IN CENTER SPAN SHOWN
PHOTO #7 - TYPICAL DETERIORATION OF
ASPHALT AND SEALANT ALONG PAVEMENT
RELIEF JOINTS; SOUTH APPROACH SHOWN
PHOTO #8 - TYPICAL CRACKING AND
RAVELING OF ASPHALT ALONG JOINT
BETWEEN ABUTMENT SPANS AND APPROACH
SLABS; SOUTH APPROACH SHOWN
PHOTO #9 - CONDITION OF CONCRETE DRAIN INLET AT EAST SIDE OF
SOUTH APPROACH; ALSO NOTE EROSION AND UNDERMINING AROUND
DRAIN INLET AND ACCUMULATION OF DEBRIS
PHOTO #10 - TYPICAL SETTLEMENT OF APPROACH SHOULDERS; WEST
SHOULDER AT SOUTH APPROACH SHOWN
PHOTO #11 - GENERAL UNDERSIDE VIEW LOOKING SOUTH, CENTER
SPAN
PHOTO #12 - TYPICAL CRACKING OF SLAB UNDERSIDE WITH
EFFLORESCENCE; NORTH SPAN NEAR NORTH PIER SHOWN
PHOTO #13 - TYPICAL CRACKING WITH EFFLORESCENCE ON SLAB
SIDES OVER PIERS; WEST SIDE OVER NORTH PIER SHOWN
PHOTO #14 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #15 - TYPICAL CRACKING WITH EFFLORESCENCE ON
WINGWALLS AT BEARING SEAT AREAS; NORTHWEST WINGWALL
SHOWN
PHOTO #16 - GENERAL VIEW OF NORTH PIER, SOUTH SIDE
PHOTO #17 - TYPICAL EROSION UNDER NORTH AND SOUTH SPANS
AND ALONG PIERS WITH DRAINAGE GULLIES; WEST SIDE OF NORTH
PIER SHOWN
PHOTO #18 - TYPICAL EROSION UNDER NORTH AND SOUTH SPANS
AND ALONG PIERS WITH DRAINAGE GULLIES; WEST SIDE OF SOUTH
PIER SHOWN
PHOTO #19 - TYPICAL EROSION OF CHANNEL BANKS; NORTH
CHANNEL BANK BENEATH CENTER SPAN SHOWN
PHOTO #20 - LOOKING UPSTREAM THROUGH STRUCTURE, CENTER
SPAN
PHOTO #21 - LOOKING DOWNSTREAM THROUGH STRUCTURE,
CENTER SPAN
File details come from the government source that posted it. Updated .