This solicitation requests bids for a bridge preventive maintenance project on the Natchez Trace Parkway. The project consists of repairs to sixteen bridges, including deteriorated expansion joints, asphalt pavement cracks cleaning and sealing, concrete repairs, and other miscellaneous work. The work will be split into multiple contract schedules or options, with the total cost expected to range between $500,000 to $1,000,000. Sealed bids are due from certified Small Business Concerns by the date specified in the solicitation. The solicitation provides details on obtaining bid documents, registration for email notifications, annual representation and certification requirements, and payment procedures.

Bridge Inspection Report

View the file

Other files for this federal contract opportunity

Other files attached to Natchez Trace Parkway, newest first.
File Type Posted
Results of Bid Opening - NATR BMS FY19(1).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
5570-484P3438.pdf PDF
5570-501P13750.pdf PDF
5570-474P3438.pdf PDF
5570-502P6875.pdf PDF
5570-473P4583.pdf PDF
5570-477P1964.pdf PDF
5570-500P28.pdf PDF
FP14_Eng.pdf PDF
IFB_Solicitation_-_NATR_BMS_FY19(1).pdf PDF
5570-479P1528.pdf PDF
5570-475P2750.pdf PDF
5570-498P1719.pdf PDF
5570-482P6875.pdf PDF
VETS-4212_-_Form.pdf PDF
NEPA_CE.pdf PDF
5570-472P6875.pdf PDF
5570-503P4583.pdf PDF
5570-471P13750.pdf PDF
5570-499P1528.pdf PDF
Plans_-_NP-NATR_BMS_FY19(1).pdf PDF
Synopsis_-_NATR_BMS_FY19(1).doc DOC document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 5570-135P

U.S. ROUTE 51 BRIDGE INSPECTION DATE: 1/19/17

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... PRESTRESSED CONCRETE NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... NO. OF APPR. SPANS: ........ STRINGER/MULTI-BEAM or GIRDER 0

# OF BEAMS, MAIN SPAN: .. 4 STRUCT. TOTAL LENGTH: .. 212.0 FT (64.6 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 60.8 FT (18.5 M)

WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 32.5 FT (9.9 M)

ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 28.2 FT (8.6 M)

PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 3P2 / 3220A SKEW ANGLE: ..................... 28 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1982-Joint repair.2005-Underpass realignment work underway.2006-Girders repaired in Span #2 due to collision.2016-Erosion repaired at west end of south abutment slope and wingwall.

LOCATION

NATCHEZ TRACE PARKWAY MILE POINT: ..................... 102.07 (KM PT 164.26)

STATE: ................................. MISSISSIPPI LOCATION: 12.65 MILES SOUTH OF MS ROUTE 43.

FACILITY CARRIED: ............ NATCHEZ TRACE PARKWAY

FEATURE INTERSECTED: .. U.S. ROUTE 51

STRUCTURE EVALUATION SUMMARY

This prestressed concrete multi-girder bridge is in fair condition overall. It appears that one or both of the abutments may have rotated toward the center of the bridge at some time in the past, forcing all of the spans closer together.

This apparent movement is evidenced by closure of the expansion joints and spalling in the rails, curbs, and deck overhangs, as well as damage to the bearing devices and anchor bolts at the abutments. This condition will continue to be monitored during future inspections.

Another problem is leakage through the expansion joints. Cracks in the asphalt wearing surface over the joints allow water to flow down onto the superstructure, contributing to the corrosion of the bearing devices. Deck expansion joints should be installed and the roadway repaved to help prevent further deterioration.

Other problems include spalling with exposed rebar on the deck underside at spot locations; minor diagonal cracking at the beams from the end diaphragms corners; cracking and deterioration of the concrete particularly at the underside of the pier caps due to excessive moisture; cracking, settlement, and undermining of the north abutment slope protection; and minor collision damage to the girders and some columns.

It should be noted the previous erosion along the west end of the south abutment and along the wingwall with minor exposure of the abutment footing has been repaired since the last inspection.

Corrective measures should be taken as outlined in this report to help prevent the possible development of more

INSPECTION TEAM: A.D. MITCHEM, M.S. RAIFET (CLARK NEXSEN)

CONDITION ASSESSMENT:

A. DWAYNE MITCHEM, PE, FIELD TEAM LEADER

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 5/31/17

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

STRUCTURE SUMMARY STRUCTURE NO. 5570-135P

STRUCTURE EVALUATION SUMMARY CONTINUED

serious or costly problems in the future.

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-135P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D226 PRIORITY OF IMPROVEMENT

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

58.7 CLEAN DECK DRAINS AS NECESSARY.

60.11 REMOVE VEGETATION GROWTH FROM ON AND AROUND STRUCTURE.

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

58.2,3, 222.4

INSTALL DECK EXPANSION JOINT SEALS AND REPAVE ROADWAY

OVER STRUCTURE AND APPROACHES.

60.11 RECONSTRUCT SLOPE PROTECTION AT NORTH ABUTMENT.

59.1 CLEAN AND PAINT BEARING DEVICES.

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND

DESIGN CONSTRUCTION ENGINEERING (70% TOTAL REHAB COST)

PLUS PARK LOCATION FACTOR.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5570-135P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.

8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present

7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal

5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.

4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

58. DECK 6 ITEM REFERENCE AND REMARKS

F1. DECK SLAB

P2. EXPANSION JOINTS

F3. WEARING SURFACE

G4. RIDEABILITY

G5. CURBS, SIDEWALKS, AND MEDIAN

G6. PARAPETS AND/OR RAILINGS

F7. DRAINS AND DRAINAGE

N8. UTILITIES

G9. DEFLECTION AND/OR VIBRATION

N10. OTHER

59. SUPERSTRUCTURE 6

F

2. GIRDERS OR BEAMS

1. BEARING DEVICES

F

N3. ARCH(ES) OR SLAB(S)

N4. FLOOR BEAMS AND STRINGERS

N5. TRUSSES

G6. DIAPHRAGMS AND BRACING

N7. PAINT

N8. FASCIA(E)

G9. DEFLECTION AND/OR VIBRATION

G10. ALIGNMENT

N11. OTHER

60. SUBSTRUCTURE 6

58.1 MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON DECK

UNDERSIDE AT ISOLATED LOCATIONS. SPALLING WITH EXPOSED

REBAR ON DECK UNDERSIDE AT SPAN #2, EAST AND WEST BAYS,

AND AT SPAN #3, WEST BAY NEAR NORTH PIER. MINOR SPALLING

OF UNDERSIDE OF EAST OVERHANG AT SOUTH ABUTMENT AND

WEST OVERHANG AT NORTH ABUTMENT.

58.2,3, 222.4 EXPANSION JOINTS HAVE BEEN PAVED OVER; MODERATE

TRANSVERSE CRACKING AND BREAKING-UP (UP TO 6"W X 3"D) OF

WEARING SURFACE OVER EXPANSION JOINTS AT PIERS AND

ABUTMENTS. WATER LEAKAGE THROUGH EXPANSION JOINTS

ONTO SUBSTRUCTURE UNITS.

MODERATE WIDESPREAD RANDOM CRACKING (UP TO 1/4"W) OF

ASPHALT WEARING SURFACE AND APPROACH PAVEMENT.

58.5,6 MINOR CRACKING OF CURBS AND RAILINGS. EXPANSION JOINTS IN

CURBS AND RAILINGS ARE CLOSED OVER PIERS AND ABUTMENTS;

MINOR SPALLING OF CURBS AND RAILINGS.

58.7 MINOR TO MODERATE ACCUMULATION OF DEBRIS IN CURBLINES;

DECK DRAINS ARE CLOGGED OR PARTIALLY FILLED WITH

VEGETATION GROWTH.

59.1, 60.10 MODERATE RUSTING OF BEARING DEVICES AND SEVERE RUSTING

OF ANCHOR BOLTS AND NUTS. ANCHOR BOLTS AT NORTH

ABUTMENT BENT TOWARD BACKWALL. FIXED BEARING AT GIRDER

#2 AND #3, SOUTH ABUTMENT, HAS ROTATED TOWARD BACKWALL.

EXPANSION BEARINGS AT SOUTH PIER HAVE SHIFTED NORTH;

BEARINGS AT CENTER PIER SHIFTED SOUTH.

59.2 PREVIOUSLY REPORTED COLLISION DAMAGE TO GIRDERS #1 TO #4

IN SPAN #2 REPAIRED WITH FIBERGLASS WRAP IN PAST. AREAS OF

MINOR SPALLING FROM COLLISION DAMAGE TO GIRDERS #1 TO #4

REMAINS AT OTHER LOCATIONS IN SPAN #2.

MINOR SPALLING OF GIRDERS AT SPOT LOCATIONS FROM

PLACEMENT DURING CONSTRUCTION. MINOR DIAGONAL

CRACKING OF GIRDER WEBS EXTENDING FROM CORNERS OF END

DIAPHRAGMS.

ABUTMENTS

BREASTWALLS OR COLUMNS 1. G

PILE BENTS 2. N

CAPS AND/OR BEARING SEATS 3. F

BACKWALLS AND/OR BULKHEADS 4. G

FOUNDATIONS 5. N

WINGWALLS 6. G

WEEP HOLES 7. G

EXPANSION JOINTS 8. N

EROSION AND/OR SCOUR 9. G

SETTLEMENT OR DEFLECTION 10. F

SLOPE PROTECTION 11. P

OTHER 12. N

PIER(S)

WALLS AND/OR COLUMNS 13. G

PILE BENTS 14. N

CAPS AND/OR BEARING SEATS 15. F

FOUNDATIONS 16. N

EROSION AND/OR SCOUR 17. G

SETTLEMENT OR DEFLECTION 18. G

OTHER 19. N

FIELD INSPECTION REPORT STRUCTURE NO. 5570-135P

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL N

222. APPROACHES 6

OTHER 9.

ALIGNMENT 8.

SIGNS 7.

SETTLEMENT 6.

EROSION 5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

1. APPROACH SLABS N

N N F G G G G N

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION 5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDS D.

APPROACH GUARDRAILS C.

TRANSITIONS B.

BRIDGE RAILINGSA. 0

N N N

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

60.1 MINOR VERTICAL CRACKING OF ABUTMENT BREASTWALLS.

60.3,15 MINOR ACCUMULATION OF DEBRIS ON BEARING SEATS AT

ABUTMENTS AND PIERS.

60.4 MINOR RANDOM CRACKING WITH EFFLORESCENCE ON BACKWALL

ADJACENT TO GIRDERS #1 AND #4 AT NORTH ABUTMENT.

60.6 MINOR COLLISION DAMAGE TO NORTH END OF EAST PARAPET AT

NORTH ABUTMENT. MINOR SPALL WITH EXPOSED REBAR DUE TO

INSUFFICIENT CONCRETE COVER ON SOUTHEAST WINGWALL NEAR

END.

60.7 FILTERS HAVE BEEN INSTALLED TO PREVENT LOSS OF FILL

THROUGH WEEP HOLES.

60.9, 222.5 PREVIOUSLY NOTED MODERATE EROSION ALONG WEST END OF

SOUTH ABUTMENT SLOPE AND ALONG WINGWALL WITH MINOR

EXPOSURE OF SOUTH ABUTMENT FOOTING HAS BEEN REPAIRED

SINCE LAST INSPECTION.

60.11 NORTH SLOPE PROTECTION HAS SETTLED (UP TO 1') WITH FULL

DEPTH TRANSVERSE CRACKS (UP TO 2"W); SLOPE PROTECTION IS

UNDERMINED (UP TO 1') AT NORTHEAST CORNER. HEAVY

VEGETATION GROWTH ON SLOPE PROTECTION AND IN CRACKS;

VEGETATION EXTENDS ONTO SUPERSTRUCTURE.

CONCRETE SLOPE PROTECTION PANEL PLACED BELOW DECK

DRAIN ON WEST SIDE OF SOUTH ABUTMENT SLOPE AT BASE;

MINOR UNDERMINING OF PANEL.

60.13 MINOR SPALLING DUE TO COLLISION DAMAGE AT CENTER AND

EAST COLUMNS AT SOUTH PIER; REPAIRED COLLISION DAMAGE TO

WEST COLUMN.

60.15 MINOR DETERIORATION OF CONCRETE ON UNDERSIDE OF PIER

CAPS DUE TO MOISTURE. MINOR CRACKING WITH

EFFLORESCENCE AND STAINING ON PIER CAPS. MINOR SPALLING

OF SOUTH PIER CAP. MINOR TRANSVERSE CRACKING ON

UNDERSIDE OF NORTH PIER CAP NEAR EAST AND WEST COLUMNS.

222.7 TYPE 3 OBJECT MARKERS PRESENT AT ENDS OF RAILINGS. U.S.

DEPARTMENT OF INTERIOR BENCHMARK AT NORTH END OF WEST

CURB.

36.A RAILING HEIGHT OF 2'-1 1/2" DOES NOT MEET AASHTO MINIMUM

HEIGHT SPECIFICATION OF 2'-3" FOR TRAFFIC BARRIERS.

STRUCTURE LOAD RATING STRUCTURE NO. 5570-135P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 15 14 25 23

HS 19 17 31 28

TYPE 3 18 16 30 27

TYPE 3S2 24 22 41 37

TYPE 3-3 30 27 49 45

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: HS15 DESIGN LOAD USED FOR FIBERGLASS WRAP REPAIR.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-135P

U.S. ROUTE 51 BRIDGE INSPECTION DATE: 1/19/17

STRUCTURE IDENTIFICATION

(201) PARK: NATCHEZ TRACE PARKWAY (1) STATE: ....................................... 284 - MISSISSIPPI (MS)

(202) STRUCTURE NAME: .......... U.S. ROUTE 51 BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 089 - MADISON

(204) STRUCTURE NUMBER: ..... 5570-135P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... U.S. ROUTE 51

(207) ROAD SECTION NO: .......... 135P (7) FACILITY CARRIED: .................. NATCHEZ TRACE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5570135P0000000

(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 12.65 MILES SOUTH OF MS R

(210) OPERATING UNIT: ............. RIDGELND (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ 3P2 (11) MILE POINT: ............................. 102.07 (KM PT 164.26)

(212) DRAWING NUMBERS: ....... 3220A (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

5 - PRESTRESSED CONCRETE

02 - STRINGER/MULTI-BEAM or GIRDER

60.8 FT (18.5 M)

212.0 FT (64.6 M)

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)

(66) INVENTORY RATING: ...... 18.8 TONS (17.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 31.3 TONS (28.4 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 1/17 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-135P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(51) CURB TO CURB WIDTH: ........... 28.2 FT (8.6 M)

(16) LATITUDE: ............................. 32°25'34.80"

(17) LONGITUDE: ......................... 90°07'47.70"

(19) DETOUR LENGTH: ............... 25 MI (40 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 02

(42A) SERVICE ON: ..................... 1 - HIGHWAY

(42B) SERVICE UNDER: .............. 1 - HIGHWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... N

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 9.8 FT (3.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

32.5 FT (9.9 M)

34.0 FT (10.4 M)

22.0 FT (6.7 M)

6.0 FT (1.8 M)

6.0 FT (1.8 M)

0 - NO MEDIAN

28 °

NO

28.0 FT (8.5 M)

0.0 FT (0.0 M)

0.0 FT (0.0 M)

1 - FULL HEIGHT (NO PARAPE

1 - CONCRETE

1 - CONTINUOUS RAIL

2.13 FT (0.65 M)

99.99 FT (99.99 M)

15.67 FT (4.78 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL: .......................... N

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 0NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

N - Not over waterway.

2 - REHAB/RECONSTRUCTION

D - MINOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1982-Joint repair.2005-Underpass realignment work underway.2006-Girders repaired in Span #2 due to collision.2016-Erosion repaired at west end of south abutment slope and wingwall.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:90�07'47.70 http:32�25'34.80

APPENDIX STRUCTURE NO. 5570-135P

PHOTOGRAPHS STRUCTURE NO. 5570-135P

PHOTO #1 - LOOKING SOUTHBOUND TOWARD NATCHEZ

PHOTO #2 - EAST SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW

LOOKING SOUTH

PHOTO #4 - TYPICAL TRANSVERSE CRACKING

AND BREAKING-UP OF ASPHALT WEARING

SURFACE OVER EXPANSION JOINTS AT PIERS

AND ABUTMENTS; OVER NORTH PIER SHOWN

PHOTO #5 - TYPICAL TRANSVERSE CRACKING

AND BREAKING-UP OF ASPHALT WEARING

SURFACE OVER EXPANSION JOINTS AT PIERS

AND ABUTMENTS; OVER NORTH ABUTMENT

SHOWN

PHOTO #6 - TYPICAL RANDOM CRACKING OF

ASPHALT WEARING SURFACE; SOUTHBOUND

LANE IN SPAN #1 SHOWN

PHOTO #7 - TYPICAL RANDOM CRACKING OF ASPHALT WEARING

SURFACE; NORTHBOUND LANE IN SPAN #3 SHOWN

PHOTO #8 - TYPICAL RANDOM CRACKING OF ASPHALT WEARING

SURFACE; SPAN #4 SHOWN

PHOTO #9 - TYPICAL SPALLING OF CURBS AND RAILINGS AT

EXPANSION JOINTS; WEST CURB AND RAILING AT NORTH PIER SHOWN

PHOTO #10 - TYPICAL DECK DRAIN CLOGGED OR PARTIALLY FILLED

WITH VEGETATION GROWTH; WEST DECK DRAIN AT NORTH

ABUTMENT SHOWN

PHOTO #11 - TYPICAL RANDOM CRACKING OF APPROACH PAVEMENT;

SOUTH APPROACH SHOWN

PHOTO #12 - TYPICAL RANDOM CRACKING OF APPROACH PAVEMENT;

NORTH APPROACH SHOWN

PHOTO #13 - GENERAL UNDERSIDE VIEW LOOKING SOUTH, SPAN #2

PHOTO #14 - TYPICAL TRANSVERSE CRACKING WITH

EFFLORESCENCE ON DECK UNDERSIDE; CENTER BAY AT SOUTH

ABUTMENT SHOWN

PHOTO #15 - SPALLING WITH EXPOSED REBAR ON DECK UNDERSIDE

AT SPAN #2, EAST BAY

PHOTO #16 - TYPICAL RUSTING OF BEARING DEVICES, ANCHOR BOLTS

AND NUTS; GIRDER #1 BEARING AT NORTH ABUTMENT SHOWN; ALSO

NOTE TYPICAL ACCUMULATION OF DEBRIS ON BEARING SEATS

PHOTO #17 - FIXED BEARING AT GIRDER #2, SOUTH ABUTMENT

ROTATED TOWARD BACKWALL; ALSO NOTE TYPICAL SPALLING OF

GIRDERS FROM PLACEMENT DURING CONSTRUCTION

PHOTO #18 - TYPICAL EXPANSION BEARING AT SOUTH PIER SHIFTED

NORTH; GIRDER #3 BEARING SHOWN; ALSO NOTE WATER LEAKAGE

THROUGH EXPANSION JOINTS ONTO SUBSTRUCTURE UNITS

PHOTO #19 - PREVIOUSLY REPORTED COLLISION DAMAGE TO

GIRDERS #1 TO #4 IN SPAN #2 REPAIRED WITH FIBERGLASS WRAP IN

PAST

PHOTO #20 - AREAS OF SPALLING FROM COLLISION DAMAGE TO

GIRDERS #1 TO #4 REMAINS AT OTHER LOCATIONS IN SPAN #2;

GIRDER #2 NEAR SOUTH PIER SHOWN

PHOTO #21 - TYPICAL DIAGONAL CRACKING OF GIRDER WEBS

EXTENDING FROM CORNERS OF END DIAPHRAGMS; GIRDER #3 IN

SPAN #2 AT SOUTH PIER SHOWN

PHOTO #22 - GENERAL VIEW OF SOUTH ABUTMENT; NOTE TYPICAL

LEAKAGE THROUGH EXPANSION JOINTS ONTO SUBSTRUCTURE UNITS

PHOTO #23 - RANDOM CRACKING WITH EFFLORESCENCE ON

BACKWALL ADJACENT TO GIRDER #1 AT NORTH ABUTMENT

PHOTO #24 - PREVIOUSLY NOTED EROSION ALONG WEST END OF

SOUTH ABUTMENT SLOPE AND ALONG WINGWALL HAS BEEN

REPAIRED SINCE LAST INSPECTION

PHOTO #25 - NORTH SLOPE PROTECTION HAS SETTLED WITH

TRANSVERSE CRACKS; ALSO NOTE TYPICAL VEGETATION GROWTH

ON SLOPE PROTECTION AND IN CRACKS

PHOTO #26 - NORTH ABUTMENT SLOPE PROTECTION UNDERMINED AT

NORTHEAST CORNER

PHOTO #27 - CONCRETE SLOPE PROTECTION PANEL PLACED BELOW

DECK DRAIN ON WEST SIDE OF SOUTH ABUTMENT SLOPE AT BASE;

NOTE UNDERMINING OF PANEL

PHOTO #28 - GENERAL VIEW OF SOUTH PIER, NORTH SIDE; NOTE

TYPICAL LEAKAGE THROUGH EXPANSION JOINTS ONTO

SUBSTRUCTURE UNITS

PHOTO #29 - TYPICAL SPALLING DUE TO COLLISION DAMAGE AT

CENTER AND EAST COLUMNS AT SOUTH PIER; CENTER COLUMN

SHOWN

PHOTO #30 - TYPICAL CRACKING WITH EFFLORESCENCE AND

STAINING ON PIER CAPS; SOUTH SIDE OF CENTER PIER CAP BELOW

GIRDER #1 SHOWN