This solicitation requests bids for a bridge preventive maintenance project on the Natchez Trace Parkway. The project consists of repairs to sixteen bridges, including deteriorated expansion joints, asphalt pavement cracks cleaning and sealing, concrete repairs, and other miscellaneous work. The work will be split into multiple contract schedules or options, with the total cost expected to range between $500,000 to $1,000,000. Sealed bids are due from certified Small Business Concerns by the date specified in the solicitation. The solicitation provides details on obtaining bid documents, registration for email notifications, annual representation and certification requirements, and payment procedures.
Bridge Inspection Report
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NATR BMS FY19(1).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| 5570-484P3438.pdf | ||
| 5570-501P13750.pdf | ||
| 5570-474P3438.pdf | ||
| 5570-502P6875.pdf | ||
| 5570-473P4583.pdf | ||
| 5570-477P1964.pdf | ||
| 5570-500P28.pdf | ||
| FP14_Eng.pdf | ||
| IFB_Solicitation_-_NATR_BMS_FY19(1).pdf | ||
| 5570-479P1528.pdf | ||
| 5570-475P2750.pdf | ||
| 5570-498P1719.pdf | ||
| 5570-482P6875.pdf | ||
| VETS-4212_-_Form.pdf | ||
| NEPA_CE.pdf | ||
| 5570-472P6875.pdf | ||
| 5570-503P4583.pdf | ||
| 5570-471P13750.pdf | ||
| 5570-499P1528.pdf | ||
| Plans_-_NP-NATR_BMS_FY19(1).pdf | ||
| Synopsis_-_NATR_BMS_FY19(1).doc | DOC document |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5570-135P
U.S. ROUTE 51 BRIDGE INSPECTION DATE: 1/19/17
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... PRESTRESSED CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... NO. OF APPR. SPANS: ........ STRINGER/MULTI-BEAM or GIRDER 0
# OF BEAMS, MAIN SPAN: .. 4 STRUCT. TOTAL LENGTH: .. 212.0 FT (64.6 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 60.8 FT (18.5 M)
WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 32.5 FT (9.9 M)
ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 28.2 FT (8.6 M)
PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 3P2 / 3220A SKEW ANGLE: ..................... 28 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1982-Joint repair.2005-Underpass realignment work underway.2006-Girders repaired in Span #2 due to collision.2016-Erosion repaired at west end of south abutment slope and wingwall.
LOCATION
NATCHEZ TRACE PARKWAY MILE POINT: ..................... 102.07 (KM PT 164.26)
STATE: ................................. MISSISSIPPI LOCATION: 12.65 MILES SOUTH OF MS ROUTE 43.
FACILITY CARRIED: ............ NATCHEZ TRACE PARKWAY
FEATURE INTERSECTED: .. U.S. ROUTE 51
STRUCTURE EVALUATION SUMMARY
This prestressed concrete multi-girder bridge is in fair condition overall. It appears that one or both of the abutments may have rotated toward the center of the bridge at some time in the past, forcing all of the spans closer together.
This apparent movement is evidenced by closure of the expansion joints and spalling in the rails, curbs, and deck overhangs, as well as damage to the bearing devices and anchor bolts at the abutments. This condition will continue to be monitored during future inspections.
Another problem is leakage through the expansion joints. Cracks in the asphalt wearing surface over the joints allow water to flow down onto the superstructure, contributing to the corrosion of the bearing devices. Deck expansion joints should be installed and the roadway repaved to help prevent further deterioration.
Other problems include spalling with exposed rebar on the deck underside at spot locations; minor diagonal cracking at the beams from the end diaphragms corners; cracking and deterioration of the concrete particularly at the underside of the pier caps due to excessive moisture; cracking, settlement, and undermining of the north abutment slope protection; and minor collision damage to the girders and some columns.
It should be noted the previous erosion along the west end of the south abutment and along the wingwall with minor exposure of the abutment footing has been repaired since the last inspection.
Corrective measures should be taken as outlined in this report to help prevent the possible development of more
INSPECTION TEAM: A.D. MITCHEM, M.S. RAIFET (CLARK NEXSEN)
CONDITION ASSESSMENT:
A. DWAYNE MITCHEM, PE, FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 5/31/17
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
STRUCTURE SUMMARY STRUCTURE NO. 5570-135P
STRUCTURE EVALUATION SUMMARY CONTINUED
serious or costly problems in the future.
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-135P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
58.7 CLEAN DECK DRAINS AS NECESSARY.
60.11 REMOVE VEGETATION GROWTH FROM ON AND AROUND STRUCTURE.
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
58.2,3, 222.4
INSTALL DECK EXPANSION JOINT SEALS AND REPAVE ROADWAY
OVER STRUCTURE AND APPROACHES.
60.11 RECONSTRUCT SLOPE PROTECTION AT NORTH ABUTMENT.
59.1 CLEAN AND PAINT BEARING DEVICES.
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN CONSTRUCTION ENGINEERING (70% TOTAL REHAB COST)
PLUS PARK LOCATION FACTOR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5570-135P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.
8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present
7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal
5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 6 ITEM REFERENCE AND REMARKS
F1. DECK SLAB
P2. EXPANSION JOINTS
F3. WEARING SURFACE
G4. RIDEABILITY
G5. CURBS, SIDEWALKS, AND MEDIAN
G6. PARAPETS AND/OR RAILINGS
F7. DRAINS AND DRAINAGE
N8. UTILITIES
G9. DEFLECTION AND/OR VIBRATION
N10. OTHER
59. SUPERSTRUCTURE 6
F
2. GIRDERS OR BEAMS
1. BEARING DEVICES
F
N3. ARCH(ES) OR SLAB(S)
N4. FLOOR BEAMS AND STRINGERS
N5. TRUSSES
G6. DIAPHRAGMS AND BRACING
N7. PAINT
N8. FASCIA(E)
G9. DEFLECTION AND/OR VIBRATION
G10. ALIGNMENT
N11. OTHER
60. SUBSTRUCTURE 6
58.1 MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON DECK
UNDERSIDE AT ISOLATED LOCATIONS. SPALLING WITH EXPOSED
REBAR ON DECK UNDERSIDE AT SPAN #2, EAST AND WEST BAYS,
AND AT SPAN #3, WEST BAY NEAR NORTH PIER. MINOR SPALLING
OF UNDERSIDE OF EAST OVERHANG AT SOUTH ABUTMENT AND
WEST OVERHANG AT NORTH ABUTMENT.
58.2,3, 222.4 EXPANSION JOINTS HAVE BEEN PAVED OVER; MODERATE
TRANSVERSE CRACKING AND BREAKING-UP (UP TO 6"W X 3"D) OF
WEARING SURFACE OVER EXPANSION JOINTS AT PIERS AND
ABUTMENTS. WATER LEAKAGE THROUGH EXPANSION JOINTS
ONTO SUBSTRUCTURE UNITS.
MODERATE WIDESPREAD RANDOM CRACKING (UP TO 1/4"W) OF
ASPHALT WEARING SURFACE AND APPROACH PAVEMENT.
58.5,6 MINOR CRACKING OF CURBS AND RAILINGS. EXPANSION JOINTS IN
CURBS AND RAILINGS ARE CLOSED OVER PIERS AND ABUTMENTS;
MINOR SPALLING OF CURBS AND RAILINGS.
58.7 MINOR TO MODERATE ACCUMULATION OF DEBRIS IN CURBLINES;
DECK DRAINS ARE CLOGGED OR PARTIALLY FILLED WITH
VEGETATION GROWTH.
59.1, 60.10 MODERATE RUSTING OF BEARING DEVICES AND SEVERE RUSTING
OF ANCHOR BOLTS AND NUTS. ANCHOR BOLTS AT NORTH
ABUTMENT BENT TOWARD BACKWALL. FIXED BEARING AT GIRDER
#2 AND #3, SOUTH ABUTMENT, HAS ROTATED TOWARD BACKWALL.
EXPANSION BEARINGS AT SOUTH PIER HAVE SHIFTED NORTH;
BEARINGS AT CENTER PIER SHIFTED SOUTH.
59.2 PREVIOUSLY REPORTED COLLISION DAMAGE TO GIRDERS #1 TO #4
IN SPAN #2 REPAIRED WITH FIBERGLASS WRAP IN PAST. AREAS OF
MINOR SPALLING FROM COLLISION DAMAGE TO GIRDERS #1 TO #4
REMAINS AT OTHER LOCATIONS IN SPAN #2.
MINOR SPALLING OF GIRDERS AT SPOT LOCATIONS FROM
PLACEMENT DURING CONSTRUCTION. MINOR DIAGONAL
CRACKING OF GIRDER WEBS EXTENDING FROM CORNERS OF END
DIAPHRAGMS.
ABUTMENTS
BREASTWALLS OR COLUMNS 1. G
PILE BENTS 2. N
CAPS AND/OR BEARING SEATS 3. F
BACKWALLS AND/OR BULKHEADS 4. G
FOUNDATIONS 5. N
WINGWALLS 6. G
WEEP HOLES 7. G
EXPANSION JOINTS 8. N
EROSION AND/OR SCOUR 9. G
SETTLEMENT OR DEFLECTION 10. F
SLOPE PROTECTION 11. P
OTHER 12. N
PIER(S)
WALLS AND/OR COLUMNS 13. G
PILE BENTS 14. N
CAPS AND/OR BEARING SEATS 15. F
FOUNDATIONS 16. N
EROSION AND/OR SCOUR 17. G
SETTLEMENT OR DEFLECTION 18. G
OTHER 19. N
FIELD INSPECTION REPORT STRUCTURE NO. 5570-135P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL N
222. APPROACHES 6
OTHER 9.
ALIGNMENT 8.
SIGNS 7.
SETTLEMENT 6.
EROSION 5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS 2.
1. APPROACH SLABS N
N N F G G G G N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION 5.
EROSION AND/OR SCOUR 4.
FOUNDATION 3.
WEEP HOLES 2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 0
N N N
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
60.1 MINOR VERTICAL CRACKING OF ABUTMENT BREASTWALLS.
60.3,15 MINOR ACCUMULATION OF DEBRIS ON BEARING SEATS AT
ABUTMENTS AND PIERS.
60.4 MINOR RANDOM CRACKING WITH EFFLORESCENCE ON BACKWALL
ADJACENT TO GIRDERS #1 AND #4 AT NORTH ABUTMENT.
60.6 MINOR COLLISION DAMAGE TO NORTH END OF EAST PARAPET AT
NORTH ABUTMENT. MINOR SPALL WITH EXPOSED REBAR DUE TO
INSUFFICIENT CONCRETE COVER ON SOUTHEAST WINGWALL NEAR
END.
60.7 FILTERS HAVE BEEN INSTALLED TO PREVENT LOSS OF FILL
THROUGH WEEP HOLES.
60.9, 222.5 PREVIOUSLY NOTED MODERATE EROSION ALONG WEST END OF
SOUTH ABUTMENT SLOPE AND ALONG WINGWALL WITH MINOR
EXPOSURE OF SOUTH ABUTMENT FOOTING HAS BEEN REPAIRED
SINCE LAST INSPECTION.
60.11 NORTH SLOPE PROTECTION HAS SETTLED (UP TO 1') WITH FULL
DEPTH TRANSVERSE CRACKS (UP TO 2"W); SLOPE PROTECTION IS
UNDERMINED (UP TO 1') AT NORTHEAST CORNER. HEAVY
VEGETATION GROWTH ON SLOPE PROTECTION AND IN CRACKS;
VEGETATION EXTENDS ONTO SUPERSTRUCTURE.
CONCRETE SLOPE PROTECTION PANEL PLACED BELOW DECK
DRAIN ON WEST SIDE OF SOUTH ABUTMENT SLOPE AT BASE;
MINOR UNDERMINING OF PANEL.
60.13 MINOR SPALLING DUE TO COLLISION DAMAGE AT CENTER AND
EAST COLUMNS AT SOUTH PIER; REPAIRED COLLISION DAMAGE TO
WEST COLUMN.
60.15 MINOR DETERIORATION OF CONCRETE ON UNDERSIDE OF PIER
CAPS DUE TO MOISTURE. MINOR CRACKING WITH
EFFLORESCENCE AND STAINING ON PIER CAPS. MINOR SPALLING
OF SOUTH PIER CAP. MINOR TRANSVERSE CRACKING ON
UNDERSIDE OF NORTH PIER CAP NEAR EAST AND WEST COLUMNS.
222.7 TYPE 3 OBJECT MARKERS PRESENT AT ENDS OF RAILINGS. U.S.
DEPARTMENT OF INTERIOR BENCHMARK AT NORTH END OF WEST
CURB.
36.A RAILING HEIGHT OF 2'-1 1/2" DOES NOT MEET AASHTO MINIMUM
HEIGHT SPECIFICATION OF 2'-3" FOR TRAFFIC BARRIERS.
STRUCTURE LOAD RATING STRUCTURE NO. 5570-135P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 19 17 31 28
TYPE 3 18 16 30 27
TYPE 3S2 24 22 41 37
TYPE 3-3 30 27 49 45
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: HS15 DESIGN LOAD USED FOR FIBERGLASS WRAP REPAIR.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-135P
U.S. ROUTE 51 BRIDGE INSPECTION DATE: 1/19/17
STRUCTURE IDENTIFICATION
(201) PARK: NATCHEZ TRACE PARKWAY (1) STATE: ....................................... 284 - MISSISSIPPI (MS)
(202) STRUCTURE NAME: .......... U.S. ROUTE 51 BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 089 - MADISON
(204) STRUCTURE NUMBER: ..... 5570-135P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... U.S. ROUTE 51
(207) ROAD SECTION NO: .......... 135P (7) FACILITY CARRIED: .................. NATCHEZ TRACE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5570135P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 12.65 MILES SOUTH OF MS R
(210) OPERATING UNIT: ............. RIDGELND (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 3P2 (11) MILE POINT: ............................. 102.07 (KM PT 164.26)
(212) DRAWING NUMBERS: ....... 3220A (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
5 - PRESTRESSED CONCRETE
02 - STRINGER/MULTI-BEAM or GIRDER
60.8 FT (18.5 M)
212.0 FT (64.6 M)
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)
(66) INVENTORY RATING: ...... 18.8 TONS (17.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 31.3 TONS (28.4 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 1/17 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-135P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(51) CURB TO CURB WIDTH: ........... 28.2 FT (8.6 M)
(16) LATITUDE: ............................. 32°25'34.80"
(17) LONGITUDE: ......................... 90°07'47.70"
(19) DETOUR LENGTH: ............... 25 MI (40 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 9.8 FT (3.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
32.5 FT (9.9 M)
34.0 FT (10.4 M)
22.0 FT (6.7 M)
6.0 FT (1.8 M)
6.0 FT (1.8 M)
0 - NO MEDIAN
28 °
NO
28.0 FT (8.5 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
1 - FULL HEIGHT (NO PARAPE
1 - CONCRETE
1 - CONTINUOUS RAIL
2.13 FT (0.65 M)
99.99 FT (99.99 M)
15.67 FT (4.78 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL: .......................... N
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1982-Joint repair.2005-Underpass realignment work underway.2006-Girders repaired in Span #2 due to collision.2016-Erosion repaired at west end of south abutment slope and wingwall.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
http:90�07'47.70 http:32�25'34.80
APPENDIX STRUCTURE NO. 5570-135P
PHOTOGRAPHS STRUCTURE NO. 5570-135P
PHOTO #1 - LOOKING SOUTHBOUND TOWARD NATCHEZ
PHOTO #2 - EAST SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW
LOOKING SOUTH
PHOTO #4 - TYPICAL TRANSVERSE CRACKING
AND BREAKING-UP OF ASPHALT WEARING
SURFACE OVER EXPANSION JOINTS AT PIERS
AND ABUTMENTS; OVER NORTH PIER SHOWN
PHOTO #5 - TYPICAL TRANSVERSE CRACKING
AND BREAKING-UP OF ASPHALT WEARING
SURFACE OVER EXPANSION JOINTS AT PIERS
AND ABUTMENTS; OVER NORTH ABUTMENT
SHOWN
PHOTO #6 - TYPICAL RANDOM CRACKING OF
ASPHALT WEARING SURFACE; SOUTHBOUND
LANE IN SPAN #1 SHOWN
PHOTO #7 - TYPICAL RANDOM CRACKING OF ASPHALT WEARING
SURFACE; NORTHBOUND LANE IN SPAN #3 SHOWN
PHOTO #8 - TYPICAL RANDOM CRACKING OF ASPHALT WEARING
SURFACE; SPAN #4 SHOWN
PHOTO #9 - TYPICAL SPALLING OF CURBS AND RAILINGS AT
EXPANSION JOINTS; WEST CURB AND RAILING AT NORTH PIER SHOWN
PHOTO #10 - TYPICAL DECK DRAIN CLOGGED OR PARTIALLY FILLED
WITH VEGETATION GROWTH; WEST DECK DRAIN AT NORTH
ABUTMENT SHOWN
PHOTO #11 - TYPICAL RANDOM CRACKING OF APPROACH PAVEMENT;
SOUTH APPROACH SHOWN
PHOTO #12 - TYPICAL RANDOM CRACKING OF APPROACH PAVEMENT;
NORTH APPROACH SHOWN
PHOTO #13 - GENERAL UNDERSIDE VIEW LOOKING SOUTH, SPAN #2
PHOTO #14 - TYPICAL TRANSVERSE CRACKING WITH
EFFLORESCENCE ON DECK UNDERSIDE; CENTER BAY AT SOUTH
ABUTMENT SHOWN
PHOTO #15 - SPALLING WITH EXPOSED REBAR ON DECK UNDERSIDE
AT SPAN #2, EAST BAY
PHOTO #16 - TYPICAL RUSTING OF BEARING DEVICES, ANCHOR BOLTS
AND NUTS; GIRDER #1 BEARING AT NORTH ABUTMENT SHOWN; ALSO
NOTE TYPICAL ACCUMULATION OF DEBRIS ON BEARING SEATS
PHOTO #17 - FIXED BEARING AT GIRDER #2, SOUTH ABUTMENT
ROTATED TOWARD BACKWALL; ALSO NOTE TYPICAL SPALLING OF
GIRDERS FROM PLACEMENT DURING CONSTRUCTION
PHOTO #18 - TYPICAL EXPANSION BEARING AT SOUTH PIER SHIFTED
NORTH; GIRDER #3 BEARING SHOWN; ALSO NOTE WATER LEAKAGE
THROUGH EXPANSION JOINTS ONTO SUBSTRUCTURE UNITS
PHOTO #19 - PREVIOUSLY REPORTED COLLISION DAMAGE TO
GIRDERS #1 TO #4 IN SPAN #2 REPAIRED WITH FIBERGLASS WRAP IN
PAST
PHOTO #20 - AREAS OF SPALLING FROM COLLISION DAMAGE TO
GIRDERS #1 TO #4 REMAINS AT OTHER LOCATIONS IN SPAN #2;
GIRDER #2 NEAR SOUTH PIER SHOWN
PHOTO #21 - TYPICAL DIAGONAL CRACKING OF GIRDER WEBS
EXTENDING FROM CORNERS OF END DIAPHRAGMS; GIRDER #3 IN
SPAN #2 AT SOUTH PIER SHOWN
PHOTO #22 - GENERAL VIEW OF SOUTH ABUTMENT; NOTE TYPICAL
LEAKAGE THROUGH EXPANSION JOINTS ONTO SUBSTRUCTURE UNITS
PHOTO #23 - RANDOM CRACKING WITH EFFLORESCENCE ON
BACKWALL ADJACENT TO GIRDER #1 AT NORTH ABUTMENT
PHOTO #24 - PREVIOUSLY NOTED EROSION ALONG WEST END OF
SOUTH ABUTMENT SLOPE AND ALONG WINGWALL HAS BEEN
REPAIRED SINCE LAST INSPECTION
PHOTO #25 - NORTH SLOPE PROTECTION HAS SETTLED WITH
TRANSVERSE CRACKS; ALSO NOTE TYPICAL VEGETATION GROWTH
ON SLOPE PROTECTION AND IN CRACKS
PHOTO #26 - NORTH ABUTMENT SLOPE PROTECTION UNDERMINED AT
NORTHEAST CORNER
PHOTO #27 - CONCRETE SLOPE PROTECTION PANEL PLACED BELOW
DECK DRAIN ON WEST SIDE OF SOUTH ABUTMENT SLOPE AT BASE;
NOTE UNDERMINING OF PANEL
PHOTO #28 - GENERAL VIEW OF SOUTH PIER, NORTH SIDE; NOTE
TYPICAL LEAKAGE THROUGH EXPANSION JOINTS ONTO
SUBSTRUCTURE UNITS
PHOTO #29 - TYPICAL SPALLING DUE TO COLLISION DAMAGE AT
CENTER AND EAST COLUMNS AT SOUTH PIER; CENTER COLUMN
SHOWN
PHOTO #30 - TYPICAL CRACKING WITH EFFLORESCENCE AND
STAINING ON PIER CAPS; SOUTH SIDE OF CENTER PIER CAP BELOW
GIRDER #1 SHOWN