This solicitation is for a bridge preventive maintenance project on the Natchez Trace Parkway. The project consists of repairs to sixteen bridges, including work on deteriorated expansion joints, asphalt pavement crack cleaning and sealing, concrete repairs, and other miscellaneous tasks. The project value is estimated between $500,000 to $1,000,000 and will be split into multiple work schedules or contract options. Sealed bids from certified Small Business Concerns will be accepted, with bid documents available on or around October 22, 2019 and bids due on a date specified in the solicitation. The solicitation is designated for small businesses and includes standard clauses around representations and certifications, payment requirements, and security protocols for visitors.

Bridge Inspection Report

View the file

Other files for this federal contract opportunity

Other files attached to Natchez Trace Parkway, newest first.
File Type Posted
Results of Bid Opening - NATR BMS FY19(1).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
5570-482P6875.pdf PDF
VETS-4212_-_Form.pdf PDF
NEPA_CE.pdf PDF
5570-472P6875.pdf PDF
5570-503P4583.pdf PDF
5570-135P2750.pdf PDF
5570-499P1528.pdf PDF
Plans_-_NP-NATR_BMS_FY19(1).pdf PDF
5570-477P1964.pdf PDF
5570-500P28.pdf PDF
FP14_Eng.pdf PDF
IFB_Solicitation_-_NATR_BMS_FY19(1).pdf PDF
5570-479P1528.pdf PDF
5570-475P2750.pdf PDF
5570-498P1719.pdf PDF
5570-484P3438.pdf PDF
5570-501P13750.pdf PDF
5570-474P3438.pdf PDF
5570-502P6875.pdf PDF
5570-473P4583.pdf PDF
Synopsis_-_NATR_BMS_FY19(1).doc DOC document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 5570-471P

ILLINOIS CENTRAL RR/HILDA DRIVE BRIDGE INSPECTION DATE: 10/5/17

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... P/S CONCRETE CONTINUOUS NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 5 STRUCT. TOTAL LENGTH: ..

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH:

WEARING SURFACE: .......... BITUMINOUS DECK WIDTH:

ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH:

PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: ..

PROJ./PLAN REF. NO: ......... / NONE SKEW ANGLE:

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL:

STRUCTURE HISTORY: ...... 2006 (EST.) - WEARING SURFACE ADDED.

LOCATION

380.0 FT (115.8 M)

105.0 FT (32.0 M)

37.0 FT (11.3 M)

34.0 FT (10.4 M)

N/A

17 °

NO

NATCHEZ TRACE PARKWAY MILE POINT: ..................... 94.83 (KM PT 152.61)

STATE: ................................. MISSISSIPPI LOCATION: 3P PROJECT SECTION

FACILITY CARRIED: ............ NATCHEZ TRACE PARKWAY

FEATURE INTERSECTED: .. RR & HILDA DRIVE

STRUCTURE EVALUATION SUMMARY

This continuous prestressed concrete multi-girder bridge is in good condition overall, but exhibits some problems that require attention. These include debris accumulation in the expansion joints; broken and bent bearing anchor bolts at the abutments; deterioration of the pavement relief joint seals and adjacent pavement in the approaches; damaged joint seals and settlement of the concrete slope protection at the abutments; and tree growth encroaching the superstructure in Span #2.

It should also be noted that the concrete diaphragms located over the piers exhibit some cracking, delamination, and spalling. The condition of the diaphragms will continue to be monitored during future inspections.

Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: P. JORDAN (SEH), M. COEN (GEOCAL)

CONDITION ASSESSMENT:

PAUL J. JORDAN, P.E., FIELD TEAM LEADER

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 2/28/18

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-471P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

222.2 REPAIR PAVEMENT, AND SAW CUT AND SEAL JOINTS OVER END OF ABUTMENT

SLABS AT BOTH APPROACHES.

60.11 CLEAN AND RESEAL JOINT BETWEEN SLOPE PROTECTION AND BREASTWALL AT

BOTH ABUTMENTS.

59.1 TIGHTEN OR REPLACE LOOSE AND DAMAGED ANCHOR BOLTS AND NUTS.

58.2, 59.11, 60.13

PERIODICALLY REMOVE DEBRIS FROM STRIP SEAL EXPANSION JOINTS AT

ABUTMENTS. REMOVE VINE GROWTH AND VEGETATION ENCROACHING ON

STRUCTURE.

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5570-471P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

F G N N N F N N G

F G

(TREE GROWTH)

G G G G F N

N

F

G

G

58.1,3 MINOR TRANSVERSE CRACKING OF DECK SLAB (UNABLE TO

VERIFY DUE TO ASPHALT OVERLAY). MINOR LONGITUDINAL

CRACKING OF ASPHALT WEARING SURFACE PARTICULARLY AT

SOUTHBOUND LANE IN SPAN #4.

METAL STAY IN PLACE FORMS ON DECK UNDERSIDE. MINOR

CRACKING WITH EFFLORESCENCE ON UNDERSIDE OF OVERHANGS

AT PIERS AND SPAN #4.

58.2 MODERATE ACCUMULATION OF DEBRIS IN STRIP SEAL EXPANSION

JOINTS AT ABUTMENTS.

58.5,6 MINOR TRANSVERSE CRACKING AND POPOUTS IN RAILINGS AND

CURBS.

VERTICAL CRACKING WITH EFFLORESCENCE ON EXTERIOR FACE

OF EAST CURB AT NORTH APPROACH; MINOR SPALL ON RAIL POST.

58.7 MINOR ACCUMULATION OF DEBRIS AT SPOT LOCATIONS IN

CURBLINES. EVIDENCE OF PONDING AT EAST END OF DECK

JOINTS.

59.1 ANCHOR BOLT NUTS ARE TYPICALLY LOOSE AT BOTH ABUTMENTS.

ANCHOR BOLTS AT NORTH ABUTMENT ARE BENT TOWARD CENTER

OF STRUCTURE. BROKEN ANCHOR BOLT AT BEARINGS #2, AND #3

AT SOUTH ABUTMENT.

59.6 MODERATE CRACKING, DELAMINATION AND SPALLING (UP TO 5 SF X

1-1/2" D EACH) OF CLOSURE DIAPHRAGMS OVER PIERS.

59.11 LARGE TREE GROWTH ENCROACHING SUPERSTRUCTURE IN SPAN

#2 NEAR PIERS.

60.1,4 MINOR VERTICAL CRACKING OF BOTH BREASTWALLS. MINOR

DIAGONAL CRACKING AT ENDS OF NORTH AND SOUTH ABUTMENT

BACKWALLS. MINOR VEGETATION GROWTH ON WEST END OF

NORTH ABUTMENT.

BREASTWALLS OR COLUMNS 1. G

PILE BENTS 2. N

CAPS AND/OR BEARING SEATS 3. G

BACKWALLS AND/OR BULKHEADS 4. G

FOUNDATIONS 5. N

WINGWALLS 6. G

WEEP HOLES 7. N

EXPANSION JOINTS 8. N

EROSION AND/OR SCOUR 9. G

SETTLEMENT OR DEFLECTION 10. N

SLOPE PROTECTION 11. F

OTHER (GRAFFITI) 12. F

PIER(S)

G13. WALLS AND/OR COLUMNS

N14. PILE BENTS

G15. CAPS AND/OR BEARING SEATS

N16. FOUNDATIONS

G17. EROSION AND/OR SCOUR

N18. SETTLEMENT OR DEFLECTION

F19. OTHER (GRAFFITI)

FIELD INSPECTION REPORT STRUCTURE NO. 5570-471P

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL N

222. APPROACHES 6

OTHER 9.

ALIGNMENT 8.

SIGNS 7.

SETTLEMENT 6.

EROSION 5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

1. APPROACH SLABS N

F N F G G G G N

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION 5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDS D.

APPROACH GUARDRAILS C.

TRANSITIONS B.

BRIDGE RAILINGSA. 1

N N N

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

60.6 MINOR VERTICAL AND HORIZONTAL CRACKING WITH

EFFLORESCENCE ON WINGWALLS. MOWER SCRAPES ON

WINGWALLS.

60.11 CONCRETE SLOPE PROTECTION SHIFTED AWAY FROM BOTH

ABUTMENTS; JOINT OPEN UP TO 2" WITH SEAL DETERIORATED FOR

FULL LENGTH AT BOTH ABUTMENTS. MINOR VEGETATION GROWTH

IN JOINT AT NORTH ABUTMENT. MINOR DIAGONAL CRACKING OF

SLOPE PROTECTION AT NORTH ABUTMENT. MINOR VEGETATION

GROWTH IN SLOPE PROTECTION PANEL JOINTS AT SOUTH

ABUTMENT.

60.12,19 GRAFFITI PAINTED ON NORTH ABUTMENT BREASTWALL AND ON

CENTER AND NORTH PIER WALLS.

60.13 MINOR CRACKING OF FINISH COAT ON ALL PIERS. MINOR VINE

GROWTH ON PIERS. VEGETATION GROWTH ENCROACHING

STRUCTURE AT WEST END OF SOUTH AND CENTER PIERS.

222.1 MINOR CRACKING OF BOTH APPROACH SLABS, (UNABLE TO VERIFY

DUE TO ASPHALT OVERLAY).

222.2,4 PAVEMENT SAW CUT AND SEALED OVER APPROACH END OF

ABUTMENT SLABS; MODERATE DETERIORATION OF SEALANT AND

ADJACENT ASPHALT PAVEMENT. MINOR SETTLEMENT OF ASPHALT

ALONG RELIEF JOINT AT NORTH APPROACH. MINOR RANDOM

CRACKING OF ASPHALT APPROACH PAVEMENT ELSEWHERE. NO

RELIEF JOINTS PRESENT AT APPROACH ENDS OF APPROACH

SLABS.

222.7 5"X16" BLACK AND YELLOW STRIPED OBJECT MARKER TAPE

PRESENT AT RAILING ENDS.

STRUCTURE LOAD RATING STRUCTURE NO. 5570-471P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 24 22 40 36

HS 36 33 60 55

TYPE 3 35 32 58 53

TYPE 3S2 41 37 68 62

TYPE 3-3 45 41 75 68

DESIGN LOADING: HS20 (MS18)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-471P

STRUCTURE IDENTIFICATION

(201) PARK: NATCHEZ TRACE PARKWAY

(202) STRUCTURE NAME: .......... ILLINOIS CENTRAL RR/HILDA DRIVE BRI

(203) STRUCTURE KIND: ............ 1 - BRIDGE

(204) STRUCTURE NUMBER: ..... 5570-471P

(205) NPS REGION: .................... 4 - SOUTHEAST

(206) ROUTE CODE NUMBER: ... 0

(207) ROAD SECTION NO: .......... 471P

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?: ....... YES

(210) OPERATING UNIT: ............. RIDGELND

(211) PROJECT NO(S):

(212) DRAWING NUMBERS: ....... NONE

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY/PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR: ..

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORICAL DESIGNATION: ..

284 - MISSISSIPPI (MS)

049 - HINDS

160000000

RR & HILDA DRIVE

NATCHEZ TRACE PARKWAY

5570471P0000000

3P PROJECT SECTION

99.99 FT (99.99 M)

94.83 (KM PT 152.61)

N/A

3 - FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

6 - P/S CONCRETE CONTINUOUS

02 - STRINGER/MULTI-BEAM or GIRDER

105.0 FT (32.0 M)

380.0 FT (115.8 M)

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 1 - CONCRETE

(44B) APPR. STR. TYPE: ................ 01 - SLAB

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 1 - EPOXY COATED REINF.

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)

(66) INVENTORY RATING: ...... 36.0 TONS (32.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 60.0 TONS (55.0 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 10/17 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-471P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 32°23'49.07" (51) CURB TO CURB WIDTH: ........... 34.0 FT (10.4 M)

(17) LONGITUDE: ......................... 90°14'39.33" (52) DECK WIDTH: ............................ 37.0 FT (11.3 M)

(19) DETOUR LENGTH: ............... 0 MI (0 KM) (32) APPR. ROADWAY WIDTH: ........ 34.0 FT (10.4 M)

(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)

(28B) LANES UNDER STRUCT: ... 02 LEFT SHOULDER: .................. 6.0 FT (1.8 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 6.0 FT (1.8 M)

(42B) SERVICE UNDER: .............. 4 - HIGHWAY-RAILROAD (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 210 (34) SKEW ANGLE: ............................ 17 °

(30) YEAR OF ADT: ...................... 2006 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 231 (47) TOTAL HORIZ. CLEARANCE: .... 34.0 FT (10.4 M)

(115) YEAR OF FUTURE ADT: ..... 2026 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE

(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 1 - CONCRETE

DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 31.0 FT (9.4 M) (215) BRIDGE RAIL HEIGHT: ............ 2.63 FT (0.80 M)

(56) LEFT: ......................... 23.5 FT (7.2 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 22.17 FT (6.76 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL: .......................... N

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

N

N - Not over waterway.

1 - MAINTENANCE

D - MINOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

2006 (EST.) - WEARING SURFACE ADDED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:90�14'39.33 http:32�23'49.07

APPENDIX STRUCTURE NO. 5570-471P

PHOTOGRAPHS STRUCTURE NO. 5570-471P

PHOTO #1 - LOOKING SOUTHBOUND TOWARD NATCHEZ

PHOTO #2 - EAST SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING NORTH

PHOTO #4 - TYPICAL LONGITUDINAL CRACKING OF ASPHALT WEARING

SURFACE, SOUTHBOUND LANE IN SPAN #4 SHOWN

PHOTO #5 - TYPICAL ACCUMULATION OF DEBRIS IN STRIP SEAL

EXPANSION JOINT, SOUTH ABUTMENT SHOWN

PHOTO #6 - VERTICAL CRACKING WITH EFFLORESCENCE ON

EXTERIOR FACE OF EAST CURB AT NORTH APPROACH

PHOTO #7 - TYPICAL ACCUMULATION OF DEBRIS IN CURBLINES, EAST

CURBLINE NEAR SOUTH ABUTMENT SHOWN

PHOTO #8 - TYPICAL DETERIORATION OF RELIEF JOINT SEALANT AND

ADJACENT ASPHALT PAVEMENT OVER APPROACH END OF ABUTMENT

SLAB, NORTH APPROACH SHOWN; NOTE PAVEMENT SETTLEMENT

PHOTO #9 - TYPICAL RANDOM CRACKING OF ASPHALT APPROACH

PAVEMENT, SOUTH APPROACH SHOWN

PHOTO #10 - GENERAL UNDERSIDE VIEW LOOKING SOUTH, SPAN #4

PHOTO #11 - TYPICAL ANCHOR BOLT AT NORTH ABUTMENT BENT

TOWARD CENTER OF STRUCTURE; GIRDER #3 BEARING SHOWN;

NOTE ANCHOR BOLT NUT IS LOOSE

PHOTO #12 - BROKEN ANCHOR BOLT AT BEARING #3 AT SOUTH

ABUTMENT

PHOTO #13 - TYPICAL SPALLING OF CLOSURE DIAPHRAGMS OVER

PIERS, SOUTH SIDE OF SOUTH PIER BETWEEN GIRDERS #3 AND #4

SHOWN

PHOTO #14 - TYPICAL SPALLING OF CLOSURE DIAPHRAGMS OVER

PIERS, NORTH SIDE OF PIER #2, BETWEEN GIRDERS #2 AND #3

SHOWN

PHOTO #15 - TYPICAL SPALLING OF CLOSURE DIAPHRAGMS OVER

PIERS, NORTH SIDE OF PIER #3 BETWEEN GIRDERS #1 AND #2 SHOWN

PHOTO #16 - GENERAL VIEW OF NORTH ABUTMENT

PHOTO #17 - TYPICAL VERTICAL AND HORIZONTAL CRACKING WITH

EFFLORESCENCE ON WINGWALLS, SOUTHWEST WINGWALL SHOWN;

NOTE VINE GROWTH

PHOTO #18 - CONCRETE SLOPE PROTECTION SHIFTED AWAY FROM

BOTH ABUTMENTS, NORTH ABUTMENT SHOWN; NOTE JOINT SEAL

DETERIORATED AND VEGETATION GROWTH IN JOINT

PHOTO #19 - TYPICAL VEGETATION GROWTH IN SLOPE PROTECTION

PANEL JOINTS AT SOUTH ABUTMENT, EAST SIDE SHOWN

PHOTO #20 - GENERAL VIEW OF NORTH PIER NORTH SIDE; NOTE

TYPICAL VINE GROWTH ON PIER

PHOTO #21 - TREES ENCROACHING BOTTOM OF BRIDGE NEAR SOUTH

SIDE OF PIER #2; NOTE SIMILAR AT NORTH SIDE OF PIER #1

File details come from the government source that posted it. Updated .