5570-474P3438.pdf

PDF 3 MB Posted

Attached to
Natchez Trace Parkway Federal contract opportunity
Solicitation number
693C73-20-B-000007
Issued by
Department of Transportation Federal Highway Administration

About this file

This solicitation is for a bridge preventative maintenance project on the Natchez Trace Parkway. The project consists of repairing deteriorated expansion joints, sealing asphalt pavement cracks, conducting concrete repairs, and other miscellaneous work split across multiple work schedules. The total cost of the project is estimated between $500,000 to $1,000,000. Bids from certified Small Business Concerns will be accepted, with bid documents available as of October 22, 2019 and bids due on the date specified in block 13a of the solicitation. The soliciting agency is the Department of Transportation Federal Highway Administration for work located in Hinds and Madison Counties, Mississippi. Annual representations and certifications must be completed online along with other registration requirements prior to award.

Bridge Inspection Report

View the file

Other files for this federal contract opportunity

Other files attached to Natchez Trace Parkway, newest first.
File Type Posted
Results of Bid Opening - NATR BMS FY19(1).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
5570-482P6875.pdf PDF
VETS-4212_-_Form.pdf PDF
NEPA_CE.pdf PDF
5570-472P6875.pdf PDF
5570-503P4583.pdf PDF
5570-135P2750.pdf PDF
5570-471P13750.pdf PDF
5570-499P1528.pdf PDF
Plans_-_NP-NATR_BMS_FY19(1).pdf PDF
5570-484P3438.pdf PDF
5570-501P13750.pdf PDF
5570-502P6875.pdf PDF
5570-473P4583.pdf PDF
5570-477P1964.pdf PDF
5570-500P28.pdf PDF
FP14_Eng.pdf PDF
IFB_Solicitation_-_NATR_BMS_FY19(1).pdf PDF
5570-479P1528.pdf PDF
5570-475P2750.pdf PDF
5570-498P1719.pdf PDF
Synopsis_-_NATR_BMS_FY19(1).doc DOC document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 5570-474P

COUNTY ROAD BRIDGE AT MP 99.67 INSPECTION DATE: 1/17/17

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... SLAB NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 120.0 FT (36.6 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 60.0 FT (18.3 M)

WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 37.0 FT (11.3 M)

ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 34.0 FT (10.4 M)

PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 3O10 / SKEW ANGLE: ..................... 18 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 2006 - STRUCTURE AND APPROACHES PAVED.

LOCATION

NATCHEZ TRACE PARKWAY MILE POINT: ..................... 96.70 (KM PT 155.62)

STATE: ................................. MISSISSIPPI LOCATION: 3O PROJECT SECTION.

FACILITY CARRIED: ............ NATCHEZ TRACE PARKWAY

FEATURE INTERSECTED: .. COUNTY ROAD

STRUCTURE EVALUATION SUMMARY

This continuous concrete slab bridge is in good condition overall. However, the erosion and undermining of the drop inlet at the northeast corner remains unchanged and should be repaired.

Additional problems include adhesion failure of the relief joint sealant with the asphalt pavement breaking up along the joints over the ends of the approach slabs; transverse cracking of the pavement over the ends of the abutment slabs;

a lack of joint sealant between the slope protection and the abutment breastwalls, and deteriorated sealant around the base of the columns and between slope protection panels; and an accumulation of debris in the deck expansion joints, along the curblines, and on the slope protection.

Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: M.L. AGNES, S.R. ROTH (CLARK NEXSEN)

CONDITION ASSESSMENT:

MATTHEW L. AGNES, P.E., FIELD TEAM LEADER

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 5/31/17

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-474P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D226 PRIORITY OF IMPROVEMENT

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

60.11 CLEAN AND RESEAL JOINTS BETWEEN SLOPE PROTECTION AND ABUTMENT

BREASTWALLS, AROUND PIER COLUMNS, AND BETWEEN SLOPE PROTECTION

PANELS.

222.2 CLEAN AND RESEAL RELIEF JOINTS AT APPROACHES.

222.5 FILL AND STABILIZE EROSION OF NORTHEAST SLOPE AND REPAIR UNDERMINING

OF DROP INLET.

58.2,7, 60.11

PERIODICALLY CLEAR DEBRIS AND VEGETATION GROWTH FROM DECK

EXPANSION JOINTS, CURBLINES, ABUTMENT SLOPE PROTECTION, AND SLOPE

PAVING DITCHES.

222.4 CLEAN AND SEAL TRANSVERSE CRACKING OF APPROACH PAVEMENT OVER

ENDS OF ABUTMENT SLABS.

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5570-474P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.

8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present

7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal

5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.

4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

58. DECK 7 ITEM REFERENCE AND REMARKS

G1. DECK SLAB

F2. EXPANSION JOINTS

G3. WEARING SURFACE

G4. RIDEABILITY

G5. CURBS, SIDEWALKS, AND MEDIAN

G6. PARAPETS AND/OR RAILINGS

F7. DRAINS AND DRAINAGE

N8. UTILITIES

G9. DEFLECTION AND/OR VIBRATION

N10. OTHER

59. SUPERSTRUCTURE 7

G

2. GIRDERS OR BEAMS

1. BEARING DEVICES

N

G3. ARCH(ES) OR SLAB(S)

N4. FLOOR BEAMS AND STRINGERS

N5. TRUSSES

N6. DIAPHRAGMS AND BRACING

N7. PAINT

N8. FASCIA(E)

G9. DEFLECTION AND/OR VIBRATION

G10. ALIGNMENT

N11. OTHER

60. SUBSTRUCTURE 7

58.1, 59.3 MINOR DIAGONAL CRACKING OF SLAB UNDERSIDE EXTENDING

PERPENDICULAR FROM CONSTRUCTION JOINTS IN CENTER SPAN,

SOME WITH EFFLORESCENCE. MINOR VERTICAL CRACKING WITH

EFFLORESCENCE ON SLAB SIDES OVER PIERS. MINOR

HONEYCOMBING OF SLAB UNDERSIDE; AREAS OF PATCHING OF

SLAB UNDERSIDE, LIKELY REPAIRS TO HONEYCOMBING.

58.2 MODERATE ACCUMULATION OF DEBRIS IN DECK EXPANSION

JOINTS.

58.3 MINOR LONGITUDINAL AND RANDOM CRACKING OF WEARING

SURFACE.

58.5,6 MINOR FULL DEPTH CRACKING, SOME WITH EFFLORESCENCE, AND

POPOUTS THROUGHOUT CURBS AND RAILINGS. SPOT LOCATIONS

OF EXPOSED AGGREGATE. VEHICLE SCRAPES ON EAST CURB AND

RAIL AT SOUTH APPROACH. MINOR MOWER DAMAGE AT ENDS OF

RAILINGS.

58.7 MINOR TO MODERATE ACCUMULATION OF DEBRIS WITH

VEGETATION GROWTH IN CURBLINES.

59.1 ELASTOMERIC BEARING PADS PROTRUDING OUT FROM ENDS OF

BOTH ABUTMENTS. BEARING PAD CUT OFF AT EAST END OF NORTH

ABUTMENT.

60.1 MINOR VERTICAL CRACKING OF ABUTMENT BREASTWALLS.

60.6 MINOR DIAGONAL CRACKING OF WINGWALLS AT SLAB SEATS,

SOME WITH EFFLORESCENCE. MINOR CRACKING WITH

EFFLORESCENCE ON WINGWALLS AT HORIZONTAL CONSTRUCTION

JOINTS. MINOR MOWER SCRAPES ON WINGWALLS.

ABUTMENTS

BREASTWALLS OR COLUMNS 1. G

PILE BENTS 2. N

CAPS AND/OR BEARING SEATS 3. G

BACKWALLS AND/OR BULKHEADS 4. G

FOUNDATIONS 5. N

WINGWALLS 6. G

WEEP HOLES 7. N

EXPANSION JOINTS 8. N

EROSION AND/OR SCOUR 9. G

SETTLEMENT OR DEFLECTION 10. G

SLOPE PROTECTION 11. F

OTHER 12. N

PIER(S)

WALLS AND/OR COLUMNS 13. G

PILE BENTS 14. N

CAPS AND/OR BEARING SEATS 15. G

FOUNDATIONS 16. N

EROSION AND/OR SCOUR 17. G

SETTLEMENT OR DEFLECTION 18. G

OTHER 19. N

FIELD INSPECTION REPORT STRUCTURE NO. 5570-474P

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL N

222. APPROACHES 6

OTHER 9.

ALIGNMENT 8.

SIGNS 7.

SETTLEMENT 6.

EROSION 5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

1. APPROACH SLABS

((DROP INLET))

N F N F F G G G G

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION 5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDS D.

APPROACH GUARDRAILS C.

TRANSITIONS B.

BRIDGE RAILINGSA. 1

N N N

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

60.11 MINOR TRANSVERSE AND DIAGONAL CRACKING OF SLOPE

PROTECTION. JOINT BETWEEN SLOPE PROTECTION AND

ABUTMENT BREASTWALLS UNSEALED AND OPEN 2"W. ADHESION

FAILURE OF SEALANT WITH VEGETATION GROWTH AROUND BASE

OF COLUMNS. VEGETATION GROWTH BETWEEN SLOPE

PROTECTION PANEL JOINTS.

MODERATE SPALLING OF SLOPE PROTECTION CURBS AT BOTH

ABUTMENTS IN A FEW LOCATIONS. SPALLING (10"L X 20"W X 1"D) OF

SOUTH ABUTMENT SLOPE PROTECTION AT CENTER COLUMN OF

SOUTH PIER.

MINOR TO MODERATE ACCUMULATION OF DIRT AND VEGETATION

GROWTH IN SOUTH SLOPE PROTECTION DITCH.

222.1 MINOR CRACKING OF BOTH APPROACH SLABS (NO LONGER

VISIBLE DUE TO PAVEMENT).

222.2,4 MINOR TO MODERATE TRANSVERSE AND RANDOM CRACKING OF

APPROACH PAVEMENT. MODERATE TRANSVERSE CRACKING OF

APPROACH PAVEMENT OVER APPROACH ENDS OF ABUTMENT

SLABS.

PAVEMENT SAW CUT AND SEALED AT APPROACH ENDS OF

APPROACH SLABS; ADHESION FAILURE OF SEALANT WITH

APPROACH PAVEMENT BREAKING UP ALONG JOINTS. MINOR

BULGING OF APPROACH PAVEMENT AT RELIEF JOINT IN

SHOULDERS, EXCEPT AT NORTHEAST CORNER.

222.5 EROSION (20'L X 4 W X 2'D) AT NORTHEAST CORNER OF DROP INLET

EXTENDING DOWN SLOPE WITH VOIDS BENEATH GROUND

SURFACE; DROP INLET UNDERMINED (30"L X 14"H X 27" UNDER).

222.7 TYPE 3 OBJECT MARKERS PRESENT AT ENDS OF RAILINGS.

222.9 MINOR MOWER DAMAGE TO DROP INLET AT NORTHEAST CORNER

OF STRUCTURE.

STRUCTURE LOAD RATING STRUCTURE NO. 5570-474P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 20 18 33 30

HS 36 33 60 55

TYPE 3 23 21 39 35

TYPE 3S2 32 29 54 49

TYPE 3-3 40 36 66 60

DESIGN LOADING: HS20 (MS18)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-474P

STRUCTURE IDENTIFICATION

(201) PARK: NATCHEZ TRACE PARKWAY

(202) STRUCTURE NAME: .......... COUNTY ROAD BRIDGE AT MP 99.67

(203) STRUCTURE KIND: ............ 1 - BRIDGE

(204) STRUCTURE NUMBER: ..... 5570-474P

(205) NPS REGION: .................... 4 - SOUTHEAST

(206) ROUTE CODE NUMBER: ... 0

(207) ROAD SECTION NO: .......... 474P

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?: ....... YES

(210) OPERATING UNIT: ............. RIDGELND

(211) PROJECT NO(S): ................ 3O10

(212) DRAWING NUMBERS:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY/PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR: ..

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORICAL DESIGNATION: ..

284 - MISSISSIPPI (MS)

089 - MADISON

160000000

COUNTY ROAD

NATCHEZ TRACE PARKWAY

5570474P0000000

3O PROJECT SECTION.

99.99 FT (99.99 M)

96.70 (KM PT 155.62)

N/A

3 - FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

2 - CONCRETE CONTINUOUS

01 - SLAB

60.0 FT (18.3 M)

120.0 FT (36.6 M)

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

6 - N/A

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)

(66) INVENTORY RATING: ...... 36.0 TONS (32.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 60.0 TONS (55.0 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 1/17 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-474P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 32°24'57.12" (51) CURB TO CURB WIDTH: ........... 34.0 FT (10.4 M)

(17) LONGITUDE: ......................... 90°13'04.19" (52) DECK WIDTH: ............................ 37.0 FT (11.3 M)

(19) DETOUR LENGTH: ............... 0 MI (0 KM) (32) APPR. ROADWAY WIDTH: ........ 34.0 FT (10.4 M)

(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)

(28B) LANES UNDER STRUCT: ... 02 LEFT SHOULDER: .................. 6.0 FT (1.8 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 6.0 FT (1.8 M)

(42B) SERVICE UNDER: .............. 1 - HIGHWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 210 (34) SKEW ANGLE: ............................ 18 °

(30) YEAR OF ADT: ...................... 2005 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 231 (47) TOTAL HORIZ. CLEARANCE: .... 34.0 FT (10.4 M)

(115) YEAR OF FUTURE ADT: ..... 2025 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... N RIGHT : ................................... 0.0 FT (0.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE

(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 1 - CONCRETE

DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 99.9 FT (99.9 M) (215) BRIDGE RAIL HEIGHT: ............ 2.50 FT (0.76 M)

(56) LEFT: ......................... 99.9 FT (99.9 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 16.58 FT (5.05 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL: .......................... N

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

N - Not over waterway.

1 - MAINTENANCE

D - MINOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

2006 - STRUCTURE AND APPROACHES PAVED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:90�13'04.19 http:32�24'57.12

APPENDIX STRUCTURE NO. 5570-474P

PHOTOGRAPHS STRUCTURE NO. 5570-474P

PHOTO #1 - LOOKING SOUTHBOUND TOWARD NATCHEZ

PHOTO #2 - EAST SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW

LOOKING NORTH

PHOTO #4 - TYPICAL ACCUMULATION OF

DEBRIS IN DECK EXPANSION JOINTS;

EXPANSION JOINT OVER NORTH ABUTMENT

SHOWN

PHOTO #5 - TYPICAL ACCUMULATION OF

DEBRIS WITH VEGETATION GROWTH IN

CURBLINES; EAST CURBLINE NEAR SOUTH

ABUTMENT SHOWN

PHOTO #6 - TYPICAL TRANSVERSE CRACKING

OF PAVEMENT OVER APPROACH ENDS OF

ABUTMENT SLABS; NORTH APPROACH

SHOWN

PHOTO #7 - TYPICAL ADHESION FAILURE OF

SEALANT IN RELIEF JOINTS WITH ASPHALT

PAVEMENT BREAKING UP ALONG JOINTS;

SOUTH APPROACH SHOWN

PHOTO #8 - CLOSE-UP OF PREVIOUS PHOTO

PHOTO #9 - EROSION WITH UNDERMINING OF DROP INLET AT

NORTHEAST CORNER OF STRUCTURE

PHOTO #10 - GENERAL UNDERSIDE VIEW LOOKING NORTH, CENTER

SPAN

PHOTO #11 - TYPICAL CRACKING OF SLAB UNDERSIDE EXTENDING

PERPENDICULAR TO CONSTRUCTION JOINTS IN CENTER SPAN, SOME

WITH EFFLORESCENCE; SOUTH CONSTRUCTION JOINT SHOWN

PHOTO #12 - TYPICAL VERTICAL CRACKING WITH EFFLORESCENCE

ON SLAB SIDES OVER PIERS; WEST SIDE OVER NORTH PIER SHOWN

PHOTO #13 - TYPICAL PROTRUDING ELASTOMERIC BEARING PAD AT

ENDS OF ABUTMENTS; WEST END OF NORTH ABUTMENT SHOWN

PHOTO #14 - PROTRUDING ELASTOMERIC BEARING PAD CUT OFF AT

EAST END OF NORTH ABUTMENT

PHOTO #15 - GENERAL VIEW OF SOUTH ABUTMENT

PHOTO #16 - TYPICAL CRACKING WITH EFFLORESCENCE ON

WINGWALLS AT SLAB SEATS AND ALONG HORIZONTAL

CONSTRUCTION JOINTS; NORTHWEST WINGWALL SHOWN

PHOTO #17 - TYPICAL UNSEALED JOINT BETWEEN SLOPE

PROTECTION AND ABUTMENT BREASTWALLS; SOUTH ABUTMENT

SHOWN

PHOTO #18 - TYPICAL VEGETATION GROWTH IN SLOPE PROTECTION

JOINTS AND AT BASE OF COLUMNS; EAST SIDE OF NORTH SLOPE

PROTECTION SHOWN

PHOTO #19 - SPALLING OF SOUTH SLOPE PROTECTION AT CENTER

COLUMN; ALSO NOTE TYPICAL DETERIORATION OF JOINT SEALANT

PHOTO #20 - TYPICAL SPALLING OF SLOPE PROTECTION CURBS; EAST

SIDE AT TOP OF SOUTH ABUTMENT SLOPE PROTECTION SHOWN

PHOTO #21 - GENERAL VIEW OF SOUTH PIER, NORTH SIDE