QA_10-08-21.pdf
PDF 193 KB Posted
- Solicitation number
- 69056721B000016
About this file
This document contains questions and answers regarding solicitation number 69056721B000016 from the Department of Transportation Federal Highway Administration for construction services related to the Historic Columbia River Highway State Trail. Key details include that the solicitation is a small business set-aside for a project requiring concrete work including a precast arch culvert, micropiles, pavement markings, asphalt, concrete barriers, and rockfall protection. The response date was amended multiple times with the final response due on October 8, 2021. Clarification was provided around material requirements, sequencing of work, certification requirements, and traffic control plans.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR DOT CRGNSA 100(6)
Historic Columbia River Highway State Trail, Viento to Mitchell Point Crossing
# General Technical Question Answer Date
1 X Please confirm this project was intended to be Small Business Set‐Aside.
Yes. This is a Small‐Business Set‐Aside Project according to the top right box on the first page of the solicitation, and FAR Clause 52.219‐6.
9/13/21
2 X
The documents posted to sam on this project list bids due 9/30, but the sam website itself lists 10/1. When are bids due by on this project?
Will be addressed under Amendment A001 9/16/21
3 X
Please clarify that the Concrete coloring agent section 550.02 does not apply the to the Mitchell Creek Bridge Arch Culvert.
Listing the concrete coloring agent in section 550.02 is not meant to indicate that the coloring agent applies to the Mitchell Creek Bridge Arch Culvert. Per 552.03, Mitchell Creek Bridge Arch Culvert is not among the elements that are specified to have concrete coloring agent.
9/21/21
4 X
Please clarify that the Plant casting the Mitchell Creek Bridge Arch Culvert does not require the B‐4 Prestressed Deflected Strand Bridge Beams certification in section 552.11 (b)(6)(a). Precast Arch Structures are not Prestressed and most facilities do not cast both Precast Arches and Prestressed Structures and therefore do not seek that certification.
The Plant Casting requirement in Section 552.11(b)(6)(a) applies to the Perham Creek bridge. For the Mitchell Creek Bridge Arch Culvert, use a precast concrete manufacturing plant certified by the Precast/Prestressed Concrete Institute Plant Certification Program with a “B‐1 Precast Bridge Products (No Prestressing Reinforcement)” certification
9/21/21
Check General or Technical
5 X
Please clarify the requirements for Assembly of each superstructure and substructures prior to shipment to site in Section 552.11 (b)(6)(c) does not apply to the Mitchell Creek Bridge Arch Structure. Precast arch elements are cast on their sides and not fully rotated until set on their foundation. The Butt joints utilized for CON/SPANs are not typically a fit up issue in the field.
Section 552.11(b)(6)(c) requires verification that the prefabricated elements will fit‐up and align properly before shipping from the precast facility. This section indicates that assembly in the yard would be a suitable way for performing such verification, but this is not required.
9/21/21
6 X
Please provide the loading applied to the end arch elements by the cast in place concrete headwalls for the Mitchell Creek Bridge Arch Structure
The figure below provides the loading due to the cast‐in‐place concrete headwall. It is assumed that the weight of the masonry veneer will be carried through the headwall directly to the abutments once it is cured, and not load the precast arch culvert.
9/21/21
7 X
In lieu of casting bolts in the end pieces of the Mitchell Creek Bridge Arch Structures, can inserts be provided so that hook bolts or rebar can be field installed
Substitution of a form saver , or insert, that fully couples and fully develops an embedded #4 reinforcing bar with a 90 degree hook in the precast culvert concrete and provides adequate concrete cover, would be accepted. The culvert shop drawings would need to detail the insert and adequate reinforcing development.
9/21/21
8 X
Hi, Are the rebar lists on pages HM.09, HM.10, HP.14, HP.15, HP.16, HP.17 and HP.18 supposed to be filled out or where do we find the dimensions?
FP‐14 Sub‐section 554.03: it is the responsibility of the contractor to submit order list and bending diagrams. Please bid accordingly. 9/21/21
9 X
Revised Questions
Q1: FAR 52.225‐12 – Please clarify if this contract will be subject to Buy American requirements.
Q2: We request determination of applicability.
This will be addressed under Amendment A002.
Revised Responses
Q1 A1: Yes, this contract is subject to Buy American requirements as the Buy American clauses will be put back into the solicitation under Amendment A005.
Q2 A2: See A1 above. Please clarify your question/request as we do not understand what you’re requesting/asking.
9/23/21
Revised Response 10/7/21
Revised Response 2 10/8/21
10 X
Item No. A0480 20304‐1000 Removal of Structures & Obstructions (Contaminated Soil).
Can measurement and payment be more delineated or can this item be measured by the ton of disposed soil?
Unit of payment for Item No. A0480 20304‐1000 Removal of Structures & Obstructions (Contaminated Soil) is LUMP SUM.
Please bid accordingly.
9/23/21
11 X
The Solicitation , Offer and Award page A‐3 (13.)
says the bid is due 9/30/22021 at 1400 as well as the top of the INVITATION FOR BIDS. The General Information Section on beta.sam says Offers Due: Oct 1, 2021 2:00 PM PDT. Please clarify the date this bid is due.
This will be addressed under Amendment A002. 9/23/21
12 X Can this bid be postponed for two weeks?
No, but the bid opening date will be changed under Amendment A002.
9/23/21
13 X Would you please provide the unfactored micropile design loads for the Perham and Mitchell Bridges?
This will be addressed under Amendment A003. 9/27/21
14 X
Sheet numbers HP.4 and HM.4. The minimum bond length diameter is not specified. Would you provide the minimum bond length diameter?
This will be addressed under Amendment A003. 9/27/21
15 X
Sheet numbers HP.4 and HM.4. The top plate detail shows it being welded to the permanent casing. The permanent casing is specified as API N‐80 casing. API N‐80 casing is not a prequalified material by the AWS due to the materials high carbon content and difficulty in welding. Can the detail be revised to remove the welding requirement?
This will be addressed under Amendment A003. 9/27/21
16 X
Are the areas indicated on this solicitation accessible or are there gates that control the areas? I suspect since there are no tours that it is all public access, but would like confirmation before mobilizing for site walks.
The Notice to Bidders does not indicate there are any locked gates, but there may be other contracts being performed during your planned site visit, so follow the requirements of Subsection
104.06 when performing site visits within the project limits.
9/27/21
17 X
Per bid item Y1140, Concrete Headwall, the bid item quantity is 2 each. Does the measure and pay for this bid item include the concrete headwalls at Mitchell Creek Bridge complete including the cubic yards of concrete? Or are the cubic yards of concrete for these headwalls paid under bid item Y0780, Structural Concrete Class A (AE) (Mitchell Creek Bridge)?
Bid Item Y1140 will be removed under Amendment A003. 9/27/21
18 X Can you tell me if there is a plan holder list available for this job?
Obtain the registered vendors list (aka planholders list) for this project as follows. Register in sam.gov and link your entity to your registration. After doing this, log into sam.gov to find the interested vendors list under this announcement. Contact the Federal Service Help Desk if you experience further issues.
9/27/21
19 X
Also do you know what size the asphalt rock is?
It says type 1, 4” depth but not a size. The specs say binder will be 70‐22ER and 64‐22, but on the plans I don’t see it called out any ware. Can you help me?
Asphalt concrete aggregate requirements for work under Section 401 are specified under Subsection 703.07 (See FP‐14 Subsection 401.02); and asphalt concrete aggregate requirements for work under Section 403 are specified under Subsection 403.02(a).
9/27/21
20 X
What are the steel escalation clauses considering the current supply chain issues, extreme raw materials cost increases and the completion dates of 2023 and 2024?
This solicitation does not have any steel escalation clauses.
Please bid accordingly.
9/28/21
21 X
The rockfall protection areas are only aggregated on sheet K.1. Could the area of the individual rockfall protection systems be provided for proper material take‐off?
We will not be providing a breakdown of the quantities shown on Sheet K.1 at this time. Please bid accordingly.
9/29/21
22 X Please outline what Type M is. I’m not aware of any Type M that is outlined in FP‐14 Provisions.
See Section 634 in the Invitation for Bids posted on sam.gov. 10/1/21
23 X
The following is all I found on Pavement Markings and there is no Type M. Please advise.
634.01 This work consists of applying paint, markings, and
markers on finished pavement.
Pavement markings are designated as follows:
Type A – Solventborne traffic paint with Type 1 glass beads;
Type B – Waterborne traffic paint with Type 1 glass beads;
Type C – High-build waterborne traffic paint with Type 1 and Type 3 glass beads;
Type D – Epoxy markings with Type 1 glass beads;
Type E – Epoxy markings with Type 1 and Type 3 glass beads;
Type H – Thermoplastic markings with Type 1 glass beads;
Type I – Thermoplastic markings with Type 1 and Type 3 glass beads;
Type J – Preformed pavement marking tape; or Type K – Nonreflectorized markings.
You have referenced Subsection 634.01 of FP‐14.
1.) Go to https://sam.gov/opp/9c22fabaf5f7480bb3adf17b158ad9e5/vie w 2.) Download the fie IFB_69056721B000016.pdf 3.) Search the downloaded document for Section 634.
10/1/21
24 X Regarding the strike out of FAR 52.225‐12 under Amendment A002 concerning steel, what FAR clause replaces it?
Amendment A002 has removed the Buy American clauses without replacement.
Revised Response: We will be adding the Buy American clauses back into the solicitation under Amendment A005.
10/5/21 Revised
Response 10/7/21
25 X Regarding the strike out of FAR 52.225‐12 under Amendment A002, is foreign or domestic steel required?
Amendment A002 removes the Buy American requirements from the solicitation documents. Please provide materials according to the solicitation documents.
Revised Response: We will be adding the Buy American clauses back into the solicitation under Amendment A005.
10/5/21 Revised
Response 10/7/21
26 X
There are now no Buy American contract clauses in section C meaning all foreign steel is acceptable. Your combined answers, the Buy American clauses 52.225‐11 and 52.225‐12 are struck out combined with “Please provide materials according to the solicitation documents “ , means any steel including Chinese steel is acceptable.
We will be adding the Buy American clauses back into the solicitation under Amendment A005.
10/7/21
27 X
Can you help me understand the difference between Section B ‐ FAR Solicitation Provisions and Section C – FAR Contract Clauses. I am under the impression that the contract clauses are specific a project and the Solicitation Provisions are just for information.
Section B of the Invitation for Bids contain FAR Provisions that are applicable before award during the solicitation; while Section C of the Invitation for Bids contain FAR Clauses that are applicable before award during the solicitation, and after award.
28 X
Plan Sheet HM.1 (see attached), calls to temporary shore excavation to construct deep footings and place Class 5 riprap at Abutments 1 & 2, with a portion of this shoring required underneath the precast arch. This would require the following sequencing of work: 1.
Install shoring; 2. Excavate; 3. Install Footings and Stemwalls; 4. Set Precast Culvert; 5. Backfill and Place Riprap; 6. Remove temporary shoring;
hence, Placement of Class 5 Riprap would be impossible in these sections as the precast arch has to be installed prior to the riprap and there would be no headroom for equipment to allow for installation of this riprap underneath the arch and no way to install the riprap all the way to the bottom of the arch from the side.
The solicitation does not require a specific sequencing of work, nor does it contain requirements for setting the Precast Culvert before backfilling and placing riprap. Please determine your methods of operations and bid accordingly.
29 X
Plan Sheet HM.1 (see attached), calls to temporary shore excavation to construct deep footings and place Class 5 riprap at Abutments 1 & 2, with a portion of this shoring required underneath the precast arch. This would require the following sequencing of work: 1. Install shoring; 2. Excavate; 3.
Install Footings and Stemwalls; 4. Set Precast Culvert;
5. Backfill and Place Riprap; 6. Remove temporary shoring; hence, the temporary shoring cannot be removed once the precast arch is set. This shoring is required but it would not be able to be removed, therefore it would become permanent shoring.
Permanent shoring would require quite a bit more design work and would likely consist of sheetpile that would remain. The plans specifically call this shoring out as temporary so the contractor would be required to remove it, which is impossible once the arch is placed. There is no way of sequencing so that the riprap and shoring are removed prior to the placement of the arch as the riprap will bear against the bottom of the arch. With the depth of the material to be retained, the only real option for shoring this area is pile with lagging or a sheetpile wall. Neither of these options could be removed once the arch is set.
The “temporary” designation for shoring shown on the plans will be removed under Amendment A005. FP‐14 Subsection 208.03 specifies how shoring is to be removed. Please determine your methods of operations and bid accordingly.
30 X
SCR Section 552.11(6) states the supplier for the precast members must have a Plant Certification meeting “B‐4 Prestressed Deflected‐Strand Bridge Beams (Superstructure)”. It also states the Contractor is required to use the same precast plant for the fabrication of all precast elements used in the bridge system. This is an issue because certain aspects of the bridge system that are required to be precast (pilasters, bridge rail, corbels) will not be quoted by suppliers that would provide the Prestressed Slabs and/or Precast Arch Culvert. In speaking with suppliers of the slabs & arch culvert, they won’t provide quotes for the pilasters, corbel or the rail. This SCR specifically states all precast elements are to be from the same precast plant.
There are no prestressing elements in the pilasters, corbels or bridge rail that are to be precast so that certification would not apply. Can these specifications be changed to items that are only to be prestressed? Some of the precasting might have to be done in‐house, as trying to find a supplier that has the manpower and space available is proving difficult.
Please advise.
This will be addressed under Amendment A005 10/8/21
31 X
Plan Sheet I.4 shows needing 6,900 LF of Temp.
Barrier, Reflectorized, Secured. This is part of the Stage II Traffic Control Configuration which would be paid for under Schedule X. Bid Item X1900 is for Temporary Concrete Barrier (Unsecured) for 6,900 LF and X1920 is for Temporary Concrete Barrier (Secured). The plans indicate that the 6,900 needs to be secured but the bid item quantity for this work is unsecured. Please advise.
This will be addressed under Amendment A005. 10/8/21
32 X
Plan Sheet N.A‐1 under Project Description No.
4, 5 and E show Alternates A, B and C. There are no places in the bidding documents to bid these alternates. Is the contractor supposed to bid all the alternates in the base bid or leave the alternates out of the bid?
This will be addressed under Amendment A005. 10/8/21
33 X
I just wanted to verify that all new barrier is supposed to be secured. Plan Sheet C.5 shows the “Typical Shoulder Widening for Barrier or Guardrail Placement on I‐84”, this details indicates 1’ of slide on the backside of the barrier. Per RD500 a minimum of 2’ is required for barrier to be unsecured. Please verify that with only 1’ of slide, all new permanent barrier to be installed is required to be secured.
This will be addressed under Amendment A005. 10/8/21