BPA-3 Line_VA.pdf
PDF 124 KB Posted
- Solicitation number
- 69056721B000016
About this file
This document contains a physical data report and related federal contract opportunity solicitation. The physical data report provides technical details for a vertical alignment review of a segment of the Historic Columbia River Highway State Trail project in Oregon. It includes station elevations, element types, lengths, entrance and exit grades, and other engineering specifications.
The related federal contract opportunity is solicitation number 69056721B000016 from the Department of Transportation Federal Highway Administration seeking construction services for the OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail project. The solicitation description references an attached invitation for bid. The response is due by an unspecified date with award also to occur at an unspecified future date. Pricing, additional terms, set-asides or incumbent are not discussed.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHYSICAL DATA
for
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PROJECT
OR DOT CRGNSA 100(6)
Historic Columbia River Highway State Trail, Viento to Mitchell Point Crossing
Vertical Alignment BPA-3 Line
Vertical Alignment Review Report
Report Created: Thursday, April 15, 2021 Time: 12:29:29 AM
Project: Default
Description:
File Name:
P:\F\FHAX00000250\0400CAD\RH\CHKBRD\DJI\DESIGN INFO_V2M\PE HOLD
FILE_Electronic Data\OR1006_HA_ALG.dgn
Last Revised:
4/15/2021 00:25:44
Note: All units in this report are in feet unless specified otherwise.
Horizontal Alignment: BPA-3 Access
Horizontal Description:
Horizontal Style: Alignment\Baseline - Access
Vertical Alignment: v_BPA Access_426+25
Vertical Description:
Vertical Style: Alignment\Baseline - Access
Station Elevation
Element: Linear
START 10+20.556 144.165
VPC 10+37.157 141.192
Tangent Grade: -17.90621%
Tangent Length: 16.601
Element: Symmetrical Parabola
VPC 10+37.157 141.192
VPI 10+52.157 138.506
VPT 10+67.157 139.671
VLP 10+58.083 139.319
Length: 30.000
Entrance Grade: -17.90621%
Exit Grade: 7.76534% r = (g2 - g1) / L: 85.572
K = l / (g2 - g1): 1.169
Middle Ordinate: 0.963
Element: Linear
VPT 10+67.157 139.671
VPC 10+70.806 139.954
Tangent Grade: 7.76534%
Tangent Length: 3.649
Element: Symmetrical Parabola
VPC 10+70.806 139.954
Page 1 of 2Vertical Alignment Review Report
4/15/2021file:///C:/Users/dji/AppData/Local/Temp/RPTs1gvmkvm.html
VPI 10+79.806 140.653
VPT 10+88.806 140.088
VHP 10+80.756 140.341
Length: 18.000
Entrance Grade: 7.76534%
Exit Grade: -6.28347% r = (g2 - g1) / L: -78.049
K = l / (g2 - g1): 1.281
Middle Ordinate: -0.316
Element: Linear
VPT 10+88.806 140.088
VPI 11+00.000 139.384
Tangent Grade: -6.28347%
Tangent Length: 11.194
Element: Linear
VPI 11+00.000 139.384
END 11+34.605 137.729
Tangent Grade: -4.78525%
Tangent Length: 34.605
Page 2 of 2Vertical Alignment Review Report
4/15/2021file:///C:/Users/dji/AppData/Local/Temp/RPTs1gvmkvm.html
File details come from the government source that posted it. Updated .