OR DOT CRGNSA 100(6)_Earthwork Vol Report_I84 Shldr Widening.pdf

PDF 141 KB Posted

Attached to
OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Solicitation number
69056721B000016
Issued by

About this file

This document contains an earthwork volume report and related federal contract opportunity for shoulder widening work on I-84 in Oregon. The report provides cut and fill volume calculations for widening shoulders between mile markers 601+00 and 670+90, identifying quantities in cubic yards. The related solicitation is issued by the Federal Highway Administration through the Oregon Department of Transportation for contract number OR DOT CRGNSA 100(6) involving work on the Historic Columbia River Highway State Trail. Responses are due under solicitation number 69056721B000016 for shoulder widening and other work along sections of the trail running parallel to I-84.

View the file

Other files

File Type Posted
Tabulation of Bids.pdf PDF
BidSummary.pdf PDF
QA2_10-13-21.pdf PDF
Page F-136.pdf PDF
QA_10-13-21.pdf PDF
Amendment A006.pdf PDF
Sheets I.5 through I.7.pdf PDF
Sheets N.A-7 through N.A-8.pdf PDF
Sheets N.A-3 through N.A-5.pdf PDF
QA_10-12-21.pdf PDF
Amendment A005.pdf PDF
QA_10-08-21.pdf PDF
QA_10-07-21.pdf PDF
Amendmentt. A004.pdf PDF
Amendment A003.pdf PDF
QA_09-29-21.pdf PDF
QA_09-28-21.pdf PDF
QA_09-27-21.pdf PDF
Amendment A002.pdf PDF
QA_09-23-21.pdf PDF
HB Line_HA.pdf PDF
BPA-2 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Govt-Obtained DEQ Sanitary Sewer Permit.pdf PDF
V Line_HA.pdf PDF
K20676_Alder Slope Rockfall Criteria Memo.pdf PDF
OR DOT CRGNSA 100(6)_Viento Hazmat Testing Memo.pdf PDF
PP6 Line_HA.pdf PDF
BPA-2 Line_VA.pdf PDF
Viento_to_Mitchell_Pt_CompiledESCP_final.pdf PDF
PP5 Line_HA.pdf PDF
Trail Mainline_VA.pdf PDF
PP1 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_Trail Mainline.pdf PDF
BPA-1 Line_HA.pdf PDF
M Line_VA.pdf PDF
BPA-3 Line_VA.pdf PDF
BPA-3 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Geotechnical Report for Bridges.pdf PDF
OR DOT CRGNSA 100(6)_Earthwork Volumes_V and M Line.pdf PDF
M Line_HA.pdf PDF
V Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_M Line.pdf PDF
PP2 Line_HA.pdf PDF
HB Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Earthwork Vol Report_Mainline Trail.pdf PDF
PP3 Line_HA.pdf PDF
PP7 Line_HA.pdf PDF
BPA-1 Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_V Line.pdf PDF
PP4 Line_HA.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I D

HIGHWAY STATE TRAIL,

HISTORIC COLUMBIA RIVER

OR DOT CRGNSA 100(6)

VIENTO TO MITCHELL POINT CROSSING

100% FINAL EARTHWORK

VOLUME REPORT

I-84 Shoulder Widening ("L" Line)

Base

Cross Section Set Name: I84 Const CL Option X

Alignment Name: I84 Const CL

Input Grid Factor:

Baseline

Station Cut Fill Cut Fill

Volume (CuFt) Volume (CuFt) Base 436.54 11.70

601+00.00 0 0 X 360.64 3.10

601+10.00 0 0

601+20.00 0 0

601+30.00 0 0

601+40.00 73.531 0

601+50.00 136.676 0

601+60.00 123.164 0

601+70.00 129.895 0

601+80.00 135.605 0

601+90.00 134.211 0

602+00.00 129.64 26.436

Cut Vol (CUYD) Fill Vol (CUYD)

31.95 0.98

605+85.00 0 0

605+90.00 50.184 7.218

606+00.00 140.85 2.513

606+10.00 138.074 0

606+20.00 123.595 0

606+30.00 107.565 0

606+40.00 104.231 0

606+50.00 110.674 0

606+60.00 111.84 0

606+70.00 117.264 0

606+80.00 123.551 0

606+90.00 130.789 0

607+00.00 145.14 0

607+10.00 144.474 0

607+20.00 136.365 0

607+30.00 128.332 0

607+40.00 117.262 0

607+50.00 108.165 0

607+60.00 110.318 0

607+70.00 108.665 0

607+80.00 113.566 0

607+90.00 127.402 0

608+00.00 131.633 0

608+10.00 134.023 0

608+20.00 127.666 0

608+30.00 118.94 0

608+40.00 116.958 0

608+50.00 123.692 0

608+60.00 133.422 0

SHEET D.4

End Area Volume Report

Report Created: 2/8/2021

Time: 3:14pm

All units in this report are in feet, square feet and cubic feet unless specified otherwise. The end-area earthwork calculations only account for shoulder widening of I-84 between the sections of the trail that run parallel to I-84

608+70.00 138.386 0

608+80.00 137.695 0

608+90.00 135.079 0

609+00.00 125.069 0

609+10.00 126.015 1.713

613+66.00 0 0

613+70.00 49.142 48.947

613+80.00 171.934 50.306

613+90.00 203.705 1.552

614+00.00 224.987 0

614+10.00 209.536 0

614+20.00 196.627 0

614+30.00 184.424 0

614+40.00 171.819 0

614+50.00 163.271 0

614+60.00 160.424 0

614+70.00 159.16 0

614+80.00 156.699 0

614+90.00 151.023 0

615+00.00 140.879 0

615+10.00 131.616 0

615+20.00 128.494 0

Cut Vol (CUYD) Fill Vol (CUYD)

246.32 4.16

615+30.00 129.989 0

615+40.00 127.969 0

615+50.00 119.498 0

615+60.00 114.192 0

615+70.00 112.303 0

615+80.00 112.489 0

615+90.00 112.908 0

616+00.00 110.822 0

616+10.00 109.491 0

616+20.00 112.184 0

616+30.00 117.544 0

616+40.00 89.003 177.203

621+90.00 0 0

622+00.00 224.147 0

622+10.00 213.294 0

622+20.00 191.935 0

622+30.00 168.838 0

622+40.00 154.235 0

622+50.00 143.792 0

622+60.00 134.238 0

622+70.00 126.485 0

622+80.00 116.26 0

622+90.00 107.426 0

623+00.00 101.618 0

623+10.00 100.241 0

623+20.00 100.892 0

623+30.00 99.207 0

623+40.00 94.304 0

623+50.00 98.325 0

623+60.00 108.908 0

623+70.00 98.925 0

623+80.00 81.587 0

623+90.00 90.37 0

624+00.00 108.998 0

624+10.00 114.389 0

624+20.00 126.378 0

SHEET D.5

Cut Vol (CUYD) Fill Vol (CUYD)

158.27 6.56

624+30.00 129.313 0

624+40.00 114.819 0

624+50.00 105.934 0

624+60.00 91.782 0

624+70.00 96.194 0

624+80.00 108.915 0

624+90.00 103.532 0

625+00.00 100.699 0

625+10.00 101.773 0

625+20.00 100.58 0

625+30.00 103.475 0

625+40.00 103.129 0

625+50.00 110.201 0

625+60.00 113.142 2.817

625+70.00 106.659 63.462

638+20.00 0 0

638+30.00 136.194 0.012

638+40.00 163.842 0

638+50.00 151.067 0

638+60.00 135.471 0

Cut Vol (CUYD) Fill Vol (CUYD)

80.62 2.46

638+70.00 114.342 0

638+80.00 110.964 0

638+90.00 105.042 0

639+00.00 109.611 0

639+10.00 121.044 0

639+20.00 118.415 0

639+30.00 115.82 0

639+40.00 105.201 0

639+50.00 100.776 0

639+60.00 102.575 0

639+70.00 92.817 0

639+80.00 98.661 0

639+90.00 113.909 0

640+00.00 117.465 0

640+10.00 120.304 0

640+20.00 122.293 0

640+30.00 124.247 0

640+40.00 126.937 0

640+50.00 130.895 0

640+60.00 130.749 0

640+70.00 132.156 0

640+80.00 142.722 0

640+90.00 148.381 0

641+00.00 138.318 0

641+10.00 130.728 0

641+20.00 129.007 0

641+30.00 129.747 0

641+40.00 132.494 0

641+50.00 121.62 0

641+60.00 121.394 0

641+70.00 134.714 0

641+80.00 141.924 0

641+90.00 135.735 0

642+00.00 63.31 0

642+10.00 0 0

642+20.00 0 0

SHEET D.6

SHEET D.7

642+30.00 0 0

642+40.00 0 0

642+50.00 0 0

642+60.00 0 0

642+70.00 0 0

642+80.00 0 0

642+90.00 0 0

643+00.00 1.59 0

643+10.00 1.956 0

643+20.00 0.365 0

643+30.00 0 0

643+40.00 0 0

643+50.00 0 0

643+60.00 0 0

643+70.00 0 0

643+80.00 0 0

643+90.00 0 0

644+00.00 0 0

644+10.00 0 0

644+20.00 0 0

644+30.00 0 0

644+40.00 0 0

644+50.00 0 0

644+60.00 0 0

644+70.00 0 0

644+80.00 0 0

644+90.00 99.593 17.479

Cut Vol (CUYD) Fill Vol (CUYD)

155.10 0.65

660+90.00 0 0

661+00.00 156.715 0

661+10.00 144.962 0

661+20.00 134.576 0

661+30.00 122.535 0

661+40.00 116.072 0

661+50.00 109.281 0

661+60.00 112.86 0

661+70.00 111.282 0

661+80.00 104.832 0

661+90.00 115.245 0

662+00.00 130.774 0

662+10.00 141.081 0

662+20.00 147.938 0

662+30.00 156.956 0

662+40.00 81.321 0

662+50.00 0 0

Cut Vol (CUYD) Fill Vol (CUYD)

151.0384252 0.671347051

670+20.00 0 0

670+30.00 95.326 0

670+40.00 199.94 0

670+50.00 213.651 0

670+60.00 212.503 0

670+70.00 200.084 0

670+80.00 194.894 0

670+90.00 214.004 0

671+00.00 155.937 0

Cut Vol (CUYD) Fill Vol (CUYD)

55.050 0.000

SHEET D.10

SHEET D.8