Page F-136.pdf
PDF 164 KB Posted
- Solicitation number
- 69056721B000016
About this file
This document contains special contract requirements for Oregon Department of Transportation project OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail, Viento to Mitchell Point Crossing. The project requires treatment of galvanized steel and painting of wood sign posts and aluminum sign backs used for temporary construction signs visible from I-84 for over 14 days, according to specifications. Roll-up signs and supports are exempt from these surface treatment and painting requirements. The related federal contract opportunity is solicitation number 69056721B000016 for the same OR DOT project for the Historic Columbia River Highway State Trail. The solicitation type is an Invitation for Bid issued by the Department of Transportation Federal Highway Administration.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F-136 DIVISION 600
Section 635. — TEMPORARY TRAFFIC CONTROL
11/12/20–FP14
Description
635.01 Delete the first paragraph and substitute the following:
This work consists of providing temporary traffic control measures (TCM) and furnishing, installing, moving, operating, maintaining, relocating, inspecting and removing temporary traffic control devices (TCD) and services as ordered for the control and protection of public traffic throughout the project area according the Project plans, the traffic control plan (TCP) for the Project, or as directed. This work also includes providing the services of a Traffic Control Supervisor.
Material
635.02 Amend as follows:
Delete the following from the material list:
Sign panels 633.05 Sign posts 633.04
Add the following to the material list:
Painting 563 Sign hardware 718.06 Sign panels 718.03 Sign posts 718.04
Construction Requirements
635.04 General. Delete the text of this Subsection and substitute Add the following:
For temporary construction signs and temporary sign supports used on this project that are visible from I-84 for more than 14 days, perform the following work. Roll-up signs and roll-up sign supports are exempt from these requirements
(j)(a) Treat galvanized steel materials for construction signs and flag board materials with weathering agent according to Section 563.
(k)(b) Paint wood sign posts with a paint that meets the requirements of Subsection 719.15(a).
Apply primer and two finish coats according to the manufacturer’s recommendations.
(l)(c) Paint the backs of aluminum signs with a paint that meets the requirements of Subsection
719.13. Apply primer and two coats of flat finish paint according to Section 563.
Revised by Amendment A002
Special Contract Requirements Project: OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail, Viento to Mitchell Point Crossing
DIGITALLY SIGNED Date: 2021.09.16 17:06:17-07'00'
File details come from the government source that posted it. Updated .