This document is an amendment to a solicitation for construction services related to a federal highway project. The amendment revises the bid opening date from September 30, 2021 to October 7, 2021. It also removes two items from the bid schedule and deletes certain FAR provisions and clauses. The solicitation is for the OR DOT CRGNSA 100(6) project to construct portions of the Historic Columbia River Highway State Trail from Viento to Mitchell Point Crossing. The solicitation is a total small business set-aside issued by the Federal Highway Administration. Bidders are required to submit revised bid schedule pages and other revisions in accordance with the amendment.

View the file

Other files

File Type Posted
Tabulation of Bids.pdf PDF
BidSummary.pdf PDF
QA2_10-13-21.pdf PDF
Page F-136.pdf PDF
QA_10-13-21.pdf PDF
Amendment A006.pdf PDF
Sheets I.5 through I.7.pdf PDF
Sheets N.A-7 through N.A-8.pdf PDF
Sheets N.A-3 through N.A-5.pdf PDF
QA_10-12-21.pdf PDF
Amendment A005.pdf PDF
QA_10-08-21.pdf PDF
QA_10-07-21.pdf PDF
Amendmentt. A004.pdf PDF
Amendment A003.pdf PDF
QA_09-29-21.pdf PDF
QA_09-28-21.pdf PDF
QA_09-27-21.pdf PDF
QA_09-23-21.pdf PDF
HB Line_HA.pdf PDF
BPA-2 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Govt-Obtained DEQ Sanitary Sewer Permit.pdf PDF
OR DOT CRGNSA 100(6)_Earthwork Vol Report_I84 Shldr Widening.pdf PDF
V Line_HA.pdf PDF
K20676_Alder Slope Rockfall Criteria Memo.pdf PDF
OR DOT CRGNSA 100(6)_Viento Hazmat Testing Memo.pdf PDF
PP6 Line_HA.pdf PDF
BPA-2 Line_VA.pdf PDF
Viento_to_Mitchell_Pt_CompiledESCP_final.pdf PDF
PP5 Line_HA.pdf PDF
Trail Mainline_VA.pdf PDF
PP1 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_Trail Mainline.pdf PDF
BPA-1 Line_HA.pdf PDF
M Line_VA.pdf PDF
BPA-3 Line_VA.pdf PDF
BPA-3 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Geotechnical Report for Bridges.pdf PDF
OR DOT CRGNSA 100(6)_Earthwork Volumes_V and M Line.pdf PDF
M Line_HA.pdf PDF
V Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_M Line.pdf PDF
PP2 Line_HA.pdf PDF
HB Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Earthwork Vol Report_Mainline Trail.pdf PDF
PP3 Line_HA.pdf PDF
PP7 Line_HA.pdf PDF
BPA-1 Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_V Line.pdf PDF
PP4 Line_HA.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 09-23-2021 N/A See Box 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056721B000016

9B. DATED (SEE ITEM 11)

09/02/2021

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(_X_ ) is extended, ( ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail, Viento to Mitchell Point Crossing

See page 2.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A002, dated 09-24-2021 OR DOT CRGNSA 100(6) Solicitation No. 69056721B000016 Historic Columbia River Highway State Trail, Page 2 Viento to Mitchell Point Crossing

REVISIONS ARE AS FOLLOWS:

INVITATION FOR BIDS

IFB Page 1, Invitation for Bids. Revises bid opening date.

SF 1442, SOLICITATION, OFFER, AND AWARD

Page A-3, Block 13A. Revises bid opening date from 09-30-2021 to 10-07-2021.

BID SCHEDULE

Pages A-7 through A-41. Revises Bid Schedule to remove Item Nos. A2580 and X1540.

CONTRACT CLAUSES

SOLICITATION PROVISIONS

Pages B-9 through B-11. Deletes FAR Provision 52.225-12, Notice of Buy American Requirement - Construction Materials under Trade Agreements (May 2014); and FAR Provision 52.225-12, Notice of Buy American Requirement - Construction Materials under Trade Agreements (May 2014) Alternate II (May 2014).

CONTRACT CLAUSES

Pages C-67 through C-71. Deletes FAR Clause 52.225-11, Buy American – Construction Materials under Trade Agreements (Jan 2021).

SPECIAL CONTRACT REQUIREMENTS

Page F-136, Subsection 635.04, General. Revises requirements.

Notice to Bidders: Please submit revised pages A-7 through A-41 with your bid.

New bid opening date: 10-07-2021

Notice to Bidders: Please submit revised pages B-? through?/?and B-? with your bid.

Amendment No. A002, dated 09-24-2021 OR DOT CRGNSA 100(6) Solicitation No. 69056721B000016 Historic Columbia River Highway State Trail, Page 3 Viento to Mitchell Point Crossing

PLANS

Plan Sheets B-1 through B.21 Revises Summary of Quantity Sheets.

Plan Sheet I.1 Revises Upper Right Table.

ENCLOSURES

Pages:

IFB Page 1 A-3 A-7 through A-41 B-9 through B-11 C-67 through C-71 F-136

Plan Sheets:

B.1 through B.21 I.1

INVITATION FOR BIDS

Solicitation No. 69056721B000016

Project: OR DOT CRGNSA 100(6), Historic C Trail, Viento to Mitchell Point Crossing

Solicitation, Offer & Award, Bid Schedule, Contract Clauses, General Wage Decision, Special Contract Requirements, and Plans

This solicitation cites Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 This project uses U.S. Customary units of measure

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

610 EAST FIFTH STREET

VANCOUVER, WA 98661-3801

Phone: (360) 619-7520 – FAX: (360) 619-7932 e-mail : wfl.contracts@dot.gov

Bid Opening Date: 09/ 10/07/2021 See Page A-3, Block 13A

QUICK INDEX

Page Item --- Bid Submittal Checklist --- Authority to Sign --- Bid Bond --- Table of Contents A-1 Notice to Bidders A-3 SF 1442, Solicitation, Offer and

Award A-7 Bid Schedule B-1 Solicitation Provisions C-1 Contract Clauses D-1 General Wage Decision E-1 Special Contract Requirements H-1 Permits I-1 Reserved J-1 Fire Protection & Suppression K-1 Building Specifications

BID REMINDERS

Electronic bids will not be accepted. Submit printed copy of bid to the address listed on the enclosed SF 1442. Before submitting your bid, please review the following:

Have you rechecked your bid figures?

Have you completed the bid schedule?

Have you completed and signed the SF 1442, Solicitation, Offer & Award?

Have you acknowledged all amendments?

Have you completed the Representations & Certifications (Page B-1)?

Is your bid guarantee enclosed in proper form and amount (see FAR Clause 52.228-1), including Power of Attorney affidavit?

Does the lower left corner of the proposal envelope state “Bid Enclosed”?

Does the lower left corner include the Solicitation Number and the project number/name?A-1 Notice to Bidders

This solicitation is a Total Small Business Set-aside

See FAR clause 52.219-6 (pg C-2 )

Revised by Amendment A002

- -2021

This solicitation is designed

IN STRICT ACCORDANCE WITH:

Federal Acquisition Regulations (FAR) and Transportation Acquisition Regulations(TAR).

General Wage Decision Special Contract Requirements Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14

A-3

10/07/2021

A-7

BID SCHEDULE

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions.

Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit bid price by the quantity for each pay item and show the amount bid.

Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.

When the word “LPSM” (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.

When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.

Total all of the amounts bid for each pay item and show the total bid amount.

BRAND NAME OR EQUAL NOTIFICATION

Proposed equal products for the brand name products listed under Sections 08 71 00 (Door Hardware) and 10 28 00 (Toilet, Bath, and Laundry Accessories) of the Building Specifications (Section K) are not allowed.

If providing other than the specified brand name products for the respective work under Sections 255, 260, 261, 552, 563, 602, 611, 612, 613, 617, 618, 619, 633, 635, 636, 646, 651, 653, and 654; complete the following by identifying all proposed equal products and manufacturer’s being used in lieu of the listed brand name product(s), and submit this information with the bid documents (See FAR Provision 52.211-6, Brand Name or Equal).

Use the spaces provided on Page A-7a to identifying all proposed equal products and manufacturer’s being used in lieu of listed brand name products and manufacturers; and submit this information with the bid documents. Make additional copies of Page A-7a if additional spaces are needed, and number the pages appropriately in the spaces provided on the bottom right of the page above the footer.

Include with your bid, all documents needed by the Government to determine if the proposed product(s) meet the applicable requirements listed under Sections 255, 260, 261, 552, 563, 602, 611, 612, 613, 617, 618, 619, 633, 646, 651, 653, 654, 708, 711, 716, 719, 721, and 725 of the Special Contract Requirements; and Section K – Building Specifications. The determination as to the equality of the product offered is the responsibility of the Government and will be based on the information furnished by the bidder as well as other information reasonably available to the contracting office. If proposed “equal” is determined by the government to be “not equal”, the bid will be considered nonresponsive.

Bid Schedule Revised by Amendment A002 Project No.: OR DOT CRGNSA 100(6) Project Name: Historic Columbia River Highway State Trail, Viento to Mitchell Point Crossing

A-7a

Bid Schedule Project No.: OR DOT CRGNSA 100(6) Project Name: Historic Columbia River Highway State Trail, Viento to Mitchell Point Crossing

Proposed Equal: _____________________ Proposed Equal: _____________________

Manufacturer: _____________________ Manufacturer: _____________________

In Lieu Of: _____________________ In Lieu Of: _____________________

Manufacturer: _____________________ Manufacturer: _____________________

Proposed Equal: _____________________ Proposed Equal: _____________________

Manufacturer: _____________________ Manufacturer: _____________________

In Lieu Of: _____________________ In Lieu Of: _____________________

Manufacturer: _____________________ Manufacturer: _____________________

Proposed Equal: _____________________ Proposed Equal: _____________________

Manufacturer: _____________________ Manufacturer: _____________________

In Lieu Of: _____________________ In Lieu Of: _____________________

Manufacturer: _____________________ Manufacturer: _____________________

Proposed Equal: _____________________ Proposed Equal: _____________________

Manufacturer: _____________________ Manufacturer: _____________________

In Lieu Of: _____________________ In Lieu Of: _____________________

Manufacturer: _____________________ Manufacturer: _____________________

Proposed Equal: _____________________ Proposed Equal: _____________________

Manufacturer: _____________________ Manufacturer: _____________________

In Lieu Of: _____________________ In Lieu Of: _____________________

Manufacturer: _____________________ Manufacturer: _____________________

Page _____ of _____

A - 8

Contract Quantity Pay Items

25210-0000 ROCKERY

25501-0000 MECHANICALLY STABILIZED EARTH WALL (CIP CONCRETE FASCIA)

26101-1000 REINFORCED SOIL SLOPE, WELDED WIRE FACE

61301-0000 SIMULATED STONE MASONRY SURFACE TREATMENT

61302-0000 SIMULATED STONE MASONRY TEST WALL

61303-0000 SIMULATED STONE MASONRY SURFACE STAINING

Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

ALL LPSM $___LPSM_____ $____________

A0080 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

A0100 15501-0000 CONSTRUCTION SCHEDULE

ALL LPSM $___LPSM_____ $____________

A0120 15703-2500 SOIL EROSION CONTROL, MULCHING, HYDRAULIC METHOD

2.74 ACRE $____________ $____________

A0140 15703-3000 SOIL EROSION CONTROL, WOOD STRAND

0.58 ACRE $____________ $____________

A0160 15705-0100 SOIL EROSION CONTROL, SILT FENCE

500 LNFT $____________ $____________

A0180 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (SEDIMENT WATTLE)

3,950 LNFT $____________ $____________

A0200 15705-1500 SOIL EROSION CONTROL, COMPOST SOCK

1,075 LNFT $____________ $____________

A0220 15706-0200 SOIL EROSION CONTROL, CHECK DAM (TEMPORARY, FILTER ROCK W/

ROLLED PRODUCT)

8 EACH $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

Project Name:Historic Columbia River Highway State Trail, Viento to Mitchell Point Crossing

A - 9

A0240 15706-0200 SOIL EROSION CONTROL, CHECK DAM (TEMPORARY)

8 EACH $____________ $____________

A0260 15706-1100 SOIL EROSION CONTROL, INLET PROTECTION TYPE A

10 EACH $____________ $____________

A0280 15706-1300 SOIL EROSION CONTROL, INLET PROTECTION TYPE C

9 EACH $____________ $____________

A0300 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

1 EACH $____________ $____________

A0320 20101-0000 CLEARING AND GRUBBING

6.0 ACRE $____________ $____________

A0340 20220-1000 REMOVAL, INDIVIDUAL TREE

31 EACH $____________ $____________

A0360 20301-1100 REMOVAL OF GATE

2 EACH $____________ $____________

A0380 20301-2100 REMOVAL OF RESTROOM FACILITY

1 EACH $____________ $____________

A0400 20301-2400 REMOVAL OF SIGN

24 EACH $____________ $____________

A0420 20302-0700 REMOVAL OF FENCE

1,300 LNFT $____________ $____________

A0440 20302-1200 REMOVAL OF GUARDRAIL

800 LNFT $____________ $____________

A0460 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

130 SQYD $____________ $____________

A0480 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (CONTAMINATED SOIL)

ALL LPSM $___LPSM_____ $____________

A0500 20315-0000 SAWCUTTING PAVEMENT

2,220 LNFT $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A - 10

A0520 20401-0000 ROADWAY EXCAVATION

7,300 CUYD $____________ $____________

A0540 20403-0000 UNCLASSIFIED BORROW

9,300 CUYD $____________ $____________

A0560 20466-0000 CONSERVE AND STOCKPILE TOPSOIL

2,056 CUYD $____________ $____________

A0580 20701-0200 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE B

900 SQYD $____________ $____________

A0600 20707-0000 GEOCELL (VEGETATED)

63 SQYD $____________ $____________

A0620 21101-1000 ROADWAY OBLITERATION, METHOD 1

140 SQYD $____________ $____________

A0640 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1

172 CUYD $____________ $____________

A0660 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2

47 CUYD $____________ $____________

A0680 25125-0000 BOULDER

21 EACH $____________ $____________

A0700 25201-0000 SPECIAL ROCK EMBANKMENT

70 CUYD $____________ $____________

A0720 25210-0000 ROCKERY

3,374 SQFT $____________ $____________

A0740 25501-0000 MECHANICALLY STABILIZED EARTH WALL (CIP CONCRETE FASCIA)

7,366 SQFT $____________ $____________

A0760 26101-1000 REINFORCED SOIL SLOPE, WELDED WIRE FACE

3,592 SQFT $____________ $____________

A0780 30101-2000 AGGREGATE BASE GRADING D

5,300 TON $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A - 11

A0820 40101-0600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL

MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL (I-84)

100 TON $____________ $____________

A0860 40101-0700 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL

MAXIMUM SIZE AGGREGATE, 3 TO <30 MILLION ESAL (I-84)

200 TON $____________ $____________

A0900 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

2,100 TON $____________ $____________

A0920 41201-0000 TACK COAT

4 TON $____________ $____________

A0940 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

80 SQYD $____________ $____________

A0960 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (PRECAST PILASTERS)

3 CUYD $____________ $____________

A0980 56302-1000 PAINTING, CONCRETE STRUCTURE (EXTG CULVERTS)

150 SQFT $____________ $____________

A1000 56302-2000 PAINTING, STEEL STRUCTURE (BIN WALL)

9,400 SQFT $____________ $____________

A1020 56302-2000 PAINTING, STEEL STRUCTURE (EXTG CULVERTS)

150 SQFT $____________ $____________

A1040 56302-2000 PAINTING, STEEL STRUCTURE (GABION BASKET)

5,000 SQFT $____________ $____________

A1060 60201-0500 15-INCH PIPE CULVERT

639 LNFT $____________ $____________

A1080 60201-0600 18-INCH PIPE CULVERT

639 LNFT $____________ $____________

A1100 60201-0800 24-INCH PIPE CULVERT

301 LNFT $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A - 12

A1120 60210-0500 END SECTION FOR 15-INCH PIPE CULVERT

1 EACH $____________ $____________

A1140 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT

9 EACH $____________ $____________

A1160 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

5 EACH $____________ $____________

A1180 60401-0000 MANHOLE (DROP)

1 EACH $____________ $____________

A1200 60401-0000 MANHOLE

3 EACH $____________ $____________

A1220 60403-0000 INLET (ODOT TYPE G-2)

6 EACH $____________ $____________

A1240 60403-0000 INLET (DITCH)

6 EACH $____________ $____________

A1260 60501-0000 STANDARD UNDERDRAIN SYSTEM

135 LNFT $____________ $____________

A1280 60901-5600 CURB, STONE, TYPE 2, 14-INCH DEPTH

520 LNFT $____________ $____________

A1300 60901-5600 CURB, STONE, TYPE 2, 14-INCH DEPTH (MOUNTABLE)

33 LNFT $____________ $____________

A1320 60915-1000 WHEELSTOP, CONCRETE

7 EACH $____________ $____________

A1340 61101-0000 WATER SYSTEM (JUG FILLER)

ALL LPSM $___LPSM_____ $____________

A1360 61102-1200 1 1/2-INCH WATERLINE, POLYVINYL CHLORIDE (PVC)

751 LNFT $____________ $____________

A1380 61104-0500 VALVE, GATE, 1 1/2-INCH (WINTERIZATION W/ DRAIN)

4 EACH $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A - 13

A1400 61104-0500 VALVE, GATE, 1 1/2-INCH

8 EACH $____________ $____________

A1420 61105-0000 VALVE BOX

12 EACH $____________ $____________

A1440 61114-0000 WATER SYSTEM ACCESSORY (HOSE BIBB)

3 EACH $____________ $____________

A1460 61114-1500 WATER SYSTEM ACCESSORY, TIE-IN

3 EACH $____________ $____________

A1480 61201-0000 SEWER SYSTEM (DOSING TANK, 3000 GAL)

ALL LPSM $___LPSM_____ $____________

A1500 61201-0000 SEWER SYSTEM (ALTERNATIVE TREATMENT SYSTEM)

ALL LPSM $___LPSM_____ $____________

A1520 61201-0000 SEWER SYSTEM (SEPTIC TANKS, 3000 GAL)

ALL LPSM $___LPSM_____ $____________

A1540 61201-0000 SEWER SYSTEM (RECIRCULATION SEPTIC TANK, 3000 GAL)

ALL LPSM $___LPSM_____ $____________

A1560 61201-0000 SEWER SYSTEM (BOTTOMLESS SAND FILTER SYSTEM)

ALL LPSM $___LPSM_____ $____________

A1580 61202-0400 6-INCH SEWER LINE, PLASTIC

340 LNFT $____________ $____________

A1600 61207-0000 CLEANOUT

4 EACH $____________ $____________

A1620 61301-0000 SIMULATED STONE MASONRY SURFACE TREATMENT

819 SQYD $____________ $____________

A1640 61302-0000 SIMULATED STONE MASONRY TEST WALL

1 EACH $____________ $____________

A1660 61303-0000 SIMULATED STONE MASONRY SURFACE STAINING

819 SQYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A - 14

A1680 61501-0600 SIDEWALK, EXPOSED AGGREGATE COLORED CONCRETE

220 SQYD $____________ $____________

A1700 61501-0800 SIDEWALK, AGGREGATE

220 SQYD $____________ $____________

A1720 61501-0800 SIDEWALK, AGGREGATE (ADA)

160 SQYD $____________ $____________

A1740 61504-2000 ACCESSIBILITY RAMP, EXPOSED AGGREGATE CONCRETE

11 SQYD $____________ $____________

A1760 61509-0000 DETECTABLE WARNING PANELS (WHITE)

9 SQYD $____________ $____________

A1780 61701-4700 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS B WOOD POSTS (ODOT TYPE 3)

62.5 LNFT $____________ $____________

A1800 61701-4700 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS B WOOD POSTS (ODOT TYPE 2A)

725.0 LNFT $____________ $____________

A1820 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (ODOT NON-FLARED ENERGY

ABSORBING TERMINAL)

1 EACH $____________ $____________

A1840 61707-0000 STRUCTURE TRANSITION RAILING (ODOT GUARDRAIL TRANSITION TO

CONCRETE BARRIER)

103.00 LNFT $____________ $____________

A1860 61801-0000 CONCRETE BARRIER

262.5 LNFT $____________ $____________

A1880 61801-0000 CONCRETE BARRIER (SHOULDER)

950 LNFT $____________ $____________

A1900 61805-0000 RESET BARRIER

525 LNFT $____________ $____________

A1920 61901-0000 FENCE (TYPE 1-4W)

260 LNFT $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A - 15

A1940 61901-0000 FENCE (WOOD, 3-RAIL)

280 LNFT $____________ $____________

A1960 61902-1400 GATE, METAL, 16 FEET WIDTH

2 EACH $____________ $____________

A1980 61902-1800 GATE, METAL, 24 FEET WIDTH

1 EACH $____________ $____________

A2000 61902-1900 GATE, METAL, 26 FEET WIDTH

1 EACH $____________ $____________

A2020 61902-2100 GATE, METAL, 30 FEET WIDTH

1 EACH $____________ $____________

A2040 61904-0000 BOLLARD POST (COLLAPSABLE)

4 EACH $____________ $____________

A2060 62002-0000 STONE MASONRY (BASALT FLAGSTONE)

105 SQYD $____________ $____________

A2080 62010-0000 STONE MASONRY (FLUSH BASALT BAND, 36-INCH)

120 LNFT $____________ $____________

A2100 62010-0000 STONE MASONRY (BASALT SEAT WALL)

204 LNFT $____________ $____________

A2120 62102-0000 MARKER (TRAIL MEDALLION) (GOVERNMENT FURNISHED)

4 EACH $____________ $____________

A2140 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

30 HOUR $____________ $____________

A2160 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH

THUMB ATTACHMENT

40 HOUR $____________ $____________

A2180 62201-3750 CHAIN SAW

40 HOUR $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A - 16

A2200 62405-0700 PLACING CONSERVED TOPSOIL, 12-INCH DEPTH

8,435 SQYD $____________ $____________

A2220 62409-0000 PLACING MANUFACTURED TOPSOIL (COMPOST AMENDED)

93 CUYD $____________ $____________

A2240 62409-0000 PLACING MANUFACTURED TOPSOIL (ECOLOGY MIX)

59 CUYD $____________ $____________

A2260 62501-0000 TURF ESTABLISHMENT

2.74 ACRE $____________ $____________

A2280 62510-2000 SEEDING, HYDRAULIC METHOD

2.74 ACRE $____________ $____________

A2300 62516-2000 MULCHING, HYDRAULIC METHOD (NO SEED)

2,235 SQYD $____________ $____________

A2320 63301-0000 SIGN SYSTEM (ODOT)

5 EACH $____________ $____________

A2340 63301-0000 SIGN SYSTEM

10 EACH $____________ $____________

A2360 63302-0000 SIGN SYSTEM (WITH CONCRETE TRAIL SIGN SUPPORT)

37.03 SQFT $____________ $____________

A2380 63308-0000 OBJECT MARKER , STORMWATER TREATMENT

8 EACH $____________ $____________

A2400 63309-0100 DELINEATOR, TYPE 1

2 EACH $____________ $____________

A2420 63309-0400 DELINEATOR, TYPE 4

5 EACH $____________ $____________

A2440 63309-0500 DELINEATOR, TYPE 5

18 EACH $____________ $____________

A2460 63316-1000 REMOVE AND RESET SIGN

8 EACH $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A - 17

A2480 63401-0000 PAVEMENT MARKINGS (TYPE M, SOLID)

360 LNFT $____________ $____________

A2500 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

1,950 LNFT $____________ $____________

A2520 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE M, STRAIGHT ARROW)

3 EACH $____________ $____________

A2540 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE M, CAMPSITE LEGEND)

7 EACH $____________ $____________

A2560 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL

2 EACH $____________ $____________

A002 A2580 63501-0000 TEMPORARY TRAFFIC CONTROL (TCD AND TCM PROCESSES)

ALL LPSM $___LPSM_____ $____________

A2600 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM (SMART WORK

ZONE SYSTEM)

ALL LPSM $___LPSM_____ $____________

A2620 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM (WORK ZONE

PRESENCE LIGHTING SYSTEM)

ALL LPSM $___LPSM_____ $____________

A2640 63502-0300 TEMPORARY TRAFFIC CONTROL, ARROW BOARD, TYPE C

1 EACH $____________ $____________

A2660 63502-0500 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 2

11 EACH $____________ $____________

A2680 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

17 EACH $____________ $____________

A2700 63502-1200 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 28-INCH

241 EACH $____________ $____________

A2720 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

91 EACH $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A002 Revised by Amendment A002

A - 18

A2740 63502-1900 TEMPORARY TRAFFIC CONTROL, SHADOW VEHICLE (MOBILE

OPERATIONS)

4 EACH $____________ $____________

A2760 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

(RADAR SPEED TRAILER)

2 EACH $____________ $____________

A2780 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

(TRAILER-MOUNTED)

5 EACH $____________ $____________

A2800 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION

1 EACH $____________ $____________

A2820 63502-2600 TEMPORARY TRAFFIC CONTROL, MOVING TEMPORARY CRASH CUSHION

6 EACH $____________ $____________

A2840 63502-2800 TEMPORARY TRAFFIC CONTROL, REPLACEMENT BARRELS FOR CRASH

CUSHION

26 EACH $____________ $____________

A2860 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER (UNSECURED)

1,360 LNFT $____________ $____________

A2880 63503-0500 TEMPORARY TRAFFIC CONTROL, MOVING CONCRETE BARRIER

6,040 LNFT $____________ $____________

A2900 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

2,400 LNFT $____________ $____________

A2920 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

862 SQFT $____________ $____________

A2940 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

250 HOUR $____________ $____________

A2960 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

100 DAY $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A - 19

A2980 63601-3000 SYSTEM INSTALLATION, ELECTRICAL (FUELING STATION ELECTRICAL

WORK)

ALL LPSM $___LPSM_____ $____________

A3000 63602-3000 SYSTEM INSTALLATION, ELECTRICAL (EMERGENCY FUEL CUT OFF

SYSTEM)

1 EACH $____________ $____________

A3020 63602-3000 SYSTEM INSTALLATION, ELECTRICAL (MAIN ELECTRICAL PANEL)

1 EACH $____________ $____________

A3040 63602-3000 SYSTEM INSTALLATION, ELECTRICAL (SEPTIC CONTROL PANEL)

2 EACH $____________ $____________

A3060 63610-0100 CONDUIT, 3/4-INCH, PVC

50 LNFT $____________ $____________

A3080 63610-1600 CONDUIT, 2-INCH, PVC

1,430 LNFT $____________ $____________

A3100 63610-2200 CONDUIT, 3-INCH, PVC (PRIMARY ELECTRICAL)

700 LNFT $____________ $____________

A3120 63610-2800 CONDUIT, 4-INCH, PVC

260 LNFT $____________ $____________

A3140 63611-0200 WIRE, ELECTRICAL CONDUCTORS, 12 AWG

2,830 LNFT $____________ $____________

A3160 63611-0300 WIRE, ELECTRICAL CONDUCTORS, 10 AWG

1,840 LNFT $____________ $____________

A3180 63611-0300 WIRE, ELECTRICAL CONDUCTORS, 10 AWG (PULL ROPE)

550 LNFT $____________ $____________

A3200 63611-0500 WIRE, ELECTRICAL CONDUCTORS, 6 AWG

60 LNFT $____________ $____________

A3220 63611-0700 WIRE, ELECTRICAL CONDUCTORS, 3 AWG

250 LNFT $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A - 20

A3240 63611-0800 WIRE, ELECTRICAL CONDUCTORS, 2 AWG

1,190 LNFT $____________ $____________

A3260 63611-0900 WIRE, ELECTRICAL CONDUCTORS, 1 AWG

1,350 LNFT $____________ $____________

A3280 63611-1000 WIRE, ELECTRICAL CONDUCTORS, 0 AWG

800 LNFT $____________ $____________

A3300 63611-1100 WIRE, ELECTRICAL CONDUCTORS, 00 AWG (250 MCM WIRE)

1,000 LNFT $____________ $____________

A3320 63611-1100 WIRE, ELECTRICAL CONDUCTORS, 00 AWG (500 MCM WIRE)

100 LNFT $____________ $____________

A3340 63611-1100 WIRE, ELECTRICAL CONDUCTORS, 00 AWG

80 LNFT $____________ $____________

A3360 63611-1100 WIRE, ELECTRICAL CONDUCTORS, 00 AWG (4/0 WIRE)

120 LNFT $____________ $____________

A3380 63612-0000 LUMINAIRE (ELECTRIC SHED LIGHT FIXTURE)

1 EACH $____________ $____________

A3400 63621-3000 UTILITY BOX, JUNCTION BOX

5 EACH $____________ $____________

A3420 63621-4000 UTILITY BOX, TELEPHONE INTERCEPT BOX

1 EACH $____________ $____________

A3440 63622-0000 UTILITY TRENCH (PRIMARY VAULT TRENCHING)

300 LNFT $____________ $____________

A3460 63622-0000 UTILITY TRENCH

800 LNFT $____________ $____________

A3480 63623-1000 MANHOLE, ELECTRICAL (PRECAST VAULT)

2 EACH $____________ $____________

A3500 64602-1000 BUILDING, RESTROOM FACILITY (OPRD)

ALL LPSM $___LPSM_____ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A - 21

A3520 64602-2000 BUILDING, SUPPORT BUILDING (OPRD MAINTENANCE FACILITY)

ALL LPSM $___LPSM_____ $____________

A3540 64603-0000 FIXTURE (HOST SEWER CONNECTION)

1 EACH $____________ $____________

A3560 64603-0000 FIXTURE (HOST RV PEDESTAL)

1 EACH $____________ $____________

A3580 64603-0000 FIXTURE (FALLEN TREE TRUNK)

15 EACH $____________ $____________

A3600 64603-0000 FIXTURE (BICYCLE FIX-IT STATION)

1 EACH $____________ $____________

A3620 64603-0000 FIXTURE (FEE STATION)

1 EACH $____________ $____________

A3640 64603-0000 FIXTURE (HIKER-BIKER POD)

1 EACH $____________ $____________

A3660 64603-0000 FIXTURE (TRAIL SIGN SUPPORT-TYPE C)

1 EACH $____________ $____________

A3680 64603-0000 FIXTURE (TRAIL SIGN SUPPORT, TYPE I)

1 EACH $____________ $____________

A3700 64603-0000 FIXTURE (TRAIL SIGN SUPPORT, TYPE II)

1 EACH $____________ $____________

A3720 64603-0000 FIXTURE (TRAIL SIGN SUPPORT, TYPE III)

1 EACH $____________ $____________

A3740 64603-0000 FIXTURE (TRAIL SIGN SUPPORT, TYPE IV)

1 EACH $____________ $____________

A3760 64603-0000 FIXTURE (TRAIL SIGN SUPPORT, TYPE V)

2 EACH $____________ $____________

A3780 64603-0000 FIXTURE (FUELING STATION)

1 EACH $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A - 22

A3800 64603-0300 FIXTURE, BENCH (BASALT)

3 EACH $____________ $____________

A3820 64603-0500 FIXTURE, BICYCLE STORAGE RACK

3 EACH $____________ $____________

A3840 64603-0700 FIXTURE, PICNIC TABLE (ADA)

2 EACH $____________ $____________

A3860 64603-0700 FIXTURE, PICNIC TABLE

5 EACH $____________ $____________

A3880 64603-1500 FIXTURE, SHELTER (HIKER-BIKER, 3-SIDED)

3 EACH $____________ $____________

A3900 64603-1600 FIXTURE, FIRE RING (ADA)

2 EACH $____________ $____________

A3920 64603-1600 FIXTURE, FIRE RING

5 EACH $____________ $____________

A3940 64604-3000 FIXTURE, PEDESTRIAN RAILING (22" BARRIER-MOUNTED STEEL)

475 LNFT $____________ $____________

A3960 64604-3000 FIXTURE, PEDESTRIAN RAILING (MODIFIED 42" BARRIER-MOUNTED STEEL)

90 LNFT $____________ $____________

A3980 64604-3000 FIXTURE, PEDESTRIAN RAILING (42" WOOD, BROWN)

970 LNFT $____________ $____________

A4000 64604-3000 FIXTURE, PEDESTRIAN RAILING (48" STEEL)

980 LNFT $____________ $____________

A4020 64605-1000 FIXTURE, KIOSK

ALL LPSM $___LPSM_____ $____________

A4040 65401-1000 ROADSIDE ROCKFALL PROTECTION, FENCE (10' LOW DEFLECTION)

290 LNFT $____________ $____________

A4060 65401-1000 ROADSIDE ROCKFALL PROTECTION, FENCE (6' LOW DEFLECTION)

700 LNFT $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A - 23

A4080 65402-1000 ROADSIDE ROCKFALL PROTECTION, GABION BARRIER

33 CUYD $____________ $____________

Submitted by:____________________________________ Schedule Total:____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR DOT CRGNSA 100(6)

A - 24

Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount

X0020 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

X0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

X0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

ALL LPSM $___LPSM_____ $____________

X0080 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

X0100 15501-0000 CONSTRUCTION SCHEDULE

ALL LPSM $___LPSM_____ $____________

X0120 15703-2500 SOIL EROSION CONTROL, MULCHING, HYDRAULIC METHOD

1.46 ACRE $____________ $____________

X0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE

130 LNFT $____________ $____________

X0160 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (SEDIMENT WATTLE)

1,200 LNFT $____________ $____________

X0180 15705-1500 SOIL EROSION CONTROL, COMPOST SOCK

368 LNFT $____________ $____________

X0200 15705-1700 SOIL EROSION CONTROL, FILTER BERM

283 LNFT $____________ $____________

X0220 15706-0200 SOIL EROSION CONTROL, CHECK DAM (TEMPORARY)

25 EACH $____________ $____________

X0240 15706-0200 SOIL EROSION CONTROL, CHECK DAM (PERMANENT)

4 EACH $____________ $____________

X0260 15706-1100 SOIL EROSION CONTROL, INLET PROTECTION TYPE A

7 EACH $____________ $____________

X0280 15706-1300 SOIL EROSION CONTROL, INLET PROTECTION TYPE C

5 EACH $____________ $____________

Bid Schedule Schedule:X Schedule Type:Options

Project No:OR DOT CRGNSA 100(6)

A - 25

X0300 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

1 EACH $____________ $____________

X0320 20101-0000 CLEARING AND GRUBBING

6.0 ACRE $____________ $____________

X0340 20301-2400 REMOVAL OF SIGN

1 EACH $____________ $____________

X0360 20302-0700 REMOVAL OF FENCE

46 LNFT $____________ $____________

X0380 20302-1200 REMOVAL OF GUARDRAIL

1,628 LNFT $____________ $____________

X0400 20315-0000 SAWCUTTING PAVEMENT

4,100 LNFT $____________ $____________

X0420 20401-0000 ROADWAY EXCAVATION

4,000 CUYD $____________ $____________

X0440 20403-0000 UNCLASSIFIED BORROW

2,400 CUYD $____________ $____________

X0460 20466-0000 CONSERVE AND STOCKPILE TOPSOIL

1,200 CUYD $____________ $____________

X0480 20701-0200 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE B

1,900 SQYD $____________ $____________

X0500 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2

35 CUYD $____________ $____________

X0520 26001-0000 ROCK BOLT

1,460 LNFT $____________ $____________

X0540 26002-0000 ROCK DOWEL

645 LNFT $____________ $____________

X0560 30101-2000 AGGREGATE BASE GRADING D

4,900 TON $____________ $____________

Bid Schedule Schedule:X Schedule Type:Options

Project No:OR DOT CRGNSA 100(6)

A - 26

X0620 40101-0600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL

MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL (I-84)

210 TON $____________ $____________

X0640 40101-0700 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL

MAXIMUM SIZE AGGREGATE, 3 TO <30 MILLION ESAL (I-84)

700 TON $____________ $____________

X0680 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

1,600 TON $____________ $____________

X0700 40602-0000 FOG SEAL (MICROCOAT)

4,556 SQYD $____________ $____________

X0720 41201-0000 TACK COAT

3 TON $____________ $____________

X0740 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH

2,700 SQYD $____________ $____________

X0760 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

90 SQYD $____________ $____________

X0780 60201-0500 15-INCH PIPE CULVERT

448 LNFT $____________ $____________

X0800 60201-0600 18-INCH PIPE CULVERT

1,328 LNFT $____________ $____________

X0820 60201-0800 24-INCH PIPE CULVERT

304 LNFT $____________ $____________

X0840 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT

9 EACH $____________ $____________

X0860 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

1 EACH $____________ $____________

X0880 60401-0000 MANHOLE

4 EACH $____________ $____________

Bid Schedule Schedule:X Schedule Type:Options

Project No:OR DOT CRGNSA 100(6)

A - 27

X0900 60403-0000 INLET (DITCH)

8 EACH $____________ $____________

X0920 60403-0000 INLET (ODOT TYPE G-2)

6 EACH $____________ $____________

X0940 60501-0000 STANDARD UNDERDRAIN SYSTEM

145 LNFT $____________ $____________

X0960 61001-0000 HORIZONTAL DRAIN PIPE (UNLINED)

500 LNFT $____________ $____________

X0980 61701-4700 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS B WOOD POSTS (ODOT TYPE 2A)

562.5 LNFT $____________ $____________

X1000 61701-4700 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS B WOOD POSTS (ODOT TYPE 3)

50.0 LNFT $____________ $____________

X1020 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (ODOT NON-FLARED ENERGY

ABSORBING TERMINAL)

2 EACH $____________ $____________

X1040 61703-0000 TERMINAL END (ODOT TYPE 1 ANCHOR & TYPE C END PIECE)

2 EACH $____________ $____________

X1060 61707-0000 STRUCTURE TRANSITION RAILING (ODOT GUARDRAIL TRANSITION TO

CONCRETE BARRIER)

82.40 LNFT $____________ $____________

X1080 61801-0000 CONCRETE BARRIER

1,800.0 LNFT $____________ $____________

X1100 61804-1000 TERMINAL SECTION, TYPE 1 (ODOT CONCRETE BARRIER TERMINAL)

1 EACH $____________ $____________

X1120 61805-0000 RESET BARRIER

2,600.0 LNFT $____________ $____________

X1140 61901-0000 FENCE (TYPE 1-4W)

310 LNFT $____________ $____________

Bid Schedule Schedule:X Schedule Type:Options

Project No:OR DOT CRGNSA 100(6)

A - 28

X1160 62102-0000 MARKER (TRAIL MEDALLION) (GOVERNMENT FURNISHED)

8 EACH $____________ $____________

X1180 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

20 HOUR $____________ $____________

X1200 62201-3750 CHAIN SAW

40 HOUR $____________ $____________

X1220 62302-0100 SPECIAL LABOR, SLOPE SCALING

1,515 HOUR $____________ $____________

X1240 62405-0700 PLACING CONSERVED TOPSOIL, 12-INCH DEPTH

3,600 SQYD $____________ $____________

X1260 62409-0000 PLACING MANUFACTURED TOPSOIL (ECOLOGY MIX)

119 CUYD $____________ $____________

X1280 62501-0000 TURF ESTABLISHMENT

1.46 ACRE $____________ $____________

X1300 62510-2000 SEEDING, HYDRAULIC METHOD

1.46 ACRE $____________ $____________

X1320 62901-0700 ROLLED EROSION CONTROL PRODUCT, TYPE 2.C

168 SQYD $____________ $____________

X1340 63301-0000 SIGN SYSTEM (ODOT)

1 EACH $____________ $____________

X1360 63308-0000 OBJECT MARKER , STORMWATER TREATMENT

12 EACH $____________ $____________

X1380 63309-0100 DELINEATOR, TYPE 1

2 EACH $____________ $____________

X1400 63309-0400 DELINEATOR, TYPE 4

36 EACH $____________ $____________

X1420 63309-0500 DELINEATOR, TYPE 5

12 EACH $____________ $____________

Bid Schedule Schedule:X Schedule Type:Options

Project No:OR DOT CRGNSA 100(6)

A - 29

X1440 63313-1000 RUMBLE STRIP, SHOULDER

2,895 LNFT $____________ $____________

X1460 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

160 LNFT $____________ $____________

X1480 63401-2300 PAVEMENT MARKINGS, TYPE L, SOLID

14,000 LNFT $____________ $____________

X1500 63401-2400 PAVEMENT MARKINGS, TYPE L, BROKEN

7,000 LNFT $____________ $____________

X1520 63407-0300 RECESSED PAVEMENT MARKER, MONO-DIRECTIONAL REFLECTIVE

175 EACH $____________ $____________

A002 X1540 63501-0000 TEMPORARY TRAFFIC CONTROL (TCD AND TCM PROCESSES)

ALL LPSM $___LPSM_____ $____________

X1560 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM (WORK ZONE

PRESENCE LIGHTING SYSTEM)

ALL LPSM $___LPSM_____ $____________

X1580 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM (SMART WORK

ZONE SYSTEM)

ALL LPSM $___LPSM_____ $____________

X1600 63502-0300 TEMPORARY TRAFFIC CONTROL, ARROW BOARD, TYPE C

1 EACH $____________ $____________

X1620 63502-0500 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 2

11 EACH $____________ $____________

X1640 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

42 EACH $____________ $____________

X1660 63502-1200 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 28-INCH

612 EACH $____________ $____________

X1680 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

300 EACH $____________ $____________

Bid Schedule Schedule:X Schedule Type:Options

Project No:OR DOT CRGNSA 100(6)

A - 30

X1700 63502-1400 TEMPORARY TRAFFIC CONTROL, VERTICAL PANEL (GLARE SCREEN)

1,400 EACH $____________ $____________

X1720 63502-1400 TEMPORARY TRAFFIC CONTROL, VERTICAL PANEL (ODOT'S REFLECTIVE

BARRIER PANEL)

192 EACH $____________ $____________

X1740 63502-1400 TEMPORARY TRAFFIC CONTROL, VERTICAL PANEL (MOVE GLARE SCREEN)

2,800 EACH $____________ $____________

X1760 63502-1900 TEMPORARY TRAFFIC CONTROL, SHADOW VEHICLE (MOBILE

OPERATIONS)

4 EACH $____________ $____________

X1780 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

(RADAR SPEED TRAILER)

2 EACH $____________ $____________

X1800 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

(TRAILER-MOUNTED)

16 EACH $____________ $____________

X1820 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION

3 EACH $____________ $____________

X1840 63502-2600 TEMPORARY TRAFFIC CONTROL, MOVING TEMPORARY CRASH CUSHION

18 EACH $____________ $____________

X1860 63502-2800 TEMPORARY TRAFFIC CONTROL, REPLACEMENT BARRELS FOR CRASH

CUSHION (REPAIR NARROW SITE)

9 EACH $____________ $____________

X1880 63502-3000 TEMPORARY TRAFFIC CONTROL, RAISED PAVEMENT MARKER

1,380 EACH $____________ $____________

X1900 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER (UNSECRUED)

6,900 LNFT $____________ $____________

Bid Schedule Schedule:X Schedule Type:Options

Project No:OR DOT CRGNSA 100(6)

A - 31

X1920 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER (SECURED)

1,610 LNFT $____________ $____________

X1940 63503-0500 TEMPORARY TRAFFIC CONTROL, MOVING CONCRETE BARRIER

38,650 LNFT $____________ $____________

X1960 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

82,800 LNFT $____________ $____________

X1980 63503-0800 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL

29,325 LNFT $____________ $____________

X2000 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

1,952 SQFT $____________ $____________

X2020 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

250 HOUR $____________ $____________

X2040 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

100 DAY $____________ $____________

X2060 64603-0300 FIXTURE, BENCH (BASALT)

1 EACH $____________ $____________

X2080 64604-3000 FIXTURE, PEDESTRIAN RAILING (22" BARRIER-MOUNTED STEEL)

2,625 LNFT $____________ $____________

X2100 64604-3000 FIXTURE, PEDESTRIAN RAILING (42" BARRIER-MOUNTED STEEL)

850 LNFT $____________ $____________

X2120 64702-3500 MITIGATION, STORMWATER MANAGEMENT, DRY SWALE

110 LNFT $____________ $____________

X2140 65101-1000 DRAPED ROCKFALL PROTECTION, WIRE MESH (HIGH TENSILE STRENGTH,

CONTOURED)

11,785 SQYD $____________ $____________

X2160 65106-1000 ROCKFALL PROTECTION, PIN (EYELIT ANCHORS)

400 EACH $____________ $____________

Bid Schedule Schedule:X Schedule Type:Options

Project No:OR DOT CRGNSA 100(6)

A - 32

X2180 65301-0000 MIDSLOPE ROCKFALL ATTENUATOR

16,380 SQYD $____________ $____________

X2200 65402-1000 ROADSIDE ROCKFALL PROTECTION, GABION BARRIER

57 CUYD $____________ $____________

X2220 65602-0000 TEMPORARY ROADWAY ROCKFALL PROTECTION

ALL LPSM $___LPSM_____ $____________

Submitted by:____________________________________ Schedule Total:____________

Bid Schedule Schedule:X Schedule Type:Options

Project No:OR DOT CRGNSA 100(6)

A - 33

Contract Quantity Pay Items

20801-0000 STRUCTURE EXCAVATION (MITCHELL CREEK BRIDGE)

20801-0000 STRUCTURE EXCAVATION (PERHAM CREEK BRIDGE)

20803-0000 STRUCTURAL BACKFILL (PERHAM CREEK BRIDGE)

20803-0000 STRUCTURAL BACKFILL (MITCHELL CREEK BRIDGE)

25101-0500 PLACED RIPRAP, METHOD A, CLASS 5 (MITCHELL CREEK BRIDGE)

25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE

25501-2000 MECHANICALLY STABILIZED EARTH WALL, GABION FACE (MITCHELL CREEK BRIDGE)

55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (MITCHELL CREEK BRIDGE)

55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (PERHAM CREEK BRIDGE)

55202-1000 STRUCTURAL CONCRETE, CLASS D (AE), FOR APPROACH SLABS, TYPE 1 (PERHAM CREEK BRIDGE)

55210-0000 PRECAST STRUCTURAL CONCRETE , PRECAST PILASTERS AND CORBEL (PERHAM CREEK BRIDGE)

55210-0000 PRECAST STRUCTURAL CONCRETE , PRECAST PILASTERS (MITCHELL CREEK BRIDGE)

55211-0000 PRECAST STRUCTURAL CONCRETE MITCHELL CREEK BRIDGE ARCH CULVERT

55401-1000 REINFORCING STEEL (MITCHELL CREEK BRIDGE)

55401-1000 REINFORCING STEEL (PERHAM CREEK BRIDGE)

55601-0500 BRIDGE RAILING, CONCRETE (ORNAMENTAL PEDESTRIAL RAIL) (PERHAM CREEK BRIDGE)

61401-0000 LEAN CONCRETE BACKFILL (MITCHELL CREEK BRIDGE)

62002-0000 STONE MASONRY (MITCHELL CREEK BRIDGE)

62405-0700 PLACING CONSERVED TOPSOIL, 12-INCH DEPTH (PERHAM CREEK BRIDGE)

62405-0700 PLACING CONSERVED TOPSOIL, 12-INCH DEPTH (MITCHELL CREEK BRIDGE)

Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount

Y0020 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

Y0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

Y0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

ALL LPSM $___LPSM_____ $____________

Y0080 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

Y0100 15501-0000 CONSTRUCTION SCHEDULE

ALL LPSM $___LPSM_____ $____________

Y0120 15703-2500 SOIL EROSION CONTROL, MULCHING, HYDRAULIC METHOD

2.20 ACRE $____________ $____________

Y0140 15703-3000 SOIL EROSION CONTROL, WOOD STRAND

1.02 ACRE $____________ $____________

Bid Schedule Schedule:Y Schedule Type:Options

Project No:OR DOT CRGNSA 100(6)

A - 34

Y0160 15705-0100 SOIL EROSION CONTROL, SILT FENCE

600 LNFT $____________ $____________

Y0180 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (SEDIMENT WATTLE)

2,200 LNFT $____________ $____________

Y0200 15706-0200 SOIL EROSION CONTROL, CHECK DAM (TEMPORARY)

9 EACH $____________ $____________

Y0220 15706-1300 SOIL EROSION CONTROL, INLET PROTECTION TYPE C

1 EACH $____________ $____________

Y0240 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

2 EACH $____________ $____________

Y0260 20101-0000 CLEARING AND GRUBBING

3.0 ACRE $____________ $____________

Y0280 20301-1100 REMOVAL OF GATE

1 EACH $____________ $____________

Y0300 20301-2400 REMOVAL OF SIGN

3 EACH $____________ $____________

Y0320 20302-0700 REMOVAL OF FENCE

1,016 LNFT $____________ $____________

Y0340 20401-0000 ROADWAY EXCAVATION

3,200 CUYD $____________ $____________

Y0360 20466-0000 CONSERVE AND STOCKPILE TOPSOIL

604 CUYD $____________ $____________

Y0380 20702-0100 GEOTEXTILE FILTER, CLASS 1, TYPE A (PERHAM CREEK BRIDGE)

119 SQYD $____________ $____________

Y0400 20702-0100 GEOTEXTILE FILTER, CLASS 1, TYPE A (MITCHELL CREEK BRIDGE)

179 SQYD $____________ $____________

Y0420 20801-0000 STRUCTURE EXCAVATION (MITCHELL CREEK BRIDGE)

255 CUYD $____________ $____________

Bid Schedule Schedule:Y Schedule Type:Options

Project No:OR DOT CRGNSA 100(6)

A - 35

Y0440 20801-0000 STRUCTURE EXCAVATION (PERHAM CREEK BRIDGE)

50 CUYD $____________ $____________

Y0460 20803-0000 STRUCTURAL BACKFILL (PERHAM CREEK BRIDGE)

27 CUYD $____________ $____________

Y0480 20803-0000 STRUCTURAL BACKFILL (MITCHELL CREEK BRIDGE)

118 CUYD $____________ $____________

Y0500 20810-0000 SHORING AND BRACING (MITCHELL CREEK BRIDGE)

ALL LPSM $___LPSM_____ $____________

Y0520 20810-0000 SHORING AND BRACING (PERHAM CREEK BRIDGE)

ALL LPSM $___LPSM_____ $____________

Y0540 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1

3 CUYD $____________ $____________

Y0560 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2

25 CUYD $____________ $____________

Y0580 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 (PERHAM CREEK BRIDGE)

70 CUYD $____________ $____________

Y0600 25101-0500 PLACED RIPRAP, METHOD A, CLASS 5 (MITCHELL CREEK BRIDGE)

245 CUYD $____________ $____________

Y0620 25125-0000 BOULDER

18 EACH $____________ $____________

Y0640 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE

6,266 SQFT $____________ $____________

Y0660 25501-2000 MECHANICALLY STABILIZED EARTH WALL, GABION FACE (MITCHELL

CREEK BRIDGE)

460 SQFT $____________ $____________

Y0680 30101-2000 AGGREGATE BASE GRADING D

1,760 TON $____________ $____________

Bid Schedule Schedule:Y Schedule Type:Options

Project No:OR DOT CRGNSA 100(6)

A - 36

Y0720 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

1,250 TON $____________ $____________

Y0740 41201-0000 TACK COAT

3 TON $____________ $____________

Y0760 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

320 SQYD $____________ $____________

Y0780 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (MITCHELL CREEK BRIDGE)

84 CUYD $____________ $____________

Y0800 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (PERHAM CREEK BRIDGE)

87 CUYD $____________ $____________

Y0820 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (PRECAST PILASTERS)

2.00 CUYD $____________ $____________

Y0840 55202-1000 STRUCTURAL CONCRETE, CLASS D (AE), FOR APPROACH SLABS, TYPE 1

(PERHAM CREEK BRIDGE)

48 SQYD $____________ $____________

Y0860 55210-0000 PRECAST STRUCTURAL CONCRETE , PRECAST PILASTERS AND CORBEL

(PERHAM CREEK BRIDGE)

15 CUYD $____________ $____________

Y0880 55210-0000 PRECAST STRUCTURAL CONCRETE , PRECAST PILASTERS (MITCHELL

CREEK BRIDGE)

5 CUYD $____________ $____________

Y0900 55211-0000 PRECAST STRUCTURAL CONCRETE MITCHELL CREEK BRIDGE ARCH

CULVERT

92 SQYD $____________ $____________

Y0920 55302-3500 PRECAST, PRESTRESSED CONCRETE SLAB (PERHAM CREEK BRIDGE)

221 LNFT $____________ $____________

Y0940 55401-1000 REINFORCING STEEL (MITCHELL CREEK BRIDGE)

8,809 LB $____________ $____________

Bid Schedule Schedule:Y Schedule Type:Options

Project No:OR DOT CRGNSA 100(6)

A - 37

Y0960 55401-1000 REINFORCING STEEL (PERHAM CREEK BRIDGE)

15,953 LB $____________ $____________

Y0980 55601-0500 BRIDGE RAILING, CONCRETE (ORNAMENTAL PEDESTRIAL RAIL) (PERHAM

CREEK BRIDGE)

202 LNFT $____________ $____________

Y1000 56401-1000 BEARING DEVICE, ELASTOMERIC (PERHAM CREEK BRIDGE)

12 EACH $____________ $____________

Y1020 56702-0000 MICROPILE (PERHAM CREEK BRIDGE)

12 EACH $____________ $____________

Y1040 56702-0000 MICROPILE (MITCHELL CREEK BRIDGE)

28 EACH $____________ $____________

Y1060 56705-0000 MICROPILE LOAD VERIFICATION TEST (PERHAM CREEK BRIDGE)

1 EACH $____________ $____________

Y1080 56705-0000 MICROPILE LOAD VERIFICATION TEST (MITCHELL CREEK BRIDGE)

1 EACH $____________ $____________

Y1100 56706-0000 MICROPILE PROOF LOAD TEST (MITCHELL CREEK BRIDGE)

2 EACH $____________ $____________

Y1120 56706-0000 MICROPILE PROOF LOAD TEST (PERHAM CREEK BRIDGE)

2 EACH $____________ $____________

Y1140 60103-0000 CONCRETE, HEADWALL

2 EACH $____________ $____________

Y1160 60201-0600 18-INCH PIPE CULVERT

74 LNFT $____________ $____________

Y1180 60201-0800 24-INCH PIPE CULVERT

39 LNFT $____________ $____________

Y1200 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT

2 EACH $____________ $____________

Bid Schedule Schedule:Y Schedule Type:Options

Project No:OR DOT CRGNSA 100(6)

A - 38

Y1220 60403-0000 INLET (DITCH)

1 EACH $____________ $____________

Y1240 61401-0000 LEAN CONCRETE BACKFILL (MITCHELL CREEK BRIDGE)

42 CUYD $____________ $____________

Y1260 61901-0000 FENCE (TYPE 1-4W)

700 LNFT $____________ $____________

Y1280 61902-1400 GATE, METAL, 16 FEET WIDTH

1 EACH $____________ $____________

Y1300 61904-0000 BOLLARD POST (COLLAPSABLE)

1 EACH $____________ $____________

Y1320 62002-0000 STONE MASONRY (MITCHELL CREEK BRIDGE)

140 SQYD $____________…