OR DOT CRGNSA 100(6)_Earthwork Volumes_V and M Line.pdf

PDF 454 KB Posted

Attached to
OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Solicitation number
69056721B000016
Issued by

About this file

This document includes an earthwork volume report and calculations for the OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail project. The report provides excavation and embankment quantities in cubic yards for the "V" Line, "M" Line, and campground and maintenance facility site grading components of the project. Total excavation is estimated at 1,694 cubic yards with total embankment including conserved topsoil at 1,719 cubic yards. The related federal contract opportunity is solicitation number 69056721B000016 for the OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail project, issued by the Department of Transportation Federal Highway Administration as an Invitation for Bid. No further details are provided on products or services required, pricing terms, response dates, or other salient information.

View the file

Other files

File Type Posted
Tabulation of Bids.pdf PDF
BidSummary.pdf PDF
QA2_10-13-21.pdf PDF
Page F-136.pdf PDF
QA_10-13-21.pdf PDF
Amendment A006.pdf PDF
Sheets I.5 through I.7.pdf PDF
Sheets N.A-7 through N.A-8.pdf PDF
Sheets N.A-3 through N.A-5.pdf PDF
QA_10-12-21.pdf PDF
Amendment A005.pdf PDF
QA_10-08-21.pdf PDF
QA_10-07-21.pdf PDF
Amendmentt. A004.pdf PDF
Amendment A003.pdf PDF
QA_09-29-21.pdf PDF
QA_09-28-21.pdf PDF
QA_09-27-21.pdf PDF
Amendment A002.pdf PDF
QA_09-23-21.pdf PDF
HB Line_HA.pdf PDF
BPA-2 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Govt-Obtained DEQ Sanitary Sewer Permit.pdf PDF
OR DOT CRGNSA 100(6)_Earthwork Vol Report_I84 Shldr Widening.pdf PDF
V Line_HA.pdf PDF
K20676_Alder Slope Rockfall Criteria Memo.pdf PDF
OR DOT CRGNSA 100(6)_Viento Hazmat Testing Memo.pdf PDF
PP6 Line_HA.pdf PDF
BPA-2 Line_VA.pdf PDF
Viento_to_Mitchell_Pt_CompiledESCP_final.pdf PDF
PP5 Line_HA.pdf PDF
Trail Mainline_VA.pdf PDF
PP1 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_Trail Mainline.pdf PDF
BPA-1 Line_HA.pdf PDF
M Line_VA.pdf PDF
BPA-3 Line_VA.pdf PDF
BPA-3 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Geotechnical Report for Bridges.pdf PDF
M Line_HA.pdf PDF
V Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_M Line.pdf PDF
PP2 Line_HA.pdf PDF
HB Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Earthwork Vol Report_Mainline Trail.pdf PDF
PP3 Line_HA.pdf PDF
PP7 Line_HA.pdf PDF
BPA-1 Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_V Line.pdf PDF
PP4 Line_HA.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I D

HIGHWAY STATE TRAIL,

HISTORIC COLUMBIA RIVER

OR DOT CRGNSA 100(6)

VIENTO TO MITCHELL POINT CROSSING

100% FINAL EARTHWORK

VOLUME REPORT/CALCS

"V" Line, "M" Line, & Campground/Maintenance

Facility Site Grading

Date:

Volumes obtained from Openroads Component Quantities & End Area Volume Reports (See following Pages)

Roadway

Trail & BPA Accesses CY Trail & BPA Accesses CY

Viento Campground 1505 CY Viento Campground 1459 CY

OPRD Maintenance Facility 189 CY OPRD Maintenance Facility 259 CY

I-84 CY I-84 CY

Conserved Topsoil 1 CY Total Embankment Including

Conserved Topsoil CY

Total Excavation 1694 CY

TOTAL:

1694 CY 1694 1719 CY

ALLOWANCE: 6 CY 25 CY

75 CY

Corridor Name

Viento Campground 559 CY 981 CY

CG Restroom North Daylight 0 CY 95 CY

PP1 Parking Pad 10 CY 0 CY

PP2 Parking Pad 14 CY 0 CY

PP3 Parking Pad 18 CY 0 CY

PP4 Parking Pad 6 CY 1 CY

PP5 ADA Parking Pad 0 CY 162 CY

PP5 ADA Daylight Grading 0 CY 184 CY

PP6 ADA Parking Pad 263 CY 0 CY

PP6 ADA Gravel Cut Slope 8 CY 1 CY

PP7 Host Site 431 CY 1 CY

Cut Slope_Host ADA Site 175 CY 0 CY

HB_Trail 21 CY 34 CY

CAMPGROUND TOTAL 1505 CY 1459 CY

CL_Maint Facility_Accesses 134 CY 202 CY

"M" NW Shoulder 0 CY 0 CY

"M" SE Shoulder 7 CY 57 CY

Maint Facility_South Shoulder 48 CY 0 CY

MAINT FACILITY TOTAL 189 CY 259 CY

20401-0000 Roadway Excavation (CY) Roadway 20420-0000 Embankment in Place (CY)

EARTHWORK SUMMATION_HCRH Campground & Maintenance Facility

4/15/2021

EARTHWORK

TOTAL (Including Conserved Topsoil):

TOTAL UNCLASSIFIED BORROW:

ALLOWANCE:

Campground & Maint Facility Summation from Component Quantities 20401-0000 Roadway Excavation (CY) 20420-0000 Embankment in Place (CY)

MISC CORRIDOR VOLUMES"HB" "M" "V" & "PP_" CORRIDORS

"HB" "M" "V" & "PP_" CORRIDORS MISC CORRIDOR VOLUMES