PP7 Line_HA.pdf

PDF 124 KB Posted

Attached to
OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Solicitation number
69056721B000016
Issued by

About this file

This document contains a horizontal alignment review report and information on a related federal contract opportunity for construction services. The horizontal alignment review report provides technical specifications for a section of highway construction on the Historic Columbia River Highway State Trail in Oregon, including stationing, element types, directional angles, radii, lengths, and other geometric details.

The associated federal contract opportunity is a solicitation issued by the Federal Highway Administration to solicit bids for construction work on Project OR DOT CRGNSA 100(6) of the Historic Columbia River Highway State Trail between Viento and Mitchell Point Crossing. Bids are due by the date listed in the solicitation number 69056721B000016. The construction work involves building the section of highway discussed in the horizontal alignment review report.

View the file

Other files

File Type Posted
Tabulation of Bids.pdf PDF
BidSummary.pdf PDF
QA2_10-13-21.pdf PDF
Page F-136.pdf PDF
QA_10-13-21.pdf PDF
Amendment A006.pdf PDF
Sheets I.5 through I.7.pdf PDF
Sheets N.A-7 through N.A-8.pdf PDF
Sheets N.A-3 through N.A-5.pdf PDF
QA_10-12-21.pdf PDF
Amendment A005.pdf PDF
QA_10-08-21.pdf PDF
QA_10-07-21.pdf PDF
Amendmentt. A004.pdf PDF
Amendment A003.pdf PDF
QA_09-29-21.pdf PDF
QA_09-28-21.pdf PDF
QA_09-27-21.pdf PDF
Amendment A002.pdf PDF
QA_09-23-21.pdf PDF
HB Line_HA.pdf PDF
BPA-2 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Govt-Obtained DEQ Sanitary Sewer Permit.pdf PDF
OR DOT CRGNSA 100(6)_Earthwork Vol Report_I84 Shldr Widening.pdf PDF
V Line_HA.pdf PDF
K20676_Alder Slope Rockfall Criteria Memo.pdf PDF
OR DOT CRGNSA 100(6)_Viento Hazmat Testing Memo.pdf PDF
PP6 Line_HA.pdf PDF
BPA-2 Line_VA.pdf PDF
Viento_to_Mitchell_Pt_CompiledESCP_final.pdf PDF
PP5 Line_HA.pdf PDF
Trail Mainline_VA.pdf PDF
PP1 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_Trail Mainline.pdf PDF
BPA-1 Line_HA.pdf PDF
M Line_VA.pdf PDF
BPA-3 Line_VA.pdf PDF
BPA-3 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Geotechnical Report for Bridges.pdf PDF
OR DOT CRGNSA 100(6)_Earthwork Volumes_V and M Line.pdf PDF
M Line_HA.pdf PDF
V Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_M Line.pdf PDF
PP2 Line_HA.pdf PDF
HB Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Earthwork Vol Report_Mainline Trail.pdf PDF
PP3 Line_HA.pdf PDF
BPA-1 Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_V Line.pdf PDF
PP4 Line_HA.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHYSICAL DATA

for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

OR DOT CRGNSA 100(6)

Historic Columbia River Highway State Trail, Viento to Mitchell Point Crossing

Horizontal Alignment PP7 Line

Horizontal Alignment Review Report

Report Created: Thursday, April 15, 2021 Time: 12:49:32 AM

Project: Default

Description:

File Name:

P:\F\FHAX00000250\0400CAD\RH\CHKBRD\DJI\DESIGN INFO_V2M\PE HOLD

FILE_Electronic Data\OR1006_CORR-VIENTO CG.dgn

Last Revised:

4/15/2021 00:46:50

Note: All units in this report are in feet unless specified otherwise.

Alignment Name: PP7_Host Pad

Alignment Description:

Alignment Style: Alignment\Baseline - Access

Station Northing Easting

Element: Linear

START ( ) 1+00.000 742196.266 7904018.105

PC ( ) 1+05.302 742194.595 7904023.137

Tangential Direction: S71°37'36"E

Tangential Length: 5.302

Element: Circular

PC ( ) 1+05.302 742194.595 7904023.137

HPI ( ) 1+10.313 742193.016 7904027.892

CC ( ) 742185.105 7904019.985

PT ( ) 1+14.592 742188.261 7904029.474

Radius: 10.000

Delta: 53°13'33" Right

Degree of Curvature (Arc): 212°57'32"

Length: 9.290

Tangent: 5.010

Chord: 8.959

Middle Ordinate: 1.059

External: 1.185

Tangent Direction: S71°37'36"E

Radial Direction: S18°22'24"W

Chord Direction: S45°00'50"E

Radial Direction: S71°35'57"W

Tangent Direction: S18°24'03"E

Element: Linear

PT ( ) 1+14.592 742188.261 7904029.474

END ( ) 1+98.077 742109.044 7904055.827

Tangential Direction: S18°24'03"E

Tangential Length: 83.485

Page 1 of 1Horizontal Alignment Review Report

4/15/2021file:///C:/Users/dji/AppData/Local/Temp/RPTsxbumtmt.html