PP6 Line_HA.pdf

PDF 123 KB Posted

Attached to
OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Solicitation number
69056721B000016
Issued by

About this file

This document includes a horizontal alignment review report and federal contract opportunity solicitation. The horizontal alignment review report provides technical specifications for a proposed ADA parking pad, including start and end points, tangential direction and length, for the Historic Columbia River Highway State Trail project in Oregon.

The related federal contract opportunity solicitation was issued by the Department of Transportation Federal Highway Administration seeking bids for work on the OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail project. The solicitation references an attached Invitation for Bid and lists the opportunity type as a solicitation. No further details are provided on requirements, response dates, or award information.

View the file

Other files

File Type Posted
Tabulation of Bids.pdf PDF
BidSummary.pdf PDF
QA2_10-13-21.pdf PDF
Page F-136.pdf PDF
QA_10-13-21.pdf PDF
Amendment A006.pdf PDF
Sheets I.5 through I.7.pdf PDF
Sheets N.A-7 through N.A-8.pdf PDF
Sheets N.A-3 through N.A-5.pdf PDF
QA_10-12-21.pdf PDF
Amendment A005.pdf PDF
QA_10-08-21.pdf PDF
QA_10-07-21.pdf PDF
Amendmentt. A004.pdf PDF
Amendment A003.pdf PDF
QA_09-29-21.pdf PDF
QA_09-28-21.pdf PDF
QA_09-27-21.pdf PDF
Amendment A002.pdf PDF
QA_09-23-21.pdf PDF
HB Line_HA.pdf PDF
BPA-2 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Govt-Obtained DEQ Sanitary Sewer Permit.pdf PDF
OR DOT CRGNSA 100(6)_Earthwork Vol Report_I84 Shldr Widening.pdf PDF
V Line_HA.pdf PDF
K20676_Alder Slope Rockfall Criteria Memo.pdf PDF
OR DOT CRGNSA 100(6)_Viento Hazmat Testing Memo.pdf PDF
BPA-2 Line_VA.pdf PDF
Viento_to_Mitchell_Pt_CompiledESCP_final.pdf PDF
PP5 Line_HA.pdf PDF
Trail Mainline_VA.pdf PDF
PP1 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_Trail Mainline.pdf PDF
BPA-1 Line_HA.pdf PDF
M Line_VA.pdf PDF
BPA-3 Line_VA.pdf PDF
BPA-3 Line_HA.pdf PDF
OR DOT CRGNSA 100(6)_Geotechnical Report for Bridges.pdf PDF
OR DOT CRGNSA 100(6)_Earthwork Volumes_V and M Line.pdf PDF
M Line_HA.pdf PDF
V Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_M Line.pdf PDF
PP2 Line_HA.pdf PDF
HB Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Earthwork Vol Report_Mainline Trail.pdf PDF
PP3 Line_HA.pdf PDF
PP7 Line_HA.pdf PDF
BPA-1 Line_VA.pdf PDF
OR DOT CRGNSA 100(6)_Cross-Sections_V Line.pdf PDF
PP4 Line_HA.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHYSICAL DATA

for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

OR DOT CRGNSA 100(6)

Historic Columbia River Highway State Trail, Viento to Mitchell Point Crossing

Horizontal Alignment PP6 Line

Horizontal Alignment Review Report

Report Created: Thursday, April 15, 2021 Time: 9:26:05 AM

Project: Default

Description:

File Name:

P:\F\FHAX00000250\0400CAD\RH\CHKBRD\DJI\DESIGN INFO_V2M\PE HOLD

FILE_Electronic Data\OR1006_CORR-VIENTO CG.dgn

Last Revised:

4/15/2021 09:21:51

Note: All units in this report are in feet unless specified otherwise.

Alignment Name: PP6_Parking Pad

Alignment Description:

Alignment Style: Alignment\Baseline - Access

Station Northing Easting

Element: Linear

START

( PP6_ADA

Parking Pad )

1+00.000 742169.681 7903994.447

END ( ) 1+46.232 742132.935 7904022.504

Tangential Direction: S37°21'47"E

Tangential Length: 46.232

Page 1 of 1Horizontal Alignment Review Report

4/15/2021file:///C:/Users/dji/AppData/Local/Temp/RPTowqkehuh.html

File details come from the government source that posted it. Updated .