This is a Statement of Work (SOW) for the Argonne National Laboratory's ARM User Facility, detailing the disassembly and removal of three radar sites located in Oklahoma. The project involves dismantling and recycling X-band and C-band radar components at five specific locations: IF4, IF5, IF7, IF8, and IF10, with each site requiring specific remediation tasks. These tasks include removing radar infrastructure such as communication towers, foundations, electronics enclosures, fencing, and underground electrical systems, and restoring the sites to their natural condition or as requested by landowners.
The SOW specifies strict safety requirements, including OSHA compliance, fall protection protocols, and environmental considerations. Contractors must follow detailed procedures for radar component disassembly, using the provided radar assembly manual as a guide. The project has a desired completion date of September 30, 2025, with sites requiring different levels of infrastructure removal. Critical requirements include complete recycling or destruction of all radar components, preventing resale, and ensuring sites are left in a condition suitable for agricultural use. The work will be conducted under the Department of Energy's ARM Climate Research Facility, with specific technical and safety guidelines governing the project's execution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum and Acknowledgement Doc No.003.doc | DOC document | |
| SGP_Remediation_SOW_IFSites_7.17.25_Rev2.pdf | ||
| Addendum and Acknowledgement Doc No.002.doc | DOC document | |
| Enclosure No. 2 SGP_Remediation_SOW_IFSites_7.7.25.pdf | ||
| Addendum and Acknowledgement Doc.doc | DOC document | |
| RV1 Instructions to Offerors_G5-149039.doc | DOC document | |
| Noble County Wage Determination.pdf | ||
| SGP_IF Sites_Pre-Proposal Meeting.pptx | PPTX presentation | |
| Enclosure No. 1 ANL-70 Request for Quotation.doc | DOC document | |
| Enclosure No. 3 Safety Oversight 7_1_2025.docx | DOCX document | |
| Arm SGP IF Sites Remediation Meeting Link.docx | DOCX document | |
| Enclosure No. 4 SCA Wage Determination - SGP IF Radar Sites.pdf | ||
| ANL-366O - LMH Risk Off-Site Non851 20221021.pdf | ||
| ANL-70B Reps and Certs Long-14-FEB-2025.PDF | ||
| Instructions to Offerors_G5-149039.doc | DOC document | |
| Enclosure No. 2 SGP_Remediation_SOW_IFSites_7.7.25.pdf | ||
| Appendix A-71COM-13-FEB-2023.PDF |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX B – Statement of Work
ARM User Facility Southern Great Plains (SGP) Site
Statement of Work
Disassembly and Removal of SGP IF Radar Sites
07/17/2025
Contents
ARM User Facility
Statement of Work
Background
Statutory and regulatory requirements
Scope
General Notes:
Safety
Period of Performance
Objectives
Applicable Documents (Appendix)
Site Specific Tasks
IF4 and IF5
Radar
Remediation
Earth Work
IF7
Radar
Remediation
Earth Work
IF8 and IF10
Radar
Remediation
Earth Work
Options
Appendix A: Pictures and Drawings
Appendix 2: Radar Assembly Manual
Background The DOE ARM User Facility, Southern Great Plains (SGP) Main Site, located at 109596
Coal Road, Billings, Oklahoma, is disassembling and removing 3 radars and remediate 4 sites. The work will entail dismantling and recycling of the radars along with remediation of the sites by removing infrastructure such as concrete foundations, standard size shipping containers, trailers, and fencing.
Site Locations:
IF4: 6500 Dakota Road Billings, OK, (36.5786, -97.3638)
IF5: 19223 E. Robertson Rd Garber, OK (36.4911, -97.5939)
IF7: 22245 W. Ferguson Ave, Nardin, OK, (36.7961, -97.4490)
IF8: 18895 W. Highland Ave, Tonkawa, OK (36.4771 -97.4210)
IF10: 101752 Custard Road, Lamont, OK (36.6655, -97.6284)
Statutory and regulatory requirements
• OKIE dig prior to any excavation.
• OSHA Fall Protection: 29 CFR 1926.104, 1926.1053, CFR 1926 Subpart L, and 1926.450 through 454.
Scope The contractor shall provide all personnel, facilities, equipment, and general supplies necessary to complete all tasks for all sites along with coordinating efforts to be efficient and timely.
A Laboratory representative shall accompany the contractor while work is being performed and abide by all safety requirements.
Contractor shall disassemble all radars and parts to include the dome, dish, pedestal, elevated platform, and instrument container where noted.
Contractor shall remove structures (communication towers, enclosures), concrete and gravel foundations, and fencing where noted.
Contractor shall fill all holes where concrete was removed. All fill dirt shall be compacted to avoid sinking ground after the remediation. Earth shall be left in natural contour without holes.
General Notes:
• All radar components must be recycled or destroyed and cannot be resold as a whole or as parts.
• Earth work at all sites, except IF7, must be left with topsoil similar to what is present on site so the farmer can plant crops. Clay may be used as fill, however no clay shall be used on the surface of the land.
• The winning bidder may want to contact the county commissioners and or landowners to see if they want the gravel for reusing on the roads.
o To contact landowners, please direct questions to the Technical Representative (Patty Campbell) o County Commissioner information can be provided
• Contractor shall communicate with electric company as needed.
Safety Contractor shall comply with all applicable OSHA requirements to include but not limited to the following:
1. Assign and document an ESH representative on a JSA. Argonne boiler plate template JSA will be provided after the award for Contractor to fill out with task specifics. Those tasks not being performed shall be removed.
2. Contractor ESH representative must be physically present at the worksite anytime work is occurring.
3. Contractor’s ESH representative must provide a current OSHA 30-hour safety training in General Industry or Construction certification after award of contract to the Argonne Technical Representative.
4. Contractor’s ESH representative shall provide and document job site safety orientation training to all personnel working at the job site. Signature of orientation of each personnel shall be provided daily on the approved JSA.
5. Contractors ESH representative shall perform daily checks, as applicable, including, but not limited to the following:
a. Inspect tools and equipment.
b. Inspect and observe workers' PPE.
c. Inspect and verify qualifications for equipment such as powered industrial trucks and hoisting and rigging equipment.
d. Mark the work area, including proper signage.
e. Manage storage and laydown areas.
6. Contractor ESH representative will be the primary contact to the Argonne Technical Representative and shall provide periodic check-ins and report all incidents.
7. All after-hour work must be approved by Argonne.
8. Contractor shall follow appropriate OSHA standards for fall protection including but not limited to 29 CFR 1926.104, 1926.1053, CFR 1926 Subpart L, and
1926.450 through 454.
a. A full body harness with 100% fall protection is required at all times when working 6 feet above a lower level.
b. Fall protection is required when working on roofs within 15ft of a non-roofing operation.
c. Anchor points used for fall protection shall be capable of supporting a 5,000lb load.
d. Provide training certification for all personnel working at heights.
9. SDS sheets shall be available on site for all chemicals brought and/or used on site.
10. Contractor shall provide a simple lift plan when using lift equipment to identify the system and components to be used in the lift, the expected total weights, and the placement of the equipment.
11. Prior to the start of any hauling or dumping operations, the contractor shall provide a spotter to avoid any overhead lines or other obstacles.
Period of Performance Argonne desires for work to be completed by September 30, 2025, but requests the contractor propose their best schedule.
Objectives The objective of this project is to restore several DOE ARM satellite facilities to their natural condition or as requested by the Landowner. While the individual sites are similar, the Contractor must recognize and understand the differences at each site before submitting a bid. For instance, at some sites, radars have already been removed, so only site remediation is required. At another site, earth has been displaced to level a fenced-in area, and the Landowner wishes for this to be restored.
Applicable Documents (Appendix)
• Radar installation manual to help guide the dismantling of the radars in reverse order
• Site Drawings and Pictures
Site Specific Tasks IF4 and IF5
Radar Contractor shall disassemble, remove, and recycle/destroy the X-band radar components
(Dome, dish, base, and pedestal) at both sites. The dome is in sections bolted together and then sealed with silicone and may be difficult to separate. Because the components are to be recycled/destroyed, the contractor may remove them in the most economical way possible.
Remediation Contractor shall perform the following:
Structures
• Disassemble and dispose of a 40’ communication towers at both sites.
Communications equipment on the towers shall be retained by SGP Personnel.
• Disassemble and remove an 8.5’ x 9’ fiber glass electronics enclosure including the metal instrument rack inside.
• Disassemble and dispose of the steel radar platform.
• Remove and dispose of the 50’ aluminum flagpoles.
Note: Removal of all wiring and computer systems associated with the radars shall be done by SGP personnel prior to removal of any structures.
Underground Electrical
• Remove wire inside of underground conduit from the service disconnect to the radar building and cut off the conduit 24” below the surface and abandon remaining conduit in place.
• Remove all buried grounding circuits and communication lines within the sites.
Civil
• Remove communication towers concrete foundation pads – 90” x 90” x 66” deep
• Remove flagpole foundation pads, 48” x 48” x 68” deep
• Remove radar foundation pads (includes the electronics enclosure foundation), see Radar Foundation Detail drawing for dimensions (1,500 - 2,000 ft3)
• Remove all gravel within the fence line and dispose properly dispose of
• Fill and compact all holes appropriately.
• Remove any underground copper lightning protection from the site.
Fence
• Remove and dispose of all 10ft. chain link fence, gates, and poles from each site:
o IF4 320ft (additional 100ft (6’) of fence is not shown in drawing) o IF5 220ft
Earth Work Sites shall be left level and covered with topsoil so the farmer can plant.
Note: Pipe (swing) driveway entrance gates for each site shall remain in place.
IF7
Radar
Contractor shall disassemble, remove, and recycle/destroy the C-band radar components. The dome is in sections sealed with silicone and may be difficult to separate. Because the components are to be recycled/destroyed, the contractor may remove in the most economical way possible.
Remediation The infrastructure, flagpole, and earth will remain in tact at this site.
Structures
• Disassemble and dispose of the steel radar platform.
• Remove the 8’ x 8’ x 20’ shipping container and ship/transport to the SGP main site: 109596 Coal Rd. Billings OK 74630
Note: Removal of all wiring and computer systems associated with the radars shall be done by SGP personnel prior to removal of any structures.
Earth Work
Contractor shall be responsible for any damage to the existing earth and infrastructure not being removed.
IF8 and IF10 **Please note there is a powerline to be aware of at site IF10**
Radar Radars have previously been removed from IF8 and IF10
Remediation Contractor shall perform the following:
Structures
• Remove and dispose of an 8’x 8’x12’ structures at IF8 and IF10
• Remove and dispose of a communication tower at each site o IF8 40’ o IF10 60’
Underground Electrical
• Remove wire inside of underground conduit from the service disconnect to the radar building and cut off the conduit 24” below the surface and abandon remaining conduit in place.
• Remove and dispose of all buried grounding circuits and communication lines within the sites.
Civil
Remove and dispose of the following foundations:
• Communications tower pads, 72”x72”x48” deep
• Electronics Enclosure pads, 168”x132”x24” deep
• Radar pad, 168”x168”x24” deep
• All site gravel within the fence line
• Remove 4 in-ground anchors around the radar pad
• Removal of a 1.5” diameter rain gauge pole set in concrete approximately 36”
• Fill and compact all holes appropriately.
• Remove any underground copper lightning protection from the site.
• Remove 4ft x 4ft x 2ft step from site 10. This step is not attached to anything and is just sitting on the ground.
Fencing Remove and dispose of all 6’ Chain Link fences, gates, and poles for each site, 32’x48’. Note: There are no pipe entrance gates at IF4&5
Earth Work At the IF8 site, the Contractor shall perform earth-moving activities to facilitate agricultural operations by the Landowner. The grading must be executed in a manner that permits the use of a mower, bushhog, or other farming equipment necessary for the regular maintenance of rotating crops. The contractor shall fill in some smaller water holes near the site as pointed out in the site visit.
Pictures of the IF8 site are provided with this scope, and all prospective bidders shall be afforded the opportunity to conduct an on-site inspection. Following the site visit, a
Request for Information (RFI) period will be available prior to the submission of bids.
Options
1. The landowner of IF8 may request grass be planted in the disturbed area. In the event that the landowner does make this request the contractor shall apply seed appropriate for the growing season.
Appendix A: Pictures and Drawings
IF4 and IF5 IF4&5 Radar pedestal
IF4&5 Radar lower half
IF4&5 Radar Base
IF4&5 Radar Dish
IF4&5 Radar Upper Half
IF4&5 Site Layout
IF4&5 Site Sketch
IF4&5 Radar Foundation Detail
IF7
IF7 Site Layout
IF7 Site Sketch
IF8 and IF10 IF8&10 Site Sketch
Please note that the tower at IF8 is 40' and IF10 is 60'.
IF8&10 Electronics Enclosure
IF8&10 Communications Tower foundation
IF8&10 RWP Foundation
Please note that the RFP has been previously removed from the foundation pad.
Appendix B: Radar Assembly Manual
Assembly Instructions C1028-401
Revision : X2
Effective Date: 07/12/10
PRINTED DOCUMENTS ARE FOR REFERENCE ONLY. VERIFY REVISION BEFORE USE.
ARA CONFIDENTIAL Page 2 of 19
PARTS LIST
Qty Part Number Description Where Used 8 C1028-01 Reflector Panels
1 C1028-01 Hub
8 C1028-01 Splice Plates
1 C0861-512 with C0729- 526 & -527
Feed Assembly
2 C1028-501 & C0729-525
Waveguide Spar Assembly
2 C1028-502 Spar Assembly
2 C0861-09 &-10 Waveguide Brackets
4 C0861-502 Clevis Brackets
2 08-01-0002 CPR-159 waveguide gasket
12 07-38-6013 ¼-20 x 1 3/8” long hex head bolt Spar to Feed
16 07-38-6010 ¼-20 x 1” long hex head bolt Waveguide to Feed
28 07-76-0006 ¼-20 nut
56 07-75-3006 ¼ flat washer
28 07-75-2006 ¼ lock washer
64 07-38-7012 3/8-16 x 1 1/4” long hex head bolt Reflector Assy
4 07-38-7014 3/8-16 x 1 1/2” long hex head bolt Spar to Clevis
96 07-38-7010 3/8-16 x 1” long hex head bolt Splice Plate to Reflector
4 07-76-3000 3/8-16 nut
168 07-75-3007 3/8 flat washer
164 07-75-2007 3/8 lock washer
4 09-15-0033 5/16-18 eye bolt Clevis Bracket to Reflector
16 07-38-9509 5/16-18 X 1” long hex head bolt Clevis Bracket to Reflector Waveguide Bracket to Reflector
20 07-75-3019 5/16 flat washer
20 07-75-2019 5/16 lock washer
8 07-33-4007 #8-32 x 5/8” long pan flat head screw
Wave Guide Bracket
8 07-76-0004 #8-32 nut
8 07-75-3004 #8 flat washer
8 07-75-2004 #8 lock washer
12 09-22-0006 Taper Pin #2 Spar to Clevis and Feed
Recommended tools and torque for hardware
Hardware Torque (in-lbs) Tools 3/8-16 200 9/16” socket and wrench 5/16-18 120 ½” socket and wrench ¼-20 70 7/16” socket and wrench #-8-32 15 #2 phillips screwdriver and 11/32” wrench
December 3, 2015 CSAPR Operator’s Handbook DRAFT
ARA CONFIDENTIAL Page 3 of 19
Remove C1028-01 middle section of reflector from crate and inspect for damage along all surfaces.
Inspect and confirm that eight (8) ½-13 x 1” helicoils have been installed equally spaced on a 46” circle around the diameter of the hub located on the bottom of the reflector as viewed.
Inspect and confirm that the middle section of the reflector has sixteen (16) support ribs equally spaced along the outside edge of the middle section of the reflector. The sixteen (16) ribs should be numbered as shown from 1 – 1 to 8 – 8.
(8) ½ -13 x 1” helicoils
C1028-01 reflector
- middle section
Inspect and confirm that supports are attached to all sixteen (16) ribs with six (6) flat head screws and all screws are flush.
Inspect and confirm that a 3/8” x 1” helicoil is installed in the bottom hole.
Support attached with flat head screws
3/8 x 1” helicoil
ARA CONFIDENTIAL Page 4 of 19
It is very important that you assemble the Reflector in the following sequence so that it does not tip over as panels are assembled.
Remove panel #1 from the crate and inspect for damage. Notify your supervisor immediately if damage is found.
Confirm that all ribs have supports attached with six (6) flat head screws that are flush to the outside surface. Inspect and confirm that the top hole of the rib closest to the number has a ½” round pin to aid in location.
Inspect and confirm that the middle hole has a 3/8 x 1” helicoil installed.
Panel # 1
Support
½ ” round pin
ARA CONFIDENTIAL Page 5 of 19
Confirm that Panel # 1 is positioned between the location marked # 2 and # 8.
Attach panel # 1 to the mating position on the reflector labeled #1.
Install one (1) 3/8 -16 x 1 1/4” bolt (part # 07-38-7012) with one (1) 3/8” lock washer (part # 07-75-2007) and one (1) 3/8” flat washer (part # 07-75- 3007) through panel # 1 into the rib with the 3/8 x 1” helicoil. Install one
(1) 3/8 -16 x 1 1/4” bolt (part # 07-38- 7012) with one (1) 3/8” lock washer (part # 07-75-2007) and one (1) 3/8” flat washer (part # 07-75-3007) through the rib into the hole in panel # 1 with the 3/8 x 1” helicoil. The ½” round pin in panel # 1 must fit into its mating hole for the panel to fit tight.
Do not tighten at this time!
Attach at two (2) locations.
3/8 – 16 x 1 1/4” bolt through panel # 1
3/8 – 16 x 1 1/4” bolt through the rib
ARA CONFIDENTIAL Page 6 of 19
Ensure supports are flush and ½” round pin has “locked in” to its mating location. If properly assembled, the supports will appear as above.
Supports are flush!!!!!
Remove panel # 5 from the crate. Inspect the panel for damage. Position the panel on the reflector at the location labeled # 5. Maneuver panel # 5 until the 1/2 “round pin “locks” into its mating position.
Install one (1) 3/8 -16 x 1 1/4” bolt (part # 07-38-7012) with one (1) 3/8” lock washer (part # 07-75- 2007) and one (1) 3/8” flat washer (part # 07-75-3007) through panel # 5 into the rib with the 3/8 x 1” helicoil. Install one (1) 3/8 -16 x 1 1/4” bolt (part # 07-38-7012) with one (1) 3/8” lock washer (part # 07-75-2007) and one (1) 3/8” flat washer (part # 07-75-3007) through the rib into the hole in panel # 5 with the 3/8 x 1” helicoil. Do not tighten at this time!
Panel # 5
ARA CONFIDENTIAL Page 7 of 19
If assembled properly, the reflector should look like the above picture. Panel # 5 should be attached opposite Panel # 1. Continue attaching the Panels following the same directions in the following sequence….. Panel # 3, Panel # 7, Panel # 2, Panel # 6, Panel #4, Panel # 8. Once completed, it should look like the picture below.
ARA CONFIDENTIAL Page 8 of 19
Panel # 1
Panel # 2 3/8 -16 x 1 1/4” bolt far side
3/8 -16 x 1 1/4” bolt
1/2 “round pin far side
Ensure each panel is flush at all edges including the reflector.
Install one (1) 3/8 -16 x 1 1/4” bolt (part # 07-38-7012) with one (1) 3/8” lock washer (part # 07-75-2007) and one (1) 3/8” flat washer (part # 07-75- 3007) through panel # 1 into the rib of Panel # 2 with the 3/8 x 1” helicoil.
Install one (1) 3/8 -16 x 1 1/4” bolt (part # 07-38-7012) with one (1) 3/8” lock washer (part # 07-75-2007) and one (1) 3/8” flat washer (part # 07-75- 3007) through Panel # 2 into the rib in panel # 1 with the 3/8 x 1” helicoil. Do not tighten at this time!
Continue connecting all panels like this until all hardware is inserted.
F lush
Flush
Flush
ARA CONFIDENTIAL Page 9 of 19
1. Begin tightening a seam designated as number 1 and tighten the opposite seam, inside latch to outside latch. Do not tighten the center hub/petal locations.
2. Tighten the next seams 90º from seam number 1, again inside to outside. Do not tighten center hub/petal locations.
3. Tighten the remaining 2 seams following the inside outside procedure one seam at a time.
4. Tighten the petals to the center hub using wheel hub method of opposite locations.
5. Tighten hardware to 200 in-lbs.
90º 90º
X
X
Y
Y
ARA CONFIDENTIAL Page 10 of 19
Install splice plates at end of panel seams with twelve (12) 3/8 -16 x 1” bolt (part # 07-38-7012), twelve (12) 3/8”lockwasher (part # 07-75-2007), and twelve (12) 3/8” flat washer (part # 07-75- 3007). Tighten hardware to 200 in-lbs.
Complete antenna assembly.
ARA CONFIDENTIAL Page 11 of 19
Attach the four (4) Spar Clevis Brackets (part # C0861-502) to the multi-piece reflector at the locations designated in figure 2 below. Orient the location by the panels with the 4” thru holes. Install with three (3) 5/16-18 x 1” hex head bolts (part # 07-38-9509), three (3) 5/16” lock washers (part # 07-75-2019) and three (3) 5/16” flat washers (part # 07-75-3019) along with one
(1) 5/16-18 eyebolt (part # 09-15-0033), one (1) 5/16” lock washer (part # 07-75-2019) and one (1) 5/16” flat washer (part # 07-75-3019). Install the Spar Clevis Bracket with the gusset on the left when facing the reflector. Install the Eyebolt in the outside hole on the left side of the Spar Clevis Bracket when facing the reflector as shown in figure 1.
Figure 1
Spar Clevis Bracket
E yebolt Metal Stamp
Hex Head Bolts
ARA CONFIDENTIAL Page 12 of 19
Figure 2
Confirm all Spar Clevis Brackets are installed correctly and tighten bolts to 120 in-lbs.
Figure 3
Mark # 3
Mark # 2
Mark # 4
Panel # 1
Panel # 7
P anel # 5
Panel # 3
Mark # 1
ARA CONFIDENTIAL Page 13 of 19
Figure 4
Spars will be stamped similarly to the above picture indicating number (1 thru 4) and direction (up). Feed will also be stamped accordingly.
Place a pre-assembled WR-159 OMT feed assembly (part # C0861-512) on top of a support about 48” tall. Attach one (1) Spar Assembly C1028-501 with metal stamp # 1 to the Spar Support Tab with metal stamp # 1. Attach one (1) Spar Assembly 1028-502 with metal stamp # 3 to the Spar Support Tab with metal stamp # 3. Attach with two (2) taper pins (part # 09-22- 0006), three (3) ¼-20 x 1 3/8” Hex Head Cap Screws (part # 07-38-6013), three (3) ¼” Lock Washers (part # 07-75-2006), six (6) ¼” Flat Washers (part # 07-75-3006) and three (3) ¼” hex nuts (part # 07-76-0006). Position and attach the flange of the waveguide to the corresponding flange in the WR-159 Feed Assembly with eight (8) ¼-20 x 1” Hex Head Cap Screws (part # 07- 38-6010), eight (8) ¼” Lock Washers (part # 07-75-2006), sixteen (16) ¼” Flat Washers (part # 07-75-3006), one (1) CPR-159 gasket (part # 08-01-0002) and eight (8) ¼” hex nuts (part # 07- 76-0006). Do not tighten at this time. See figure 5. Position the pre-assembled WR-159 feed assembly with spar assemblies attached over the corresponding clevis. Spar Assembly C1028-502 w/ metal stamp # 3 goes over the Spar Clevis Bracket w/ metal stamp # 3 and the Spar Assembly C1028-501 w/ metal stamp # 1 goes over the Spar Clevis Bracket w/ metal stamp # 1. Attach the Spar Assembly to the Spar Clevis Bracket with one (1) taper pin (part # 09-22-0006), one (1) 3/8-16 x 1 ½” Hex Head Cap Screw (part # 07-38-7014), one (1) 3/8” Lock Washer (part # 07-75-2007), two (2) 3/8” Flat Washers (part # 07-75-3007) and one (1) 3/8” Hex Nut (part # 07-76-3000). Repeat above procedure for spars #3 and #4. See figure 6.
ARA CONFIDENTIAL Page 14 of 19
Figure 5
ARA CONFIDENTIAL Page 15 of 19
Figure 6
Please Note: During any assembly or re-assembly, the Taper Pins must be inserted and tapped in before the hardware can be tightened! Taper pins are inserted per figures 7 and 8. Tighten hardware to 70 in-lbs.
ARA CONFIDENTIAL Page 16 of 19
Figure 7
Figure 8
Insert from this side
Insert from this side
Insert from this side
Insert from this side
Insert from this side
ARA CONFIDENTIAL Page 17 of 19
Figure 9 Figure 10
Figure 11
Waveguide # 1
Locate the end of the WR-159 Waveguide that extends through the multi-piece reflector. Position one (1) Waveguide Support Bracket (part # C0861-09) so the two holes w/ 5/16 – 18 helicoils inserted are exposed.
5/16-18 helicoils inserted
WR-159 waveguide
Mate flanges
ARA CONFIDENTIAL Page 18 of 19
Figure 12
Attach the waveguide support bracket to the bottom of the reflector with (2) 5/16-18 x 1” long hex head bolt (part # 07-38-9509) with (2) 5/16” lock washer (part # 07-75-2019) and (2) 5/16” flat washer (part # 07-75-3019) as shown in Figure 12. Tighten to 120 in-lbs.
Figure 13
Waveguide support bracket
5/16-18 H ex H ead bolt
ARA CONFIDENTIAL Page 19 of 19
Figure 14
After confirming that all hardware has been tightened, attach a waveguide clamp bracket (part # C0861-10) to the angle bracket with four (4) #8-32 x 5/8” long flat head pan screws (part # 07- 33-4007), four (4) #8 flat washers (part # 07-75-3004), four (4) #8 lock washers (part # 07-75- 2004), and four (4) #8-32 nuts (part # 07-76-0004) as shown in Figure 14. Tighten to 15 in-lbs.
REVISION HISTORY
Rev Description of Change Author Effective Date
X1 Preliminary John Barbuto 07/01/10
X2 Splice Plate hardware change from 1 ¼” to 1” long John Barbuto 07/12/10
Waveguide Clamp Bracket
WR-159 waveguide
| SGP_Remediation_SOW_IFSites_7.17.25 |
| Appendix A - Pic_Drawings |
| IF4 and IF5 |
| IF4&5 Radar pedestal |
| IF4&5 Radar lower half |
| IF4&5 Radar Base |
| IF4&5 Radar Dish |
| IF4&5 Radar Upper Half |
| IF4&5 Site Layout |
| IF4&5 Site Sketch |
| IF7 |
| IF8 and IF10 |
| SGP_Remediation_SOW_IFSites_7.17.25 |
| RadarAssembly |
| Contacts |
| Table of Contents |
| List of Figures |
| List of Tables |
| List of Abbreviations |
| 1 General Description |
| 1.1 Nomenclature used |
| 1.2 General information |
| 2 Daily Rounds |
| 2.1 General information |
| 2.2 Daily Round Checklist |
| 3 Operations |
| 3.1 Accessibility |
| 3.1.1 NoMachine |
| 3.1.2 Webpages |
| 3.1.3 GUIs |
| 3.2 Quick Check |
| 3.3 Basic Procedures |
| 3.3.1 Antenna Control |
| 3.3.2 Transmitter Control |
| 3.4 Daily Check Procedures |
| 3.4.1 Site |
| 3.4.2 Antenna |
| 3.4.3 Transmitter |
| 3.4.4 BITE |
| 3.4.5 UPS |
| 4 Preventative Maintenance and Repair |
| 4.1 Preventative Maintenance |
| 4.1.1 Checklist |
| 4.1.2 Weekly |
| 4.1.3 Monthly |
| 4.1.4 Quarterly |
| 4.1.5 Yearly |
| 4.2 Repair |
| 4.2.1 ACU Error Message |
| 4.2.2 Magnetron Faults |
| 4.2.3 Pedestal |
| 5 Parts List |
| Appendices |
| A C-band Scanning ARM Precipitation Radar |
| B Calculating the Transmitter Peak Power |
| B.1 Resistance |
| B.2 Duty Cycle |
| B.3 How much attenuation? |
File details come from the government source that posted it. Updated .