5-Consent of Surety-Change Order.pdf.pdf

PDF 648 KB Posted

Attached to
Roadway Resurfacing and Repair Contract
Solicitation number
IFB-25-00314
Issued by
Hillsborough County, Florida

About this file

This document is a Consent of Surety to Change Order form for a contract with Hillsborough County, Florida. The form is designed to acknowledge and approve modifications to an existing contract, specifically allowing changes to the contract amount (either increasing or decreasing) and/or extending the completion date by a specified number of calendar days. The surety company is confirming that its performance bond and/or payment bond will be accordingly adjusted to reflect these changes.

The document provides a standardized template for the surety to formally consent to a change order, including spaces for details such as the contract title, contractor (principal), surety, and agent information. The form includes a notarization section to be completed in Hillsborough County, Florida, with provisions for physical presence or online notarization. The document was last revised on 03.09.2020 and provides signature lines for authorized representatives of the surety, with options for signing as an authorized signature or as an attorney in fact.

View the file

Other files

File Type Posted
11-Substitute W9 Form.pdf.pdf PDF
19-IFB-25-00314 Bid Bond.doc DOC document
3-Allowance Authorization Release Form.pdf.pdf PDF
10-Insurance Certificate.doc.doc DOC document
20-Scope Of Work 9.12.25.pdf PDF
6-Contractors Affidavit for Payment of Debts and Claims.pdf.pdf PDF
25-IFB-25-00314 Agreement - 10.2.25.doc DOC document
4-Application for Payment.pdf.pdf PDF
9-Change Order Form.pdf.pdf PDF
26-Affidavit Of Compliance With SBE Goal 10.7.25.docx DOCX document
12-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
24-Attachment B - Insurance requirements - Updated.pdf PDF
22-IFB-25-00314 Payment Bond Updated 09.12.25.doc DOC document
8-Consent of Surety to Final Payment.pdf.pdf PDF
21-Special Conditions and Supplemental Specs R1 20250910 LIJ LAD 9.12.25.pdf PDF
17-Exhibit 4 HCTDM 23-01 Pavement Marking Removal-2.13R LAD.pdf PDF
13-Attachment A - Sign Specs YR2022 LAD.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
15-Exhibit 2 PW HCDM 2105 Speed Hump Replacement Policy - 2.08R LAD.pdf PDF
29-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 09.30.25.docx DOCX document
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
7-Subcontractors Statement of Satisfaction.pdf.pdf PDF
23-IFB-25-00314 Performance Bond Updated 09.12.25.doc DOC document
16-Exhibit 3 Intersection Valley Gutter Typical Details -2.11R.pdf PDF
28-Subcontractor Letter of Intent.Final.pdf PDF
18-Exhibit 5 - Technical Specifications -HC Full Depth Reclamation with Asphalt Emulsion 8.4.25.pdf PDF
27-SBE Subcontractors Material Suppliers List SBE-1 Form. Final.pdf PDF
14-Exhibit 1 Traffic Control Officer-2.03R.pdf PDF
30-1. IFB-25-00314 Terms and Conditions.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSENT OF SURETY TO CHANGE ORDER

CONTRACT TITLE:

CONTRACTOR (PRINCIPAL):

SURETY:

AGENT:

The SURETY does hereby acknowledge and agree to Change Order No. to the above referenced contract with Hillsborough County, the contract amount

(increasing/decreasing) by $ , and/or extending the completion date by ( ) calendar days. The SURETY further acknowledges that the performance bond and/or payment bond furnished under the aforementioned contract is accordingly changed to reflect the change in contract amount, and/or time included in Change Order No. .

This Consent is dated this day of , 20 .

SURETY:

BY: (SEAL)

Authorized Signature

-OR-

BY: (SEAL)

As Attorney in Fact (Attach Power of Attorney)

Printed Name

STATE OF FLORIDA

COUNTY OF HILLSBOROUGH

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this ___ day of ____________, 20___, __________________________ by (Name of person)

________________________ for _________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Know OR Produced Identification

Type of Identification Produced __________________

Revised 03.09.2020