27-SBE Subcontractors Material Suppliers List SBE-1 Form. Final.pdf

PDF 115 KB Posted

Attached to
Roadway Resurfacing and Repair Contract
Solicitation number
IFB-25-00314
Issued by
Hillsborough County, Florida

About this file

This document is a Hillsborough County Small Business Encouragement Program form (SBE-1) for listing subcontractors and material suppliers on construction contracts. The form is designed for bidders to document their use of registered Small Business Enterprise (SBE) subcontractors and material suppliers, with detailed requirements for listing each subcontractor or supplier, including their business name, scope of work, work item number, and estimated dollar amount. The form specifically notes that material suppliers who do not manufacture supplies will be partially credited at 50% towards the project's SBE participation goal.

The document emphasizes the critical nature of completing this form accurately, warning that a bidder's failure to meet the requirements may result in their entire bid being rejected. The form provides spaces for listing both registered SBE subcontractors/material suppliers and non-SBE subcontractors/material suppliers, with the understanding that all SBE firms listed as "registered" must be either registered with Hillsborough County or have a reciprocal registration as specified in the county's solicitation document. For work order or term contracts, the estimated dollar amount may be left blank, providing flexibility in the bidding process.

View the file

Other files

File Type Posted
11-Substitute W9 Form.pdf.pdf PDF
19-IFB-25-00314 Bid Bond.doc DOC document
3-Allowance Authorization Release Form.pdf.pdf PDF
10-Insurance Certificate.doc.doc DOC document
20-Scope Of Work 9.12.25.pdf PDF
6-Contractors Affidavit for Payment of Debts and Claims.pdf.pdf PDF
25-IFB-25-00314 Agreement - 10.2.25.doc DOC document
4-Application for Payment.pdf.pdf PDF
9-Change Order Form.pdf.pdf PDF
26-Affidavit Of Compliance With SBE Goal 10.7.25.docx DOCX document
12-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
24-Attachment B - Insurance requirements - Updated.pdf PDF
22-IFB-25-00314 Payment Bond Updated 09.12.25.doc DOC document
8-Consent of Surety to Final Payment.pdf.pdf PDF
21-Special Conditions and Supplemental Specs R1 20250910 LIJ LAD 9.12.25.pdf PDF
17-Exhibit 4 HCTDM 23-01 Pavement Marking Removal-2.13R LAD.pdf PDF
13-Attachment A - Sign Specs YR2022 LAD.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
15-Exhibit 2 PW HCDM 2105 Speed Hump Replacement Policy - 2.08R LAD.pdf PDF
29-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 09.30.25.docx DOCX document
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
7-Subcontractors Statement of Satisfaction.pdf.pdf PDF
23-IFB-25-00314 Performance Bond Updated 09.12.25.doc DOC document
16-Exhibit 3 Intersection Valley Gutter Typical Details -2.11R.pdf PDF
28-Subcontractor Letter of Intent.Final.pdf PDF
18-Exhibit 5 - Technical Specifications -HC Full Depth Reclamation with Asphalt Emulsion 8.4.25.pdf PDF
14-Exhibit 1 Traffic Control Officer-2.03R.pdf PDF
5-Consent of Surety-Change Order.pdf.pdf PDF
30-1. IFB-25-00314 Terms and Conditions.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBE – 1 FORM

(Revised 10/2025)

HILLSBOROUGH COUNTY

SMALL BUSINESS ENCOURAGEMENT PROGRAM

SUBCONTRACTORS/MATERIAL SUPPLIERS LIST – CONSTRUCTION CONTRACTS (SBE-1 FORM)

BID NO.: BIDDER NAME:

List all registered Small Business Enterprise (SBE) subcontractors/material suppliers1 to be utilized on this project.

Include business name, scope of work/work item number to be performed, and estimated dollar amount of each item.

If the solicitation is a “Work Order/Term Contract”, the “Estimated Dollar Amount” may be left blank. All SBEs that are listed as “registered” must either be registered with Hillsborough County or have reciprocal registration as specifically set forth in the County’s solicitation document.

A Bidders failure to complete the requirements of this page may result in their entire Bid being rejected.

Registered SBE Subcontractors/Material Suppliers Scope of Work / Work Item Number Estimated

Dollar Amount

1Material Suppliers: Registered SBE firms that furnish supplies for Construction projects, but do not manufacture the supplies, will be partially credited at fifty percent (50%) towards the project’s SBE participation goal.

List all other subcontracted scope of work or work item numbers to be performed by non-registered SBE subcontractors/material suppliers on this project and estimated dollar amount of each item:

Non-SBE Subcontractors/Material Suppliers Scope of Work / Work Item Number Estimated

Dollar Amount

BID NO:
BIDDER NAME:
Scope of Work Work Item NumberRow1:
Estimated Dollar AmountRow1:
Scope of Work Work Item NumberRow2:
Estimated Dollar AmountRow2:
Scope of Work Work Item NumberRow3:
Estimated Dollar AmountRow3:
Scope of Work Work Item NumberRow4:
Estimated Dollar AmountRow4:
Scope of Work Work Item NumberRow5:
Estimated Dollar AmountRow5:
Scope of Work Work Item NumberRow6:
Estimated Dollar AmountRow6:
Scope of Work Work Item NumberRow7:
Estimated Dollar AmountRow7:
Scope of Work Work Item NumberRow8:
Estimated Dollar AmountRow8:
Scope of Work Work Item NumberRow1_2:
Estimated Dollar AmountRow1_2:
NonSBE SubcontractorsMaterial SuppliersRow2:
Scope of Work Work Item NumberRow2_2:
Estimated Dollar AmountRow2_2:
NonSBE SubcontractorsMaterial SuppliersRow3:
Scope of Work Work Item NumberRow3_2:
Estimated Dollar AmountRow3_2:
NonSBE SubcontractorsMaterial SuppliersRow4:
Scope of Work Work Item NumberRow4_2:
Estimated Dollar AmountRow4_2:
NonSBE SubcontractorsMaterial SuppliersRow5:
Scope of Work Work Item NumberRow5_2:
Estimated Dollar AmountRow5_2:
NonSBE SubcontractorsMaterial SuppliersRow6:
Scope of Work Work Item NumberRow6_2:
Estimated Dollar AmountRow6_2:
NonSBE SubcontractorsMaterial SuppliersRow7:
Scope of Work Work Item NumberRow7_2:
Estimated Dollar AmountRow7_2:
NonSBE SubcontractorsMaterial SuppliersRow8:
Scope of Work Work Item NumberRow8_2:
Estimated Dollar AmountRow8_2:
NonSBE SubcontractorsMaterial SuppliersRow1:
SBE SubcontractorsMaterial SuppliersRow1:
SBE SubcontractorsMaterial SuppliersRow3:
SBE SubcontractorsMaterial SuppliersRow4:
SBE SubcontractorsMaterial SuppliersRow2:
SBE SubcontractorsMaterial SuppliersRow6:
SBE SubcontractorsMaterial SuppliersRow7:
SBE SubcontractorsMaterial SuppliersRow5:
SBE SubcontractorsMaterial SuppliersRow8:

File details come from the government source that posted it. Updated .