This document is a Hillsborough County, Florida Construction Application for Payment form, which serves as a comprehensive payment request document for a construction project. The multi-page form includes sections for the contractor to detail work completed, materials stored, contract modifications, and financial tracking. The form requires detailed documentation including a Schedule of Values, Attachment 1 and Attachment 2 for recording any disputes or special circumstances related to subcontractors, suppliers, or line items.

The application provides a structured process for contractors to request payment by certifying the accuracy of work completed, materials supplied, and financial transactions. It includes certification sections for both the contractor and Hillsborough County representatives, with spaces for signatures from project managers, inspectors, resident engineers, and other county officials. The form is designed to ensure transparency, accountability, and proper documentation of progress payments, with specific provisions for tracking contract changes, stored materials, retainage, and progressive billing throughout the project's duration.

View the file

Other files

File Type Posted
11-Substitute W9 Form.pdf.pdf PDF
19-IFB-25-00314 Bid Bond.doc DOC document
3-Allowance Authorization Release Form.pdf.pdf PDF
10-Insurance Certificate.doc.doc DOC document
20-Scope Of Work 9.12.25.pdf PDF
6-Contractors Affidavit for Payment of Debts and Claims.pdf.pdf PDF
25-IFB-25-00314 Agreement - 10.2.25.doc DOC document
9-Change Order Form.pdf.pdf PDF
26-Affidavit Of Compliance With SBE Goal 10.7.25.docx DOCX document
12-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
24-Attachment B - Insurance requirements - Updated.pdf PDF
22-IFB-25-00314 Payment Bond Updated 09.12.25.doc DOC document
8-Consent of Surety to Final Payment.pdf.pdf PDF
21-Special Conditions and Supplemental Specs R1 20250910 LIJ LAD 9.12.25.pdf PDF
17-Exhibit 4 HCTDM 23-01 Pavement Marking Removal-2.13R LAD.pdf PDF
13-Attachment A - Sign Specs YR2022 LAD.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
15-Exhibit 2 PW HCDM 2105 Speed Hump Replacement Policy - 2.08R LAD.pdf PDF
29-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 09.30.25.docx DOCX document
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
7-Subcontractors Statement of Satisfaction.pdf.pdf PDF
23-IFB-25-00314 Performance Bond Updated 09.12.25.doc DOC document
16-Exhibit 3 Intersection Valley Gutter Typical Details -2.11R.pdf PDF
28-Subcontractor Letter of Intent.Final.pdf PDF
18-Exhibit 5 - Technical Specifications -HC Full Depth Reclamation with Asphalt Emulsion 8.4.25.pdf PDF
27-SBE Subcontractors Material Suppliers List SBE-1 Form. Final.pdf PDF
14-Exhibit 1 Traffic Control Officer-2.03R.pdf PDF
5-Consent of Surety-Change Order.pdf.pdf PDF
30-1. IFB-25-00314 Terms and Conditions.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HILLSBOROUGH COUNTY

APPLICATION FOR PAYMENT

(SECTION I) PAGE ONE OF PAGE(S)

PROJECT: APPLICATION NO.:

APPLICATION DATE:

CIP NO.: BID NO.: FOR PERIOD FROM:

TO:

CONTRACTOR:

CHANGE ORDER SUMMARY CONTRACT STATUS

ORIGINAL CONTRACT SUM $

NET CHANGE BY CHANGE ORDERS

(COLUMN 3 MINUS COLUMN 4) $

CONTRACT SUM TO DATE $

1 2 3 4

NO.

DATE APPROVED BY

COUNTY ADDITIVE DEDUCTIVE

VALUE OF WORK IN PLACE $

VALUE OF STORED MATERIALS $

TOTAL EARNED $

RETAINAGE AT % $

TOTAL EARNED LESS RETAINAGE $

LESS PREVIOUS PAYMENTS $

LESS $

CURRENT PAYMENT DUE $ TOTALS

(SECTION II) CERTIFICATION BY CONTRACTOR

The undersigned Contractor certifies:

1) All amounts and items shown on this application are correct.

2) Any work performed or materials supplied have been done in accordance with the contract documents.

3) That the contractor has clear title to any materials or equipment for which the contractor is requesting payment as stored materials.

4) All amounts paid by the County to the Contractor in previous progress payments have been applied by the Contractor and its subcontractors to promptly pay, in proportionate amounts, all subcontractors, suppliers, and others who have contributed work or materials listed in the Schedule of Values of the previous Payment Applications, except as indicated on Attachment 1, which is incorporated herein, consisting of _____ page(s).

5) The Contractor will apply any sums paid by the County from this Application for Payment to subcontractors, material, suppliers, and others who have contributed work or materials included in the line items referenced in the attached Schedule of Values (less retainage, if applicable) except as indicated on Attachment 2, which is incorporated herein, consisting of ____ page(s).

CONTRACTOR:

BY:

(Title) (Date)

ATTEST:

State of __________ County of__________

Sworn to (or affirmed) and subscribed before me, by means of_ ___ ____physical presence or ____online notarization, this ____ day of ___________, 20___, by ________________________________________.

Notary Public:

My Commission Expires:

SEAL)

Personally Known OR Produced Identification Type of Identification Produced ______________________

Revised 04.20.2020

(SECTION III) CERTIFICATION BY HILLSBOROUGH COUNTY AND REPRESENTATIVES

Based on on-site observations and the data comprising this Application for Payment, the undersigned certifies that the Work has progressed to the point indicated herein and to the best of my knowledge, information and belief is in accordance with the Contract Documents and that the CONTRACTOR is entitled to payment of the amount certified herein.

Hillsborough County INSPECTOR: DATE Hillsborough County RESIDENT ENGINEER: DATE Hillsborough County PROJECT MANAGER: DATE Hillsborough County SECTION MANAGER*: DATE

(*applicable if Project Manager is a temporary employee, consultant, or 50% of payment application; otherwise N/A)

COUNTY REPRESENTATIVE:

PROFESSIONAL CONSULTANT:

BY: DATE

(See Instructions on Back)

HILLSBOROUGH COUNTY'S CONSTRUCTION APPLICATION

FOR PAYMENT INSTRUCTION

The purpose of this form is to facilitate the summary information for Hillsborough County's Construction Application for Payment. This form will be completed by the Contractor each time payment is requested for a project. This Application for Payment will be accompanied by a Schedule of Values (which provides line-item detail information for the project), Attachment 1, and Attachment 2.

SECTION I: This section will be completed by the Contractor. The Contractor will provide the information as indicated on the form.

SECTION II: This section will be completed by the Contractor. In this section, the Contractor will provide certification about the information provided in Section I. The certification will be provided in accordance with the construction Contract Documents.

SECTION III: This section will be completed to provide approval by Hillsborough County staff and/or its representative(s). Under the approval section by Hillsborough County staff:

signature/approval by a County Project Manager will always be provided. However, the signature for the Resident Engineer or the Inspector will only be provided if the County is responsible for these functions. When the County is not responsible for these functions, the approval will indicate "N/A".

Under the approval section by Hillsborough County's Representative: signature/approval will be provided by a Construction Manager when applicable. Additionally, signature/approval may also be provided by a Professional when applicable. When there is no Construction Manager or Professional responsible for such activities then the approval will indicate "N/A".

PAGE ONE OF PAGE(S)

PROJECT: ATTACHMENT 1

CIP NO: BID NO: APPLICATION NO.:

APPLICATION DATE:

CONTRACTOR: FOR PERIOD FROM:

TO:

Name of Entity Relationship

Amount in Dispute

Application for Payment No. or corresponding line item reference to Schedule of Values Explanation

-or-

This page [ ] is [ ] is not applicable.

Contractor Signature

PAGE ONE OF PAGE(S)

PROJECT: ATTACHMENT 2

CIP NO: BID NO: APPLICATION NO.:

APPLICATION DATE:

CONTRACTOR: FOR PERIOD FROM:

TO:

Name of Entity Relationship

Amount in Dispute

Corresponding line item reference to Schedule of Values Explanation

-or-

This page [ ] is [ ] is not applicable.

Contractor Signature

HILLSBOROUGH COUNTY, FLORIDA

APPLICATION FOR PAYMENT PAGE OF PAGES

SCHEDULE OF VALUES

PROJECT NO. APPLICATION NO.

PROJECT: APPLICATION DATE:

BID NO. FOR PERIOD FROM:

CONTRACTOR: TO:

A B C D E F G H I J K L M N O P

Item No. Description Of Work Unit Price

CONTRACT SUM TO DATE WORK IN PLACE STORED MATERIALS

Comp

CONTRACT AAR APPLICATIONS CHANGE ORDER APPLICATIONS

Quantity Value Quantity Value Quantity Value No. Quantity Value No. Quantity Value

PAGE TOTALS:

CUMULATIVE TOTALS:

CHANGE ORDER SUMMARY
CONTRACT STATUS
DEDUCTIVE
VALUE OF WORK IN PLACE $
TOTALS
Entity
Relationship
Dispute
Application for
Payment No. or
corresponding line
item reference to
Schedule of Values
Explanation
Entity
Dispute
Schedule of Values
Explanation
ADDITIVE
FOR PAYMENT INSTRUCTION