About this file

This document includes a pricing sheet and solicitation for construction services. The General Services Administration is seeking a Construction Manager as Constructor to provide design and construction phase services for renovations at the Anthony J. Celebrezze Federal Building in Cleveland, Ohio. The project scope includes renovating floors 9 through 13 for the Veterans Benefits Administration, backfilling the vacated 13th floor with other federal agencies, and upgrading building systems across affected floors. Additionally, the solicitation requests pricing to renovate floors 14 and 22 through 29 for the Defense Finance and Accounting Service consolidation project. Offerors should submit pricing for design and construction phase services by firm fixed price, along with proposed contingency amounts, fees, and markups. The total estimated construction cost ranges from $50 million to $70 million, with an award date anticipated in February 2021 and performance period of approximately five years. Responses are due on or around October 19, 2020.

View the file

Other files

File Type Posted
47PF0020R0063 Celebrezze VBA_DFAS - Q and A 10.15.20 Final .pdf PDF
47PF0020R0063 - Amendment 005.pdf PDF
47PF0020R0063 Celebrezze VBA.DFAS Q.andA. 61-99 10.09.2020.pdf PDF
47PF0020R0063 Amendment 004.pdf PDF
VBA -DFAS CMc Pre-Proposal Minutes - Final.pdf PDF
SF1442-14b R1.pdf PDF
47PF0020R0063 Celebrezze VBA_DFAS - Q and As .pdf PDF
47PF0020R0063 - Amendment 003.pdf PDF
Rules and Regulations Governing Conduct on Federal Property 2005 Version.pdf PDF
13.1 AJC Building access master format (blank) .xlsx XLSX spreadsheet
2020.1002.GSA-AJC-VBA.CMC Pre-Proposal Slides.pdf PDF
General Contractor information (AJC).pdf PDF
VBA DFAS Pre-proposal Questions and Answers.pdf PDF
VBA_DFAS Pre-proposal Agenda - Final.pdf PDF
47PF0020R0063 - Amendment 002.pdf PDF
Site Visit Request Form -VBA_DFAS Project -Final.pdf PDF
Pre-proposal Attendance 09.29.2020.pdf PDF
47PF0020R0063 - Amendment 001.pdf PDF
VBA-DFAS Pricing Sheet - Final (1442 Attachment).pdf PDF
Appendix A_1 HSPD12_Handbook_v8.pdf PDF
CMc Reps and Certs 9-15-20 Celebrezze VBA-DFAS.pdf PDF
Appendix A_2 PBS_3490.3_CIU.pdf PDF
018111a KSP Construction Product Tracking Form.pdf PDF
CIO_IT_Security_09-48.pdf PDF
CMc Solicitation 9-15-20 Celebrezze VBA-DFAS.pdf PDF
CIO 12-2018_ IT Policy Requirements Guide_0.pdf PDF
AJC VBA _ DFAS_CMc SOW_2020.09.09.02_FINAL.pdf PDF
CMc Agreement 9-15-20 Celebrezze VBA-DFAS.pdf PDF
Past Performance Questionnaire - VBA-DFAS.pdf PDF
Wage Determination OH20200074.txt TXT text file
SF1442-14b.pdf PDF
Model_Subcontracting_Plan_Updated Apr 2020.pdf PDF
SF24-16d.pdf PDF
GSA527-15e.pdf PDF
Celebrezze VBA_DFAS CMc Pre-Proposal RSVP Form - Final.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICING SHEET - PART 1 OF 2

CMc for the Anthony J. Celebrezze - (VBA) Renovation and Backfill Project, and (DFAS) Consolidation Project, Solicitation # 47PF0020R0063 - Revision 1

Construction Manager as Constructor Price Offer

Item

Service Description Price

1 Base: Design Phase Services Firm Fixed Price (FFP) (VBA) $

2 Option 1: Construction Phase (Estimated cost of Work) (VBA) $

3 Option 1 : CMc Construction Contingency Allowance (CCA) Percentage (VBA) 3%

4 Option 1: CMc Construction Contingency Allowance (line 2 x line 3) (VBA) $

5 Option 1 : Fee Percentage (Overhead and Profit) (VBA) %

Option 1 : Fee (line 2 x line 5)

7 Option 1: Guaranteed Maximum Price (GMP) (2+4+6) (VBA) $

8 Option 2: Design Phase Services Firm Fixed Price (FFP) (DFAS) $

9 Option 3: Construction Phase (Estimated Cost of Work) (DFAS) $

10 Option 3: CMc Construction Contingency Allowance (CCA) Percentage (DFAS) 3%

11 Option 3: CMc Construction Contingency Allowance (line 9 x line 10) (DFAS) $

12 Option 3 : Fee Percentage (Overhead and Profit) (DFAS) %

13 Option 3: Fee (line 9 x line 12) $

14 Option 3: Guaranteed Maximum Price (GMP) (9+11+13) (DFAS) $

Total Evaluated Price (1+7+8+14): $

15. Overhead Rate for Contract Changes

16. Profit Rate for Contract Changes. Note: can not exceed 10%

17.

Markups on Subcontractors for Contract Changes = ½ X (line 15+ line 16)

Note: This formula is per the Equitable Adj Clause and can not exceed 10%

Note: For Items 15, 16 and 17, see the attached Equitable Adjustment chart for further explanation

PRICING SHEET - PART 2 OF 2

Construction Manager as Constructor (CMc) for the Anthony J. Celebrezze - Veterans Benefits Administration (VBA) Renovation and Backfill Project, and Defense Finance and Accounting Service (DFAS) Consolidation Project.

Solicitation # 47PF0020R0063

WORKSHEET

(Breakout of Environmental Costs for VBA and Breakout of DFAS Price Per Floor and Environmental Costs Per Floor)

Item# Description Total $

1 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for VBA)

2 Floor 14 cost (This cost should be part of the GMP for DFAS) $

3 Floor 14 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)

4 Floor 22 cost (This cost should be part of the GMP for DFAS) $

5 Floor 22 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)

6 Floor 24 cost (This cost should be part of the GMP for DFAS) $

7 Floor 24 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)

8 Floor 25 cost (This cost should be part of the GMP for DFAS) $

9 Floor 25 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)

10 Floor 28 cost (This cost should be part of the GMP for DFAS) $

11 Floor 28 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)

12 Floor 29 cost (This cost should be part of the GMP for DFAS) $

13 Floor 29 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)

552.243-71 EQUITABLE ADJUSTMENTS CLAUSE - FOR REFERENCE

Markups Prime Sub Tier 1 Sub Tier 2 Sub Tier 3

Overhead

Negotiated, and may be subject to audit and adjustment. Only applied to Primes self performed work

At 50% of OH And Profit negotiated with Prime, but not to exceed 10% combined Only allowed on subs direct cost. Not allowed on subs profit and

OH

At 50% of OH And Profit negotiated with Prime, but not to exceed 10% combined Only allowed on subs direct cost. Not allowed on subs profit and

OH

Not Allowed

Profit

Negotiated, but not to exceed 10%, Applied only to Prime's self performed DC + Prime's OH Not Allowed

Bond & Insurance - if a direct cost of prime and not part of OH

Calculated after OH and Profit are applied, if premium computed based on Total Contract Value. But cannot be applied if they are already included in the OH rate.

Notes, per the Equitable Adjustments Clause 552.243-71:

1. The Prime and its subcontractors shall not be allowed OH and profit on the OH or profit received by a subcontractor

2. The Prime can only apply OH rate to self performed work