VBA-DFAS Pricing Sheet - Final R1.pdf
PDF 84 KB Posted
- Solicitation number
- 47PF0020R0063
About this file
This document includes a pricing sheet and solicitation for construction services. The General Services Administration is seeking a Construction Manager as Constructor to provide design and construction phase services for renovations at the Anthony J. Celebrezze Federal Building in Cleveland, Ohio. The project scope includes renovating floors 9 through 13 for the Veterans Benefits Administration, backfilling the vacated 13th floor with other federal agencies, and upgrading building systems across affected floors. Additionally, the solicitation requests pricing to renovate floors 14 and 22 through 29 for the Defense Finance and Accounting Service consolidation project. Offerors should submit pricing for design and construction phase services by firm fixed price, along with proposed contingency amounts, fees, and markups. The total estimated construction cost ranges from $50 million to $70 million, with an award date anticipated in February 2021 and performance period of approximately five years. Responses are due on or around October 19, 2020.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING SHEET - PART 1 OF 2
CMc for the Anthony J. Celebrezze - (VBA) Renovation and Backfill Project, and (DFAS) Consolidation Project, Solicitation # 47PF0020R0063 - Revision 1
Construction Manager as Constructor Price Offer
Item
Service Description Price
1 Base: Design Phase Services Firm Fixed Price (FFP) (VBA) $
2 Option 1: Construction Phase (Estimated cost of Work) (VBA) $
3 Option 1 : CMc Construction Contingency Allowance (CCA) Percentage (VBA) 3%
4 Option 1: CMc Construction Contingency Allowance (line 2 x line 3) (VBA) $
5 Option 1 : Fee Percentage (Overhead and Profit) (VBA) %
Option 1 : Fee (line 2 x line 5)
7 Option 1: Guaranteed Maximum Price (GMP) (2+4+6) (VBA) $
8 Option 2: Design Phase Services Firm Fixed Price (FFP) (DFAS) $
9 Option 3: Construction Phase (Estimated Cost of Work) (DFAS) $
10 Option 3: CMc Construction Contingency Allowance (CCA) Percentage (DFAS) 3%
11 Option 3: CMc Construction Contingency Allowance (line 9 x line 10) (DFAS) $
12 Option 3 : Fee Percentage (Overhead and Profit) (DFAS) %
13 Option 3: Fee (line 9 x line 12) $
14 Option 3: Guaranteed Maximum Price (GMP) (9+11+13) (DFAS) $
Total Evaluated Price (1+7+8+14): $
15. Overhead Rate for Contract Changes
16. Profit Rate for Contract Changes. Note: can not exceed 10%
17.
Markups on Subcontractors for Contract Changes = ½ X (line 15+ line 16)
Note: This formula is per the Equitable Adj Clause and can not exceed 10%
Note: For Items 15, 16 and 17, see the attached Equitable Adjustment chart for further explanation
PRICING SHEET - PART 2 OF 2
Construction Manager as Constructor (CMc) for the Anthony J. Celebrezze - Veterans Benefits Administration (VBA) Renovation and Backfill Project, and Defense Finance and Accounting Service (DFAS) Consolidation Project.
Solicitation # 47PF0020R0063
WORKSHEET
(Breakout of Environmental Costs for VBA and Breakout of DFAS Price Per Floor and Environmental Costs Per Floor)
Item# Description Total $
1 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for VBA)
2 Floor 14 cost (This cost should be part of the GMP for DFAS) $
3 Floor 14 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)
4 Floor 22 cost (This cost should be part of the GMP for DFAS) $
5 Floor 22 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)
6 Floor 24 cost (This cost should be part of the GMP for DFAS) $
7 Floor 24 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)
8 Floor 25 cost (This cost should be part of the GMP for DFAS) $
9 Floor 25 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)
10 Floor 28 cost (This cost should be part of the GMP for DFAS) $
11 Floor 28 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)
12 Floor 29 cost (This cost should be part of the GMP for DFAS) $
13 Floor 29 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)
552.243-71 EQUITABLE ADJUSTMENTS CLAUSE - FOR REFERENCE
Markups Prime Sub Tier 1 Sub Tier 2 Sub Tier 3
Overhead
Negotiated, and may be subject to audit and adjustment. Only applied to Primes self performed work
At 50% of OH And Profit negotiated with Prime, but not to exceed 10% combined Only allowed on subs direct cost. Not allowed on subs profit and
OH
At 50% of OH And Profit negotiated with Prime, but not to exceed 10% combined Only allowed on subs direct cost. Not allowed on subs profit and
OH
Not Allowed
Profit
Negotiated, but not to exceed 10%, Applied only to Prime's self performed DC + Prime's OH Not Allowed
Bond & Insurance - if a direct cost of prime and not part of OH
Calculated after OH and Profit are applied, if premium computed based on Total Contract Value. But cannot be applied if they are already included in the OH rate.
Notes, per the Equitable Adjustments Clause 552.243-71:
1. The Prime and its subcontractors shall not be allowed OH and profit on the OH or profit received by a subcontractor
2. The Prime can only apply OH rate to self performed work