This document provides details on a federal contract opportunity for construction manager as constructor services. The General Services Administration is seeking these services for the Anthony J. Celebrezze Veterans Benefits Administration renovation and backfill project in Cleveland, Ohio, as well as the Defense Finance and Accounting Service consolidation project at the same location. The estimated total construction costs for the VBA project are between $50-70 million, with construction to begin in February 2021 and last approximately 5 years. The contract is for management, supervision, labor, equipment, and supplies for interior renovations, upgrades to building systems, and hazardous material abatement on various floors housing multiple federal agencies. The pre-proposal conference will be held virtually on September 29, 2020, with proposals due on October 19, 2020. The award will be made based on technical evaluation factors and total price to the responsible offeror providing the best value to the government.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
building overview1
West Plaza 2008
Glass Overclad 2014
250’
35,000 gsf building overview
Elevator Lobby
Building Lobby
East Entrance
Tenant Space
5th
13th
9-12th
DOL
Dept. of Labor
DOE
Dept. of Education
VBA
Veterans Benefits
Administration
RRB
Railroad
Retirement Board
US NAVY
US ARMY
OFFSITE
N
OFFSITE
7th
VBA project
925 170,000 USF
VBA project
Proposed Corner Lounge Area
Proposed Conference Room
Proposed Break Room
Proposed Open Office Area
VBA project
Proposed Elevator Lobby
Proposed Suite Entrance Area
The Design Team is proposing limited biophilia at the primary suite entrances on floors 913 only. This biophilia has not been designed or approved yet, and it may include natural wood finishes with no plantings, live plantings, synthetic plantings, or any combination thereof.
Confirmation of the biophilia design and scope will occur in Design Development.