- 47PF0020R0063
About this file
This document contains a solicitation for construction manager as constructor services for renovation projects at the Anthony J. Celebrezze Federal Building in Cleveland, Ohio. The selected contractor will provide management, supervision, labor, equipment and supplies for renovations to floors 9-13 and the backfill of floor 13 for the Veterans Benefits Administration project, as well as renovations to floors 14, 22, 24, 25, 28 and 29 for the Defense Finance and Accounting Service consolidation. Renovation scopes include interior remodels, upgrades to major building systems and asbestos abatement. The solicitation requests pricing for design and construction phase services for both projects, with a total estimated construction cost ranging from $50-70 million and an anticipated construction contract award date of February 2021. Offers are due by October 19, 2020 and joint ventures will be considered. The contracting agency is the General Services Administration and federal tenants involved include the Veterans Benefits Administration, Department of Labor, Department of Education and Defense Finance and Accounting Service.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction Manager as Constructor (CMc) for the Anthony J. Celebrezze - Veterans Benefits Administration (VBA) Renovation and Backfill Project, and Defense Finance and Accounting Service (DFAS) Consolidation Project.
Solicitation # 47PF0020R0063
Construction Manager as Constructor Price Offer
Item
Service Description Price
1 Base: Design Phase Services Firm Fixed Price (FFP) (VBA) $
2 Option 1: Construction Phase (Estimated cost of Work) (VBA) $
3 Option 1 : CMc Construction Contingency Allowance (CCA) Percentage (VBA) 3%
4 Option 1: CMc Construction Contingency Allowance (line 2 x line 3) (VBA) $
5 Option 1 : Fee (VBA) $
6 Option 1: Guaranteed Maximum Price (GMP) (2+4+5) (VBA) $
7 Option 2: Design Phase Services Firm Fixed Price (FFP) (DFAS) $
8 Option 3: Construction Phase (Estimated Cost of Work) (DFAS) $
9 Option 3: CMc Construction Contingency Allowance (CCA) Percentage (DFAS) 3%
10 Option 3: CMc Construction Contingency Allowance (line 8 x line 9) (DFAS) $
11 Option 3 : Fee (DFAS) $
12 Option 3: Guaranteed Maximum Price (GMP) (8+10+11) (DFAS) $
Total Evaluated Price (1+6+7+12): $
Construction Manager as Constructor (CMc) for the Anthony J. Celebrezze - Veterans Benefits Administration (VBA) Renovation and Backfill Project, and Defense Finance and Accounting Service (DFAS) Consolidation Project.
Solicitation # 47PF0020R0063
WORKSHEET
(Breakout of Environmental Costs for VBA and Breakout of DFAS Price Per Floor and Environmental Costs Per Floor)
Item# Description Total $
1 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for VBA)
2 Floor 14 cost (This cost should be part of the GMP for DFAS) $
3 Floor 14 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)
4 Floor 22 cost (This cost should be part of the GMP for DFAS) $
5 Floor 22 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)
6 Floor 24 cost (This cost should be part of the GMP for DFAS) $
7 Floor 24 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)
8 Floor 25 cost (This cost should be part of the GMP for DFAS) $
9 Floor 25 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)
10 Floor 28 cost (This cost should be part of the GMP for DFAS) $
11 Floor 28 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)
12 Floor 29 cost (This cost should be part of the GMP for DFAS) $
13 Floor 29 ENVIRONMENTAL abatement cost only (This cost should be part of the GMP for DFAS)
File details come from the government source that posted it. Updated .