018111 Sustainable Design Requirements FY15 Update Oct. 1 2014.pdf

PDF 22 KB Posted

Attached to
Construction Contract for the Customs and Border Protection Seized Cargo Facility Federal contract opportunity
Solicitation number
47PF0020R0040
Issued by
General Services Administration Public Buildings Service Region 5

About this file

This announcement solicits proposals for a construction contract to provide general contracting services for a Customs and Border Protection seized cargo facility project in Detroit, Michigan. The General Services Administration Great Lakes Region 5 will competitively award an approximately $1-5 million firm-fixed-price contract set aside for 8(a) businesses to renovate existing office spaces, construct a new annex and seizure processing area, and complete associated site improvements. The selected contractor will work with GSA and its selected architect/engineer and construction manager as agent/commissioning agent on the project, which includes precast concrete structures, renovation and new construction logistics on a constrained site, selective demolition, tenant improvements, security and IT infrastructure, and HVAC modifications. Proposals are due August 25, 2020 and award is anticipated in January 2021. Interested parties should monitor the beta.SAM.gov website for the full solicitation package releasing on or around July 14, 2020 and attend the virtual pre-proposal conference on July 22, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to Construction Contract for the Customs and Border Protection Seized Cargo Facility, newest first.
File Type Posted
47PF0020R0040 - Amendment 08.pdf PDF
47PF0020R0040 - Amendment 07.pdf PDF
CBP Vault Solicitation RFIs 09-01-2020.pdf PDF
47PF0020R0040 - Amendment 06.pdf PDF
47PF0020R0040 - Amendment 05.pdf PDF
099600 - High-Performance Coatings.pdf PDF
CBP Vault Solicitation RFIs 8.25.2020.pdf PDF
47PF0020R0040 - Amendment 04.pdf PDF
GC Reps and Certs Aug 2020 r1 8-19-2020.pdf PDF
CBP Vault Amendment 04 - Language.pdf PDF
CBP Site Visit Attendance.pdf PDF
CBP Vault Solicitation RFIs 8.19.2020.pdf PDF
47PF0020R0040 - Amendment 03.pdf PDF
CBP Vault Solicitation RFIs - Amendment 03.pdf PDF
CIO_P_21001I__CHGE_1_GSA_Information_Technology_IT_Security_Policy__Signed_on_10-20-2015.pdf PDF
CBP Pre-proposal Agenda - Final.pdf PDF
David Bacon Wage Rates MI20190101 7.24.2020.pdf PDF
Pre. Prop. Attendance Sheet.pdf PDF
KSP Construction Product Tracking Form.pdf PDF
47PF0020R0040 - Amendment 02 PDF.pdf PDF
CBP 47PF0020R0040 RFI List from PreProposal Conf.pdf PDF
BrokerSCV-Walk-thru-20200722-FINAL.pdf PDF
47PF0020R0040 - Amendment 01.pdf PDF
CBP Vault Supplemental Pricing Form - SF1442 Attachment R1.pdf PDF
Site Visit Request Form - CBP Cargo Facility.pdf PDF
GC Reps and Certs 07-14-2020.pdf PDF
Past Performance Reference Questionnaire.pdf PDF
SBSA GC Solicitation 07-14-20.pdf PDF
CBP Cargo Facility Pre-Proposal RSVP Form.pdf PDF
SF24-16d.pdf PDF
CBP Vault Supplemental Pricing Form - SF1442 Attachment.pdf PDF
SBSA GC Agreement 07-14-20.pdf PDF
SF1442-14b - CBP Vault.pdf PDF
GSA527-15e (1).pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CBP Seized Cargo Vault GSA PBS Region 5 Broker Building - Detroit, MI PCN # N1813678 Amendment Release

SUSTAINABLE DESIGN REQUIREMENTS 018111 - 1

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

Do not remove this notice Properly destroy documents when no longer needed

SECTION 018111 -- SUSTAINABLE DESIGN REQUIREMENTS

PART 1 – GENERAL

1. SUMMARY

A. This Section describes general requirements and procedures to comply with the Guiding

Principles for Federal Leadership in High Performance and Sustainable Buildings, Executive Orders 13423 and 13514, the Energy Policy Act of 2005 (EPAct 2005), and the Energy Independence and Security Act of 2007 (EISA 2007).

B. Contractor shall be required to coordinate with subsequent technical sections herein as to the sustainability requirements.

1.1 RELATED DOCUMENTS

The Government is providing the references included in this sub-section for information purposes only and is not intended to provide a comprehensive, all-inclusive list of any and all potentially relevant portions of the Contract Documents.

A. Section 017410 Construction Indoor Air Quality Management

B. Section 017419 Construction Nonhazardous Waste & Management Disposal

C. Section 019113 Commissioning

1.2 OBJECTIVES

A. The contractor will document the purchase and use of Construction Key Sustainable Products (KSPs). Construction KSPs include: interior latex paint, nylon carpet, gypsum board, acoustical ceiling tile, and concrete. The form for recording this information follows this specification section. Consult with GSA's CO for the latest GSA Green Purchasing Plan and the latest GSA sustainability policies.

B. gBuild (Green Building Upgrade Information Lifecycle Database) is GSA’s system for tracking and reporting high-performance green building (HPGB) related data. gBUILD allows project teams to collaborate in a centralized secure environment that reduces and streamlines data calls for program-wide reporting. Contractor to cooperate with GSA and the A/E in providing information as needed utilizing GSA’s gBuild system for reporting high-performance green building (HPGB) related data.

1.3 SUBMITTALS

CBP Seized Cargo Vault GSA PBS Region 5 Broker Building - Detroit, MI PCN # N1813678 Amendment Release

SUSTAINABLE DESIGN REQUIREMENTS 018111 - 2

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

Do not remove this notice Properly destroy documents when no longer needed

A. Commissioning: See Section 019113 Commissioning for submittal requirements.

B. Sustainable Design Progress Reports: Concurrent with each Application for Payment, submit reports for the following:

1. Construction Waste Management: Waste reduction progress reports and logs complying with the requirements of Section 017419 Construction Nonhazardous Waste & Management Disposal.

2. Construction IAQ Management: See section 017410 Construction Indoor Air Quality Management for Construction IAQ management progress report requirements.

1.4 QUALITY CONTROL

A. Preconstruction Meeting: After award of Contract and prior to the commencement of the Work, schedule and conduct meeting with Owner, Architect, and all Subcontractors to discuss sustainability requirements, expected submittals, the Construction Waste Management Plan, and the required Construction Indoor Air Quality (IAQ) Management Plan. The purpose of this meeting is to develop a mutual understanding of the project’s sustainable design requirements and coordination of the Contractor’s management of these requirements with the Contracting Officer and the Construction Quality Manager.

B. Construction Job Conferences: The status of compliance with the sustainable design requirements of these specifications will be an agenda item at all regular job meetings conducted during the course of work at the site.

PART 2 - PRODUCTS

Products and processes that minimize environmental impact to the extent currently possible have been included in the Construction Documents. These products include but are not limited to paint, gypsum wall board, carpet, acoustic ceiling tile and concrete. The Contractor is responsible for maintaining and supporting these objectives in developing means and methods for performing the work of this Contract and in proposing product substitutions and/or changes to specified processes.

END OF SECTION 018111