47PD0223R0043 RFQ Design Change Log 11 9 2023.xlsx
XLSX spreadsheet 136 KB Posted
- Attached to
- CMS Back on Campus Phase III Federal contract opportunity
- Solicitation number
- 47PD0223R0043
About this file
This Excel file is a design change log template intended to summarize and track all changes and associated costs for the CMS Back on Campus Phase III project solicitation issued by the General Services Administration Public Buildings Service Region 3. The template requires submission of the change name, general scope, total cost impact, source of the change direction, and a narrative description explaining the exact scope change and separate cost breakdown. It is to help GSA evaluate the validity and necessity of any claimed change and associated cost increase during the design process for the project.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Log
| This is a summary sheet intedned to summarize all changes and the total cost impact. This should accompany the estimate for each design submission. Please only use this if the changes result in a contractual change. Red text shows the instructions and can be deleted by the DBC. The DBC is also free to use their own forms but the information below, at a mimimum, shall be shown. | ||
| Submission | ||
| Change Name | Scope | Cost Impact |
| Please refer to a short name for this change | General Scope (ie HVAC) | Total Cost |
Design Change Sheet
| Please make a change sheet for every proposed cost increease and project change during each design submission. | |
| Change Name | place the short name for this change |
| Scope | what is the general scope |
| Cost | total cost impact |
Source what is the source of this change. please be specific on where the direction for this change came from
Change Description Please create a narrative that explains what exaclty this change is. List necessary quantity changes, scope changes, etc to explain where the cost increase came from. Please also provide a seaprate breakdown of this change in the estimate so the quantities and etc can be verified by GSA. List why you think this is change and not design development. This section is to help GSA understand the valdity of this change and evaluate if it is both valid and necessary for the project.