47PD0223R0043 RFQ CMS BOCp3_Design Deliverable Summary 11 9 2023 .pdf

PDF 184 KB Posted

Attached to
CMS Back on Campus Phase III Federal contract opportunity
Solicitation number
47PD0223R0043
Issued by
General Services Administration Public Buildings Service Region 3

About this file

This document outlines design deliverable requirements for solicitation number 47PD0223R0043 from the General Services Administration to provide design and construction services for the CMS Back on Campus Phase III project. Key deliverables include a post-award concept submission with site survey results and hazard reports within 4 weeks of the notice to proceed, followed by final concept, design development, 65% construction, 95%, and final construction document submissions. Each submission must include required documents, calculations, schedules, estimates and checklists. Electronic documents must be submitted through Kahua and hard copies mailed to the GSA, CMS and construction manager as outlined. The purpose is to provide a framework for progressing the project design through completion of construction documents on schedule.

View the file

Other files for this federal contract opportunity

Other files attached to CMS Back on Campus Phase III, newest first.
File Type Posted
7PD0223R0043 CMS Back on Campus Pictures Zip File Amendment 0002 12 10 2023.zip ZIP file
47PD0223R0004 CMS Back on Campus PH1 Amendment 0002 12 10 2023.zip ZIP file
47PD0223R0043 CMS Back on Campus Phase III Amendment 0002 12 10 2023.pdf PDF
47PD0223R0043 CMS Back on Campus Phase III Kickoff Meeting Site Visit Sign In Sheet 11 28 2023.pdf PDF
47PD0223R0043 CMS Back on Campus Phase III Revised Solicitation 12 7 2023.pdf PDF
47PD0223R0043 CMS Back on Campus Phase IIII RFI Log Response 12 7 2023.pdf PDF
47PD0223R0043 CMS Back on Campus Phase III Pre-Proposal Agenda 11 28 2023.pdf PDF
47PD0223R0043 CMS Back On Campus Phase III Amendment 0001 12 7 2023.pdf PDF
47PD0223R0043 RFQ CMS BOCp3_POR 11 9 2023.pdf PDF
47PD0223R0043 RFQ CMS BOCp3_Ahearn Torres Art Move SOW 11 9 2023.pdf PDF
47PD0223R0043 RFQ CMS BOCp3_Attic Stock Minimums 11 9 2023.pdf PDF
47PD0223R0043 RFQ CMS BOCp3_DB SOW 11 9 2023.pdf PDF
47PD0223R0043 RFQ CMS Site Visit Form 11 9 2023.pdf PDF
47PD0223R0043 REQ CMS Back on Campus Phase III PP Questionaire Design Build Firm 11 9 2023.docx DOCX document
47PD0223R0043 RFQ Design Change Log 11 9 2023.xlsx XLSX spreadsheet
47PD0223R0043 RFQ CMS BOCp3_Division 01 Specifications 11 9 2023.pdf PDF
47PD0223R0043 RFQ CMS Back on Campus Phase III PP Questionaire Lead Design Firm 11 9 2023.docx DOCX document
47PD0223R0043 RFQ FY23 CEW-Version Nov 2022 11 9 2023.xls XLS spreadsheet
47PD0223R0043 RFQ CMS Security Vendor Requirements 11 9 2023.pdf PDF
47PD0223R0043 RFQ DB_Solicitation CMS BOC Phase III 11 9 2023.pdf PDF
47PD0223R0043 RFQ CMS Back on Campus Phase III DB_Agreement 11 9 2023.pdf PDF
47PD0223R0043 RFQ CMS Back on Campus Phase III DB GC Reps and Certs 11 9 2023.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN DELIVERABLE SUMMARY

GSA Mid-Atlantic Region

10/26/023 Last Revision

Public Building Service Mid-Atlantic Region

U.S. General Services Administration The Dow Building 100 S Independence Mall W Philadelphia, PA 19106

CMS HQ

Woodlawn, MD

I. DESIGN SUBMISSIONS

A. POST AWARD CONCEPT SUBMISSION

This submission shall contain the following:

• The IDR meeting (4 weeks after NTP)

• Site Survey Results

• Asbestos and Hazardous Material Survey Results and Recommendations

• All required documents per the Deliverables Matrix located in the POR

• A Completed A/E Design Checklist

• Initial Construction Schedule

• Presentation for the Peer Review (after deliverable submission)

B. Distribution

1. Electronic: All Deliverables in all Electronic Formats Listed shall be submitted and to the Project Team via Kahua

2. MAIL THE FOLLOWING (mailing addresses to be confirmed after award)

Deliverable GSA

COR

HILL CMS GSA BLD

MNGR

Total

Completed Package

N/A 2 Hard Copies

2 Hard Copies

1 Hard Copy 5 Hard Copies

A. FINAL CONCEPT SUBMISSION

• Site Survey Results

• Asbestos and Hazardous Material Survey Results and Recommendations (this should be completed in the post award concept phase but carried over for each submission with any comments incorporated)

• All required documents per the Deliverables Matrix located in the POR

• All calculations required for occupancy, HVAC, and etc needed to complete the design.

• Any key equipment and potential long lead items.

• Construction Schedule – showing the contractors proposed phasing plan

• Construction Estimate – with the GSA estimate comparison form completed for reconciliation and design change log completed to track any changes/design development items

• A Completed A/E Design Checklist

• Presentation for the Commissioners Presentation o This will include various iterations as the Design-Builder will first present this to the project team and the R3 commissioner)

▪ The Design-Builder shall present to the project team, then to the

Capital Project Executive prior to the R3 commissioner.

B. Distribution

1. Kahua: All Deliverables in all Electronic Formats Listed shall be submitted and to the Project Team via Kahua

Public Building Service Mid-Atlantic Region

U.S. General Services Administration The Dow Building 100 S Independence Mall W Philadelphia, PA 19106

CMS HQ

Woodlawn, MD

2. MAIL THE FOLLOWING (mailing addresses to be confirmed after award)

HILL CMS GSA BLD

MNGR

Total

Completed Package

N/A 2 Hard Copies

2 Hard Copies

A. Design Development Submission

• Site Survey Results (The A/E should carry the survey reports in the submissions in the design narrative and add any surveys to the submissions as they complete them between phases)

• Asbestos and Hazardous Material Survey Results and Recommendations (this should be completed in the post award concept phase but carried over for each submission with any comments incorporated)

• All required documents per the Deliverables Matrix located in the POR

• All calculations required for occupancy, HVAC, and etc needed to complete the design.

• Any key equipment and potential long lead items.

• Construction Schedule – Showing the contractor’s proposed phasing plan

• Construction Estimate – with the GSA estimate comparison form completed for reconciliation and design change log completed to track any changes/design development items.

• A completed A/E Design Checklist

• A list of potential early work packages for consideration by the project team.

3. MAIL THE FOLLOWING (mailing addresses to be confirmed after award)

HILL CMS GSA BLD

MNGR

Total

Completed Package

N/A 2 Hard Copies

2 Hard Copies

A. 65% Construction Document Submission them between phases)

• Asbestos and Hazardous Material Survey Results and Recommendations (this should be completed in the post award concept phase but carried over for each submission with any comments incorporated)

• All required documents per the Deliverables Matrix located in the POR

• All calculations required for occupancy, HVAC, and etc needed to complete the design.

• A list of long lead items for early release consideration with their schedule impacts.

Public Building Service Mid-Atlantic Region

U.S. General Services Administration The Dow Building 100 S Independence Mall W Philadelphia, PA 19106

CMS HQ

Woodlawn, MD

• Construction Schedule

• Construction Estimate – with the GSA estimate comparison form completed for reconciliation and design change log completed to track any changes/design development items.

• A completed A/E Design Checklist

• Construction Submittal List

• A FINAL demolition plan for Phase 01 of the N3 renovation as determined by the DB contractor showing the limits of temporary protections and demolition scope.

4. MAIL THE FOLLOWING (mailing addresses to be confirmed after award)

HILL CMS GSA BLD

MNGR

Total

Completed Package

1 Hard Copy

2 Hard Copies

2 Hard Copies

1 Hard Copy 6 Hard

A. 95% Construction Document Submission them between phases)

• Asbestos and Hazardous Material Survey Results and Recommendations (this should be completed in the post award concept phase but carried over for each submission with any comments incorporated)

• All required documents per the Deliverables Matrix located in the POR

• All calculations required for occupancy, HVAC, and etc needed to complete the design.

• A list of long lead items for early release consideration with their schedule impacts.

• Construction Schedule – with the contractors phasing plan

• Construction Estimate – with the GSA estimate comparison form completed for reconciliation and design change log completed to track any changes/design development items.

• A completed A/E Design Checklist

• Construction Submittal List

5. MAIL THE FOLLOWING (mailing addresses to be confirmed after award)

Public Building Service Mid-Atlantic Region

U.S. General Services Administration The Dow Building 100 S Independence Mall W Philadelphia, PA 19106

CMS HQ

Woodlawn, MD

Deliverable GSA

COR

HILL CMS GSA BLD

MNGR

Total

Completed Package

1 Hard Copy

2 Hard Copies

2 Hard Copies

C. FINAL Construction Document Submission them between phases)

• Asbestos and Hazardous Material Survey Results and Recommendations (this should be completed in the post award concept phase but carried over for each submission with any comments incorporated)

• All required documents per the Deliverables Matrix located in the POR

• All calculations required for occupancy, HVAC, and etc needed to complete the design.

• Construction Schedule – with the contractors phasing plan

• Construction Estimate – with the GSA estimate comparison form completed for reconciliation and design change log completed to track any changes/design development items.

• A completed A/E Design Checklist

• Construction Submittal List

D. Distribution

6. MAIL THE FOLLOWING (mailing addresses to be confirmed after award)

HILL CMS GSA BLD

MNGR

Total

Completed Package

1 Hard Copy

2 Hard Copies

2 Hard Copies