This document provides details for an upcoming construction project opportunity with the General Services Administration to renovate and upgrade the Perimeter East Building at the Social Security Administration campus in Woodlawn, Maryland. The project scope includes approximately 90,000 square feet of renovations to the fourth floor, construction of two new exterior stair towers, smoke control system upgrades, new HVAC equipment, building automation controls upgrades, and renovations to the cafeteria kitchen and serving area. The estimated total construction cost ranges from $30-50 million. The solicitation is anticipated to be issued on October 26, 2020 with proposals due on November 30, 2020 and award planned for the week of February 8, 2021. The procurement will utilize full and open competition under FAR Part 6 and competitive proposals will be requested under FAR Part 15. Selection will use the tradeoff process to identify the best value proposal considering price and evaluated non-price factors.

View the file

Other files

File Type Posted
Solicitation Amendment 47PD0121R0001_0008.pdf PDF
DOL General Decision Number MD20200030 Mod 10 dtd 12_11_2020.pdf PDF
Amendment 007 - Pre-Bid RFI responses.pdf PDF
Solicitation Amendment 47PD0121R0001_0007.pdf PDF
Solicitation Amendment 47PD0121R0001_0006.pdf PDF
Pre-Bid RFIs Responses - Amendment 006.pdf PDF
Bid Bond form - SF24.pdf PDF
Solicitation Amendment 47PD0121R0001_0005.pdf PDF
Amendment 0005 - Small Business Utilization Form.pdf PDF
Solicitation Amendment 47PD0121R0001_0004.pdf PDF
Pre-bid Photo Album No. 2 _11_12_2020.pdf PDF
Pre-bid Photo Album No. 3_11_12_2020.pdf PDF
Solicitation Amendment 47PD0121R0001_0003.pdf PDF
Pre-bid Photo Album No. 1.pdf PDF
Site Walk-Through Attendance List.pdf PDF
PEB Pre-Proposal Conference - Minutes 11.12.20.pdf PDF
Solicitation Amendment 47PD0121R0001_0002.pdf PDF
Amendment Number 0001 - pre-proposal information.pdf PDF
Amendment 0001 - SSA Complex 0001.pdf PDF
Amendment 0001 - PEB Parking Lots.pdf PDF
Solicitation Amendment 47PD0121R0001_0001.pdf PDF
Sol. 47PD0121R0001 C301 GC Rep and Cert.pdf PDF
Sol 47PD0121R0001 C101 Agreement.pdf PDF
47PD0121R0001 SF 1442.pdf PDF
DOL General Decision Number MD20200030 Mod 08 dated 10_09_2020.pdf PDF
Sol 47PD0121R0001 C201 GC Solicitation.pdf PDF
PEB 4th Floor and Infrastructure and Cafeteria Exp Bid Sheet 10-22-20.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 004 Contents

Pre-Bid RFI Responses (answered to date)

Attachment 001: DMARC Location Highlight (3rd Floor of PEB)

Attachment 002: Updated Lighting Drawings E500, E204A, E204B, E204C, and E204D

Attachment 003: Updated Bid Sheet dated 11.16.2020

No Question Response 1 Reference drawing A060 in the Cafeteria Expansion drawing set. General note F states. “Refer to sheet A061 for partition details.” Drawing A061 is not included.

Please provide.

Sheet A061 had been removed from the set. This should say..." sheet A060"...

2 Reference detail 2 on drawing A612 in the Cafeteria Expansion drawing set. Please confirm the ceiling mounted menu screens are considered FF&E and are not part of this contract

Menu boards are included in this project. See TA102 for menu board requirements.

3 Specification section 02 0850, Asbestos Abatement Procedures, refers to a "Hazardous Materials Surveys, Perimeter East Building (PEB) Cafeteria Expansion".

As the report is already provided for level 4 and other levels, please provide Hazardous Material Survey for the cafeteria.

It is included in the appendix at the end of Volume 1 of the specification

4 On the Bid Form there are unit prices requested for firestopping and fireproofing repairs; these quantities match what is shown in the table on G004 in the 4th Floor Fit Out Drawings. Volume 3, Appendix A – Study-NCC- Fire Stops and Sprinkler Repairs also shows images of firestopping and fire proofing damage. Please confirm the unit prices include the areas shown to be damaged in the Appendix A - Study- NCC- Fire Stops and Sprinkler Repairs.

No. The cited study was for the WHOLE building. The FP and FS repairs are required ONLY to the areas of work for this project. Generally 4th floor, all mechanical rooms included in the work and the cafeteria and other limited areas where work is required. Corrections identified for the areas of work for this project in the study and additional unknown repairs will be applied to the allowance quantities. .

5 Fireproofing and firestopping repair assumptions for allowances at level 04 fit were provided, on G004. Please provide assumptions for bidding purposes for fireproofing and firestopping repairs at the cafeteria and Alternate 1, if needed.

The allowances indicated on G004 are for concealed, existing conditions. There are no permanent fire rated walls associated with the cafeteria so there would be no allowances needed for firestopping at the cafeteria. There are no known fire proofing repairs associated with the cafeteria. Therefore any repair corrections revealed during demolition would be applied toward the allowances quantities. the Areas of work associated with Alternate 001 is generally the same as the base work, (except for stair 3 extension)

6 Reference drawing A020 of the 4th Floor Fit Out Drawings. One-way mirror glass, GL-11, is listed as part of the contract, but not shown on the drawings. Please provide locations for glass on level 04, if required.

Remove GL-11 from the project

7 C109 gravel strip (note 20) does not match the Landscape plan L101 and shows considerably more gravel. Which governs?

Civil is showing the correct areas (plot plan view, sheets C109 and C110). The width of rock area does vary by location. See 1/A530. The "gravel strip" is riverrock to match existing. Refer to photo log for picture of exisitng rock size.

8 BIM is mentioned in the specs as being used for Coordination drawings. Can you elaborate on the requirement for BIM on this project?

The Contractor will be required to utilize BIM to put together coordination drawings for the work. These coordination drawings are required prior to starting any work. Any work done prior to an approved set of coordination drawings is considered at the risk of the Contractor.

9 Please confirm if AISC certifications are required for fabrication and erection of the stair tower structure.

AISC fabricator certification is required per specification section 051200 1.6. Erector certification is not required.

Fabricator certification applies to the structural frame of the stair towers and is not applicable to the stairs themselves which are specified by section 055100.

10 Provide specifications, cut sheets and/or model numbers for the Kitchen Equipment.

QF series documents do not provide this information.

See specification section 114000 Part 4.

11 Please provide access to CAD/REVIT files for this project. CAD/REVIT files can be provided upon award of the contract

12 What material is the gravel mow strip? L101 says to match existing. Match existing heavy duty edging material. Section 1/A530 refers to "aluminum" edging, if this conflicts with existing, then match existing. Site visits were available for bidders on 11/12. Refer to photo log for picture of existing rock size.

13 Provide a section showing depth of gravel mow strip. Is there to be edging? Weed barrier below the gravel? None is shown.

See section 1/A530. Edging and filter fabric are required.

14 General notes refer to firestopping existing penetrations of abandoned conduit. The drawings do not specify where these penetrations are and how many. Can you identify the number of existing penetrations that will need to be firestopped?

The quantity is currenly unknown. See G004 of PEB4 drawings for firestopping allowances and spec section

15 As Amendment 002 extends the bid date to December 11, 2020, can the RFI due date be extended the same amount of time? This would make the RFI's due by 2:00 pm on Friday, November 20, 2020.

Per Amendment 003, the RFI due date is November 19, 2020

16 Spec 329200 makes several references to sod. L series drawings show all areas as seeded. Confirm sod references are not applicable and to be disregarded.

Sod is not a requirement, but could be an option if a shorter period of maintainance was desired.

17 Please confirm the Unit Price for Fire Doors under the Cafeteria Base Bid is for Fire Door Abatement

Confirmed. Unit price for Fire Doors is in the 012700 Unit Prices – Abatement is for the abatement of fire doors presumed to contain asbestos material. Unit price does not include replacement.

18 With the bid date being extended to 12/11/2020, please confirm that the RFI Deadline has moved to 11/25/20 in lieu of 11/16/20

Per Amendment 003, the RFI due date is November 19, 2020

19 Confirm that there is no cafeteria furniture requirement. Is that a separate solicitation?

There is no furniture required under the cafeteria portion of the project. If required, SSA will procure themselves. To clarify, lockers are the respnsibilty of the GC.

20 The overall project duration is stipulated for the base project work – is it the Government’s intent that the alternate work, if accepted, would need to be accomplished in the same amount of time? This may not be feasible without extensive expediting cost and overtime work.

If the the alternate work is added, the Government will extend the contract substantial completion by 6 months

21 Please confirm that there are no requirements for, or restrictions against, the GC to self-perform a certain percentage of the project.

There are no requirements or restrictions

22 Construction Documents include the NCC-Fire Stops and Sprinkler Repair Study prepared by Summerland Consultants. What scope is to be included by this GC for the Sprinkler Repair portion of that report?

Sprinkler work in the report addresses the Warehouse, which is outside of the scope of work for this project.

23 Will the Government be hiring a LEED Consultant to compile the required information and request Certification?

No. These responsibilities will be by the GC. See spec section 018113 etc. for LEED documentation, and filing.

24 Specification 001110 calls for the AHU and HVAC in each quadrant to be commissioned before going on to the next quadrant, which will result in quadrants being commissioned in differing seasonal conditions – will there be a requirement for an alternate-season commissioning exercise for the entire floor prior to or after Substantial Completion?

Specific seasonal testing is required or provide approved simulated conditions. See specification. Sections 230800 3.3.F and 230800 3.3.J

25 Is there a drawing which shows where the DEMARC is on the 3rd floor? See attached for a drawing that highlights the location of the DEMARC room on the 3rd floor 26 The lighting fixture schedule on E500 does not provide any information on lighting fixture type NX1E. Lighting fixture type NX1E is shown through the floor plans. For example, on drawing E204A in conference room 4105 it is shown as a 2’x2’ light symbol. It is also shown in electrical room 4111 as a 1’x4’ light symbol. Please clarify the correct fixture type for NX1E.

Lighting sheets, E500, E204A, E204B, E204C, and E204D will be corrected and reissued (see attached)

27 Spec section 232113 paragraph 3.1 B and 3.1 E call for 2.5” piping to be copper, typically pipe 2.5” and above is steel pipe with welded fittings, please confirm steel pipe and welded fittings can be used for 2.5” pipe?

Provide as specified. This is the client requirement.

28 Spec Section 230523 paragraph 3.6 A. calls for 3” and smaller to be flanged ball valves for shutoff, typically 2.5” pipe and above is steel pipe with welded flanges and butterfly valves can be used, please confirm butterfly valves are acceptable for 2.5” and 3” pipe?

Provide as specified. This is the client requirement.

29 Spec Section 230523 paragraph 3.6 B allows butterfly valves 300 PSIG or High performance butterfly valves class 150, the product data only lists iron single butterfly valves as class 200. Are class 150 or class 200 regular butterfly valves acceptable? Or do they have to be high performance butterfly valves?

Yes, class 150 butterfly valves are acceptable.

30 Drawing A134 Keynote 6 shows the removal of several access doors with patch and repair of ETR ceiling in the Atrium. Please provide information for the ceiling type and height of space.

Existing atrium ceiling is a painted metal slat ceiling. According to facilities staff, the doors are sufficiently wide to allow equipment that will reach the ceiling. The atrium is five stories tall.

31 For the unit price allowances listed on the SF1442 bid form, please confirm if these costs are above and beyond what is shown on the bid drawings, specifications & appendices or do these allowances incorporate all fireproofing repairs & abatement on this project?

These quantities are reflected on the drawings and/or in the specifications and reflect what is anticipated. The Variations FAR Clause will use this pricing/unit for 15% above or below the specified quantity, without further price negotiation.

32 Per the SF1442 bid form - PEB Cafeteria Expansion breakout, please clarify what costs are to be associated with the "Interior Finishes" breakout and the "Interior Construction" breakout? Can this cost breakout be reduced to (1) cost?

Keep costs separate. Intent was to align with CSI Master Division Format, but not list every Division.

Please see revised Bid Sheet with Red Comments to show which Divisional work should be included with each line.

33 Per the SF1442 bid form, there is a breakout requested for the grease interceptor work. Please confirm this work can be combined into the Cafeteria Expansion and breakout removed from the bid form.

These numbers must be kept separate for purposes of bidding

34 One of the manufacturers specified in section 102219 Demountable Partitions part

2.2.A has indicated they have been selling demountable walls to SSA thru GSA directly under a contract through Federal Prison Industries or Unicor. Will GSA need to provide Letter of Authorization so GC can purchase the demountable walls directly from Manufacturer?

No Letter of Authorization is needed to purchase the demountable walls

35 Can an additional site visit be scheduled for subs who could not attend the original site visit?

Due to safety concerns - SSA cannot accommodate further site visits.

36 The lighting fixture schedule on E500 does not provide any information on lighting fixture type NX1E. Lighting fixture type NX1E is shown through the floor plans. For example, on drawing E204A in conference room 4105 it is shown as a 2’x2’ light symbol. It is also shown in electrical room 4111 as a 1’x4’ light symbol. Please clarify the correct fixture type for NX1E.

See response to RFI 26

37 Who provides the FSR floor boxes shown on sheet TA501? GC or GC's subs 38 Volume 3 / Appendix A provides a Fireproofing & sprinkler repair study showing multiple spray fireproofing repair requirements throughout the building. Please confirm the only fireproofing repairs that are required on this project are part of the unit price allowances on the SF 1442 bid form.

That is confirmed. The report was used as a basis for the design allowances and the work required under this contract are highlighted in the drawings and specifications for both the PEB 4th Floor and Cafeteria

39 Will the GC do Telecom demo? If not, what is the number of cables to be demolished on the 4th floor?

This is for the GC to provide or coordinate with others on the construction team

40 Confirm that 4th floor cabling is to be ran under floor. All cabling run under the raised access flooring 41 Will the EC install all cable tray under floor and above ceiling as shown on TN501? This is for the GC to provide or coordinate with others on the construction team

42 Will EC provide and install new TGB, floor boxes and poke thrus? This is for the GC to provide or coordinate with others on the construction team

43 Will the GC install fire rated plywood in new Telco room? Yes, GC to provide or perform via sub.

44 Drawings do not show where the DEMARC 3220 is located. What is the distance to new TR 4051?

See response to RFI #25

45 Refer to solicitation. Page limits are provide for each section and are inclusive of cover letter, tabs, table of contents. Can these three items be excluded from the page count?

The page limits are set for the section themselves. In other words, if there is a table of contents for your section that would be included in the count for the section whereas a table of contents for your entire proposal would not count towards the page count

46 Refer to solicitation page 25 under Staffing Plan. The second bullet requires an organizational chart for design and construction phases and appears to be from a CMC or design/build solicitation. Please confirm that one org chart for construction phase only is required.

Org chart should be for construction only

47 Refer to solicitation page 25 under Management Plan. The last bullet requires offeror to address Project Management and Staffing Plan but staffing is covered in the entire next section, Staffing Plan. Is there different info required for this bullet than the next section? If not, please confirm that this bullet can be removed.

Project Management and Staffing Plan bullet under Management Plan can be removed as the requirement is addressed in the Staffing Plan section

48 Confirm that on page E010 of the cafeteria drawing set, General Note E is intended to read "Electrical feeders and equipment shown with light lines are existing to remain. All electrical equipment shown with dark solid lines are new" (not dark dashed lines, as is currently stated) because, as stated "all electrical equipment shown with dark dashed lines are to be demolished."

Statement is correct – Light solid lines are existing to remain, dashed dark is to demolished, dark solid is new.

49 Specification section 008000 requires "all contractors, sub-contractors, and anyone working or visiting the premises to be HSPD-12 badged or maintain a visitors badge". Please indicate what situations will allow a visitor badge in lieu of HSPD-12 badged employees. Will visitor badges be permitted when access is needed for one day for a site visit or field measurements? Will visitor badges be permitted when subcontractors will be on site less than two (2) weeks? Will visitor badges be allowed for employees that have started the HSPD-12 process but have not received their badge?

One day site visits for field measurements (survey or a meeting) can be granted a visitor badge. That person will only be granted a visitor badge one time for the entire duration of the contract. Therefore, if they are required to come back multiple times throughout the life of the project they would need to go through the HSPD12 process An HSPD12 badge is required for a subcontractor on site less than 2 weeks Personnel are required to attain an HSPD12 badge prior to starting any work, there are no interim badges

50 Regarding obtaining the HSPD-12 badge, please define the process to obtain the badge. What forms are required to submit? How long should subcontractors anticipate waiting to receive a badge?

Step 1: Add employee to ROCAL and route to COR for processing.

Step 2: Complete and submit CIW form to Zone A for processing (encrypted due to PII info).

Step 3: The employee will receive an email with enrollment instructions for receiving fingerprints and photo, and instructions for the employee to complete their background investigation on line via an on line tool referred to as eQIP Step 4: The employee will need to schedule an enrollment appointment for their photo and fingerprint.

Step 5: The employee will need to FULLY complete the e-QUIP application on-line. Once complete, they will need to press Click-to-Sign and upload forms OF306 and 3665 to the e-QIP application as instructed.

Step 6: The employee will receive an email with their Primary and Final Investigation results

So long as the subcontractors complete all the portions they are required to (i.e., they complete Steps 2-4 completely), they should receive badges in 3 weeks

51 Please advise if non-union labor is acceptable on this project. Non-union labor is acceptable, but Davis Bacon wage rates apply.

52 In Specification 316333, Section 2.2.C and 3.4.A.3 seem to be in conflict regarding the casing requirements. Section 2.2.C states "Micropiles shall be cased from top of pile to top of bedrock to prevent undermining of adjacent, existing footings." Section 3.4.A.3 states "Where the use of temporary casing is required to maintain the stability of a bore, the bottom of the casing shall be kept a minimum of 3 feet or more below the unstable strata…". Please confirm that, per 2.2.C, permanent casing shall be required from top of pile to top of bedrock, and that 3.4.A.3 is not applicable to this specification.

Micropiles shall be cased from top of pile to top of bedrock per Specification 316333, section 2.2.C. The casing may be permanent or temporary, based on the design by the contractor’s professional engineer. The geotechnical report referenced in Specification 316333 indicates options for both permanent and temporary casing methods.

53 In Specification 316333, Section 3.8.D states "Test micropiles that comply with requirements, including location tolerances, may be used on Project." Section 3.8 does not specify if load tests are to be performed and accepted prior to installation of production micropiles. Please confirm that one verification test at the first stair tower prior to production and a proof test at the second stair tower after production will be acceptable.

The proposed testing protocol is acceptable.

54 Spec Section 260519 3.2H states that circuitry run under the raised floor can be run in MC cable, but it does not list MC as an acceptable method of circuitry in concealed walls & ceilings. Please confirm whether branch circuitry (<30A) is allowed in to be run in MC in concealed walls & spaces.

MC can be used in concealed walls and spaces for branch circuit wiring. Homerun from last device box located in the office space to panel to be EMT.

55 The lighting fixture schedule on E500 does not provide any information on lighting fixture type NX1E. Lighting fixture type NX1E is shown through the floor plans. For example, on drawing E204A in conference room 4105 it is shown as a 2’x2’ light symbol. It is also shown in electrical room 4111 as a 1’x4’ light symbol. Please clarify the correct fixture type for NX1E.

See response to RFI 26

56 Spec Section 262416 (Panelboards) only lists Square D as an accepted manufacturer. Please confirm that Square D is the only acceptable manufacturer for panelboards.

Confirmed. As stated in specification section is correct.

57 Drawings TN601 and TN801: Details reference an existing DEMARC 3220 on the 3rd floor to be utilized with new construction on the 4th floor, but there are no floor plans indicating the location of the DEMARC. Please provided the location of the

DEMARC.

See response to RFI #25

58 With loading dock access being minimal, will there be specific times for loading and delivering? And are they subject to any specific OT rates?

Per Specification 011400, use of the existing loading dock facilities will be shared with Government activities on a first-come, first-served, wait-your-turn basis. The loading dock is available for the delivery of materials, tools, and supplies between the hours of 5:30 am – 4:

00 pm. Deliveries after normal working hours can be delivered as long as SSA Project Management is notified at least 24 hours beforehand. SSA Project Management has to notify Security for access approval at the front gate vehicle inspection area and to open the loading dock roll-up door. Contractors staff must be onsite to accept the delivery or have a designated individual to accept delivery. There will be no SSA warehouse employees to accept any after hour deliveries.

59 Factor 4: Small Business Subcontracting Plan sub-paragraph 3 reads in part: “The Offeror will be required to use the Subcontracting Commitment Goals and Outreach Efforts Form.” This form does not appear to have been included in the solicitation;

can the GSA please provide the required form for this factor?

The word "form" is incorrect. Please refer to the Solicitation Section C201 - VI. Method of Award - VI. F.

Non - Price Factors for the description and minimum standard of Factor 4. Each offeror must provide a narrative addressing the three items listed in the description of the factor.

60 Spec 008000 – 3: What is the cost per employee to obtain HSPD-12 badges? From the perspective of the Contractor, GSA is providing access to a location for fingerprinting with no out of pocket expenses for the employee for the service. The e-QUIP system is done all online

61 Spec 274133 CATV Systems and drawing TA603: What is the location of the DEMARC for the cable TV feed to the 4th floor telecom rooms?

See response to RFI #25

62 Is there a drawing which shows where the DEMARC is on the 3rd floor? See response to RFI #25 63 Confirm that 4th floor cabling is to be ran under floor. See response to RFI #50 64 Drawings do not show where the DEMARC 3220 is located. What is the distance to new TR 4051?

See response to RFI #25

PasqualinaMontgomery Typewriter

ATTACHMENT 001:

DMARC

Location Highlight

1 2 3 4 5 6 7 8 9 10 11 12 13

104 105 106 106A 107 107A 107B 108A 108 12A 12B 13A 13B

AA

A1

A2

D1

E1

F1

F2

G1

G2

G3

G4

H1

K1

K2

K3

K4

LL

A

B

C

D

E

F

G

H

J

K

L

M A

T C

H

LIN

E M

A T

C H

LIN

E

MATCH LINEMATCH LINE

A-102A-101

A-104A-103

A -104

A -102

A -103

A -101

MECHANICAL

313C1

BREAKROOM

ELECTRICAL

311C1

WOMEN'S

37C1

TELECOM

39C1

MECHANICAL

31C3

TELECOM

33C3

ELEC

35C3

WOMEN'S

37C3

JAN

39C3

MEN'S

311C3

MECHANICAL

30C4

TELECOM

32C4

ELEC

34C4

MEN'S

36C4

WOMEN'S

310C4

JAN

38C4

MECHANICAL

312C2

ELEC

30C2

TELECOM

310C2

WOMEN'S

38C2

MEN'S

34C2

JAN

36C2

ELEC

NW

QUAD

ELEC

CLOSET

OFFICE

OFFICE

OFFICE

OFFICE

STAIR 1

315C1

STAIR 3

315C3

STAIR 4

314C4

STAIR 2

314C2

ELEVATOR

LOBBY

316C2

STORAGE

32C2

MAIN STREET

LOBBY

MAIN STREET CORRIDOR

3000MS

CONF

CONF

FOCUS

FOCUS

FOCUS

FOCUS

FOCUS

FOCUS

FOCUS

FOCUS

FOCUS

FOCUS

FOCUS

FOCUS

TELECOM

CONF

CONF

CONF

CONF

ROOM

CONF

ROOM

CONF

ROOM

NW

CORRIDOR

3100C1

SW

CORRIDOR

3200C2

NW OPEN OFFICE

NE OPEN OFFICE

SW OPEN OFFICE

SE OPEN OFFICE

NE

CORRIDOR

3300C3

ELEC

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

ELEC

SE

CORRIDOR

3400C4

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BREAKROOM

ELEC

DMARC

DSEL

OFFICE

OFFICE

OFFICE

OFFICE

EXECUTIVE

SUITE

TEAM

AREA

TEAM

AREA

TEAM

AREA

TEAM

AREA

EXECUTIVE

SUITE

STORAGE

313C3

60'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"

JAN

33C1

LOUNGE

35C1

ATRIUM

(OPEN TO BELOW)

MEN'S

31C1

CONF.

COPY

CONF.

COPY

CONF

ROOM

CONF

ROOM

CONF

ROOM

CONF

ROOM

SCALE: 1/16" = 1'-0"

ARCHITECTURAL COMPOSITE FLOOR PLAN - NEW WORK

PART 1 PART 2

PART 3 PART 4

N

DRAWING NOTES:

1. REFER TO A-001 FOR ARCHITECTURAL LEGEND AND

ABBREVIATIONS.

2. ALL NEW WORK SHALL BE COORDINATED WITH

EXISTING FIELD CONDITIONS AND DEMOLITION.

3. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS AND DIMENSIONS. COORDINATE ANY

VARIATIONS WITH THE PROJECT MANAGER.

4. NEW ARCHITECTURAL WORK TO BE COORDINATED

WITH ALL STRUCTURAL, MECHANICAL, AND

ELECTRICAL NEW WORK.

5. ALL AREAS THAT ARE TO REMAIN OPERATIONAL

DURING CONSTRUCTION SHALL BE PROTECTED AND

REMAIN ACCESSIBLE THROUGHOUT THE DURATION

OF THE WORK, INCLUDING, BUT NOT LIMITED TO,

THE NW QUAD AND DMARC.

6. REFER TO ARCHITECTURAL PART PLANS ON SHEETS

A-101 THRU A-104 FOR LOCATION AND EXTENT OF

NEW WORK.

7. REFER TO SHEET A-110 FOR REFLECTED CEILING

PLAN NEW WORK.

8. REFER TO SHEET A-120 AND IN-100 FOR RAISED

ACCESS FLOOR PLAN AND FINISHES NEW WORK.

SCALE:1/16"=1'

0 8' 16' 32'

LEGEND

EXISTING TO REMAIN

NEW PARTITION - FULL HEIGHT

NEW PARTITION - PARTIAL HEIGHT

NOT IN CONTRACT

COMPUTER ROOM

PROTECTION & SEQUENCING-

SEE G-004

COMPUTER ROOM

PROTECTION &

SEQUENCING-

SEE G-004

UP

UP

UP

UP

UP

UP

UP

UP

CONSTRUCTION

KEYNOTES

NEW STAIR - SEE ALLOWANCES

SPECIFICATION.

Highlight

ATTACHMENT 002:

Update Lighting Drawings:

E500 E204A E204B E204C E304D

DN UP

O

O

V

V V V

V

VV V V

V V V

V V V V V

V V VV

V V

V V V

V

O

O

O

O

P

V

V

O O O

O O O

O O O

O O O

O O O

O O O

O O

O O O

O O O

O O O

O O O

O

O

O

O O

V

GENERAL NOTES

A. COORDINATE EGRESS LIGHTING AND EXIT REQUIREMENTS WITH

ARCHITECTURAL LIFE SAFETY PLANS.

B. COORDINATE MOUNTING HEIGHTS AND LOCATIONS OF

LUMINAIRES IN MECHANICAL ROOMS WITH DUCTS, PIPES, AND

EQUIPMENT. MOUNT LUMINAIRES BELOW DUCTS AND PIPES AND

DO NOT MOUNT LUMINAIRES OVER EQUIPMENT. SUPPORT

LUMINAIRES INDEPENDENTLY OF DUCTS, PIPES, AND EQUIPMENT.

C. REFER TO EXTERIOR ELEVATIONS FOR MOUNTING HEIGHTS OF

EXTERIOR WALL MOUNTED FIXTURES.

D. LIGHT FIXTURES SHALL BE CIRCUITED FROM PANELS AS

INDICATED BY THE CIRCUITING BOUNDARY SHOWN ON THE PLAN

UNLESS NOTED OTHERWISE.

E. CONDUIT AND WIRING MAY NOT BE SHOWN GRAPHICALLY ON THE

PLANS. PROVIDE COMPLETE CONDUIT AND WIRING BASED ON

IDENTIFICATION OF CIRCUIT NUMBERS, RELAY NUMBERS, AND

SWITCHING IDENTIFICATION.

F. WHERE OCCUPANCY AND VACANCY SENSORS ARE SHOWN,

PROVIDE APPROPRIATE TYPES AND QUANTITIES OF SENSORS TO

ACCOMMODATE ROOM GEOMETRY. REFER TO SPEC SECTION

260923 FOR DETAILS. INSTALL OCCUPANCY AND VACANCY

SENSORS AT LOCATIONS RECOMMENDED BY MANUFACTURER.

SEE OCCUPANCY AND VACANCY SENSOR SHOP DRAWINGS FOR

REFERENCE.

G. ALL ELECTRICAL WORK TO BE COORDINATED WITH ALL

STRUCTURAL, MECHANICAL, PLUMBING, FIRE SUPPRESSION AND

DETECTION, A/V, TELECOM, AND SECURITY, AS WELL AS ALL

ARCHITECTURAL WORK.

107A

107A

107B

107B

108A

108A

106A

106A

AA

B

C

D D1

E

F

FAMILY RESTROOM

45C1

STAIR #1

S-1

MEN'S

41C1

JAN

43C1

WOMEN'S

47C1

TELECOM

49C1

ELEC

411C1

MECH

413C1

ELEC

SMALL CONFERENCE

OFFICE

OFFICE

OFFICE

LARGE CONFERENCE

LARGE CONFERENCE

OFFICE

OFFICE

BREAKROOM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

ELEV CORE #3

EC-3

ELEV #10

E-10

OFFICE

MEDIUM CONFERENCE

MEDIUM CONFERENCE

MEDIUM CONFERENCE

OFFICE

OFFICE

OFFICE

FOCUS

FOCUS

FOCUS

COPY

FOCUS

SMALL CONFERENCE

FOCUS

CORRIDOR

4100C1

CORRIDOR

4200C2

VESTIBULE

NX1

NX1E

DG1

(TYP.)

L A b bb bb b

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

DG1

(TYP.)

L A b b bb b b

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

R44A-11

RG1

R44A-11

RG1

R44A-12

RG1

R44A-11

RG1

R44A-11

RG1

R44A-11

RG1

R44A-12

RG1

R44A-11

RG1

R44A-11

RG1

R44A-11

RG1

R44A-12

RG1

L A

L AL A

(TYP.)

b b b bb b

L B

L B c c cc c c c c

(TYP.)

DG1

(TYP.)

b b b bb b

DG1

(TYP.)

b b b bb b

DG1

(TYP.)

NX1

NX1

NX1

NX1

NX1

NX1

NX1

NX1

P

NX1E

NX1

NX1E

NX1

NX1

R43A-15

DG2

R43A-15

DG2

NX1

R43A-7

DG2R43A-8

DG2

LG1-8

LG1-8

LG1-8

R44A-7

DG2

R44A-8

DG2

R44A-7

DG2

R44A-8

DG2

R44A-7

DG2

R44A-8

DG2

R44A-7

DG2

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

DG1

DG1

R44A-6

DG1

WH2

WH2

EA2

DG1

DG1

DG1

R44A-15

DG2

R44A-16

DG2

R44A-15

DG2

R44A-16

DG2

R44A-15

DG2

R44A-15

DG2

R44A-5

DG2

R44A-5

DG2

R44A-5

DG2

R44A-6

DG2

R44A-5

DG2

R44A-5

DG2

R44A-5

DG2

R44A-5

DS1

R44A-5

DS1

R44A-5

DS1

R44A-6

DS1

R44A-5

DS1

R44A-5

DS1

EA2

R44A-5

DS1

R44A-5

DS1

EA2

R44A-6

DS1

R44A-5

DS1

R44A-5

DS1

R44A-5

DS1

R44A-5

DS1

R44A-6

DS1

R44A-5

DS1

R44A-5

DS1

R44A-5

DS1

R44A-5

DS1

R44A-5

DS1

R44A-5

DS1

R44A-6

DS1

R44A-5

DS1

R44A-5

DS1

R44A-5

DS1

R44A-5

DS1

EA1

R43A-5

DS1

R43A-6

DS1

R44A-1

DG2

R44A-1

DG2

EA2

EA2

R44A-14

DS1 R44A-13

DS1

R44A-13

DS1

R44A-14

DS1

R44A-7

DS1

R44A-14

DS1

R44A-7

DS1

R44A-14

DS1

R44A-7

DS1

EA2

R43A-8

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

EA2

R44A-7

DS1

R44A-7

DS1

R44A-14

DS1

R44A-7

DS1

R44A-14

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

EA2

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-8

DS1

R44A-7

DS1

R44A-7

DG2

R44A-8

DS1

R44A-13

DS1

R44A-14

DS1

R44A-14

DS1

R44A-13

DS1

R44A-13

DS1

R44A-14

DS1

R44A-13

DS1

R44A-7

DS1

EA2

R44A-3

JG1-4

R44A-4

JG1-8

R44A-3

JG1-8

R44A-3

JG1-8

R44A-3

JG1-4

R44A-3

JG1-4

R44A-3

JG1-8

R44A-3

JG1-8

R44A-3

JG1-8

R44A-4

JG1-8

R44A-3

JG1-4

R44A-3

JG1-4

R44A-4

JG1-8

R44A-3

JG1-8

R44A-3

JG1-8

R44A-3

JG1-4

R44A-3

JG1-4

R44A-3

JG1-8

R44A-3

JG1-8

R44A-3

JG1-8

R44A-4

JG1-8

R44A-3

JG1-4

R44A-9

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R44A-10

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R44A-10

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R44A-10

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R44A-9

JG1-4

R44A-9

JG1-4

R44A-9

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R41A-1

JG1-8

R41A-2

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-2

JG1-8

R44A-10

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R44A-9

JG1-8

R44A-10

JG1-8

WH3

R43A-15

WH3

R43A-15

WH3

R43A-15

WH3

FOCUS

D D D D

D D D D D

D D D D R43A-8

DS1

DG3

DG3

DG3

DG3

DG3

DG1

DG1

DG1

DG1

DG1

D D D D D

D D D

D

DG3

DG1

D

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

EA2

/1 E204C

/1 E204B

LCP-44

AG1

AG1

AG1

AG1

R44A-7

CH1

R44A-7

CH1

R44A-17

WW3

R43A-15

WH3

R43A-15

WH3

R43A-15

WH3 3

WH3

ALL NORMAL POWER LIGHTING SHALL

BE CIRCUITED TO PANELBOARD LP-44;

UNLESS NOTED OTHERWISE.

ALL NORMAL POWER LIGHTING SHALL BE

CIRCUITED TO PANELBOARD LP-41A;

UNLESS NOTED OTHERWISE.

ALL NORMAL POWER LIGHTING SHALL

BE CIRCUITED TO PANELBOARD LP-44;

UNLESS NOTED OTHERWISE.

ALL NORMAL POWER LIGHTING SHALL

BE CIRCUITED TO PANELBOARD LP-43;

UNLESS NOTED OTHERWISE.

LP-44A

OPEN AREA

ALL EMERGENCY LIGHTING SHALL BE

CIRCUITED TO PANELBOARD ELP-34;

UNLESS NOTED OTHERWISE.

ALL EMERGENCY LIGHTING SHALL BE

CIRCUITED TO PANELBOARD ELP-34;

UNLESS NOTED OTHERWISE.

ALL EMERGENCY LIGHTING SHALL BE

CIRCUITED TO PANELBOARD ELP-31;

UNLESS NOTED OTHERWISE.

R44A-1

CG1

R44A-1

AG2

R44A-2

AG2

R44A-1

AG2 R44A-1

AG2

R44A-2

AG2

R44A-1

AG2 R44A-1

AG2

R44A-1

AG2

R44A-1

AG2

R44A-2

AG2

R44A-1

CH1

R44A-1

DG2

R44A-2

DG2

a a a

(TYP.)

a a a

(TYP.)

a a a a a a a a a4

AG1

(TYP.)

AG1

(TYP.)

EA2

DG1

(TYP.)

DG1

LX

LCC

LDD

LZ

LY

LAA

LZ

LDD

LCC

LAA LBB

3 3 a

LN

LO

LN

LO

b b

LG1-6

LG1-6

(TYP.)

b b a

LG1-6

(TYP.)

b b

LG1-6

R44A-9

CG1

CH2-3

CH2-3

CH2-4

CH2-3

CH2-4

CH2-4

DS1

R44A-14

R44A-14

DS1

R44A-14

DS1

R44A-14

DS1

R44A-13

DS1

NX1

R44A-16

DG2

R44A-2

DG2

R44A-2

DG2

R44A-2

DG2

DG1

R44A-6

DG1

R44A-5

DG1

R44A-6

DG1

R44A-4

JG1-8

R44A-4

JG1-8

R44A-16

DG2

R44A-2

DG2

R44A-10

JG1-8

R44A-10

JG1-8

R44A-10

JG1-8

R44A-14

DS1

R44A-14

DS1

R44A-8

DG2

R44A-6

DS1

R43A-8

DG2

Daylighting Zone Daylighting Zone

EA2

EA2

EA2

EA1

KEYNOTES:

1. EXISTING LIGHTING AND CONTROLS ARE TO REMAIN.

2. PROVIDE LIGHT FIXTURES ON EACH INTERMEDIATE LANDING FOR

ILLUMINATION IN NEW STAIRWELL. PROVIDE (5) LIGHT FIXTURES.

MOUNT EACH LIGHT FIXTURE 8'-0" AFF ABOVE INTERMEDIATE

LANDING.

3. PROVIDE LOW VOLTAGE DIMMER SWITCH WITH TWO LIGHTING

ZONES:

BUTTON a: PENDANTS BUTTON b: DOWNLIGHTS

4. PROVIDE LOW VOLTAGE DIMMER SWITCH WITH THREE LIGHTING

ZONES:

BUTTON a: FRONT BUTTON b: CENTER BUTTON c: PERIMETER

5. DAYLIGHT ZONE CONTINUES TO SHEET E204B.

6. EXTERIOR WALL LIGHT IS TO BE MOUNTED ABOVE EGRESS DOOR

AT GROUND LEVEL. SEE E500 FOR MOUNTING INFORMATION.

A B

C D

HGA NO:

DATE:

CIVIL ENGINEER

WILES MENSCH CORP.

11860 SUNRISE VALLEY DR

SUITE 200, RESTON VA 20191

703.391.7600

FIRE PROTECTION

JENSEN HUGHES INC.

3610 COMMERCE DRIVE

SUITE 817,BALTIMORE, MD 21227

410.737.8677

ENVIRONMENTAL

AERO EH & S INC.

10310 BALTIMORE NAT. PIKE

ELLIOT CITY, MD 21042

410.480.3636

ACOUSTIC AND TECHNOLOGY

POLYSONICS

405 BELL AIR LANE

WARRENTON, VA 20186

540.341.4988

NO DESCRIPTION DATE

COPYRIGHT HAMMEL, GREEN AND ABRAHAMSON, INC.C

ISSUANCE HISTORY - THIS SHEET

ISSUED FOR

CONSTRUCTION

October 29, 2020

2111-092-00

KEY PLAN

GENERAL SERVICES

ADMINISTRATION

MID-ATLANTIC REGION

Public Building Services

100 S. Independence Mall West Philadelphia, PA 19106

PERIMETER EAST

BUILDING

BUILDING # : MD0547AQ

GSA PDN# : EP-47PD0119F0021

CONTRACT # : GS-07-P-15-UC-D-7000

6201 Security Boulevard Baltimore, MD 21235

SENSITIVE BUT UNCLASSIFIED

(SBU) - PROPERTY OF THE UNITED

STATES GOVERNMENT FOR OFFICIAL

USE ONLY - DO NOT REMOVE THIS

NOTICE - PROPERLY DESTROY

DOCUMENTS WHEN NO LONGER

NEEDED

S E

N S

IT

IV

E B

U T

U N

C L

A S

S

IF

IE

D

S

B U

P

R O

P E

R T

Y O

F T

H E

U N

IT

E

S S

T A

T E

S G

O V

E R

N M

E N

T C

O P

Y

IN

G ,D

IS

S

E M

IN

A

T

IO

N , O

R D

IS

T

R

IB

U T

IO

N

O F

T H

IS

D

O C

U M

E N

T S

T O

U N

A U

T H

O R

IZ

E

D R

E C

IP

IE

N T

S

IS

P R

O H

IB

IT

E D

. D o no t r em ov e th is n ot ic e.

P ro pe rly d es tr oy o r re tu rn d oc um en ts w he n no lo ng er n ee de d.

EXPIRATION DATE:

LICENSE NUMBER:

Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.

NAME:

/1 /2

:1

:4

P M

B

IM

/P

E B th

F lo o r

F it -O u t/ P

E B

E

L E

C

M .r v t

E204A

LIGHTING PLAN

LEVEL 04 AREA

A

A u th o r

Joseph Bernard Daly

35032

11/16/2021

1/8" = 1'-0"

LIGHTING PLAN LEVEL 4 AREA A

4' 8' 16' 32'0'

Scale: 1/8" = 1'-0"

1 AMENDMENT 4 11/17/2020

DNUP

V

V V V

V V V V

V

V

V

V

V V V

V V

V V V

VV V V V V

V

V

O

O

V V

O O O

O O O

O O O

O O O

O O O

O O O

O O O

O O O

O O O

O O O

V

V V V

O O

O O

O O

O O

O

GENERAL NOTES

A. COORDINATE EGRESS LIGHTING AND EXIT REQUIREMENTS WITH

ARCHITECTURAL LIFE SAFETY PLANS.

B. COORDINATE MOUNTING HEIGHTS AND LOCATIONS OF

LUMINAIRES IN MECHANICAL ROOMS WITH DUCTS, PIPES, AND

EQUIPMENT. MOUNT LUMINAIRES BELOW DUCTS AND PIPES AND

DO NOT MOUNT LUMINAIRES OVER EQUIPMENT. SUPPORT

LUMINAIRES INDEPENDENTLY OF DUCTS, PIPES, AND EQUIPMENT.

C. REFER TO EXTERIOR ELEVATIONS FOR MOUNTING HEIGHTS OF

EXTERIOR WALL MOUNTED FIXTURES.

D. LIGHT FIXTURES SHALL BE CIRCUITED FROM PANELS AS

INDICATED BY THE CIRCUITING BOUNDARY SHOWN ON THE PLAN

UNLESS NOTED OTHERWISE.

E. CONDUIT AND WIRING MAY NOT BE SHOWN GRAPHICALLY ON THE

PLANS. PROVIDE COMPLETE CONDUIT AND WIRING BASED ON

IDENTIFICATION OF CIRCUIT NUMBERS, RELAY NUMBERS, AND

SWITCHING IDENTIFICATION.

F. WHERE OCCUPANCY AND VACANCY SENSORS ARE SHOWN,

PROVIDE APPROPRIATE TYPES AND QUANTITIES OF SENSORS TO

ACCOMMODATE ROOM GEOMETRY. REFER TO SPEC SECTION

260923 FOR DETAILS. INSTALL OCCUPANCY AND VACANCY

SENSORS AT LOCATIONS RECOMMENDED BY MANUFACTURER.

SEE OCCUPANCY AND VACANCY SENSOR SHOP DRAWINGS FOR

REFERENCE.

G. ALL ELECTRICAL WORK TO BE COORDINATED WITH ALL

STRUCTURAL, MECHANICAL, PLUMBING, FIRE SUPPRESSION AND

DETECTION, A/V, TELECOM, AND SECURITY, AS WELL AS ALL

ARCHITECTURAL WORK.

11 12

13A

13A

13B

13B

12A

12A

12B

12B

AAAA

BB

CC

DD

D1D1

EE

FF

JAN

49C3

OFFICE

LARGE CONFERENCE

LARGE CONFERENCE

OFFICE

OFFICE

OFFICE

MECH

41C3

ELEC

TEAM

TELECOM

ELEV #10

E-10

TELECOM

43C3

STAIR #3

S-3

ELEC

45C3

ELEV #8

E-8

ELEV #9

E-9

ELEV #4

#4

ELEV #5

#5

STORAGE

413C3

X-LARGE CONFERENCE

OFFICE

OFFICE

OFFICE

OFFICE

TEAM

FOCUS

FOCUS

FOCUS

FOCUS

FOCUS

OFFICE

OFFICE

FOCUS

FOCUS

FOCUS

OFFICE

FOCUS

OFFICE

OFFICE

FOCUS

OFFICE

OFFICE

WOMEN'S

47C3

OPEN AREA

CORRIDOR

4300C3

VESTIBULE

NX1E

NX1

MEDIUM CONFERENCE

(TYP.)

b b b bbb

DG1

L A

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

R44A-12

RG1

R44A-11

RG1

R44A-11

RG1

R44A-11

RG1

R44A-12

RG1

R44A-11

RG1

R44A-11

RG1

R44A-11

RG1

R44A-12

RG1

R44A-11

RG1

R44A-11

RG1

R44A-11

RG1

R44A-12

RG1

R44A-11

RG1

R44A-11

RG1

R44A-11

RG1

R44A-12

RG1

RG1

RG1

RG1

RG1

PANTRY

L B

L B c c c ccc c c c c cc

(TYP.)

(TYP.)

DG1

DG1

cc

L B c c c c

DG1

FOCUS

DG3

DG3

DG3

DG3

DG3

DG3

DG1

DG1

DG1

DG1

DG1

DG1

NX1

NX1E

3 NX1

NX1

NX1

NX1

NX1E

NX1E

NX1

NX1

NX1E

P

STORAGE

STORAGE

RG2

RG2

RG2

RG2

RG2

RG2

RG2

RG2

NX1

NX1

NX1

NX1

NX1

NX1

NX1

NX1

NX1

NX1E

NX1

NX1

NX1

NX1

AG3

AG3

R43A-7

DG2R43A-8

DG2

R44A-7

DG2

R44A-8

DG2

R44A-7

DG2

R44A-8

DG2

R44A-7

DG2

R44A-8

DG2

R44A-7

DG2 R41A-3

DG2

R41A-4

DG2

R41A-3

DG2

R41A-3

DG2

R41A-4

DG2

R41A-3

DG2

CH1

CH1

CH1

CH1

CH1

DG3

DG3

EA2

EA2

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

EA2

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-7

DS1

R44A-8

DS1

R44A-7

DS1

R44A-7

DG2

R44A-8

DS1

R44A-13

DS1

R44A-14

DS1

R44A-13

DS1

R44A-7

DS1

EA2

R41A-1

JG1-8

R41A-2

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-2

JG1-8

FOCUS

R43A-8

DS1

D

EA2

EA2

EW1

EA2

EA2

EA1

EA2

EA2

EA2

EA2

EA2

EA2

EA1

EA2

D D D

D D

D D D D D D

DG1

DG1

DG1

DG3

DG3

DG3

D D

D

D

D

D

DDD

D D D

DG3

DG1

D D D

DG3

DG1

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

LG1-4

R41A-1

LG1-4

R41A-2

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

LG1-4

R41A-1

JG1-8

R41A-1

JG1-8

R41A-1

JG1-8

R41A-2

JG1-8

R41A-1

LG1-4

R41A-6

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-6

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-6

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-6

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-6

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-6

JG1-8

R41A-7

JG1-8

R41A-7

JG1-8

R41A-8

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-6

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-5

JG1-8

R41A-6

JG1-8

R41A-8

JG1-8

R41A-7

JG1-8

R41A-7

JG1-8

R41A-8

JG1-8

R41A-7

JG1-8

R41A-7

JG1-8

R41A-7

JG1-8

R41A-7

JG1-8

R41A-8

JG1-8

DS1 R44A-13

DS1

DS1

R44A-13

DS1

DS1

R44A-13

DS1

DS1

R44A-13

DS1

DS1

R41A-3

DS1

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

R41A-3

DS1

DS1

CH1

DG3

DG3

DG3

DG3

EA1

EA2

/1 E204A

/1 E204D

LCP-41A

AG1

AG1

AG1

AG1

a

WH2

R41A-3

CH1 R41A-3

CH1

ALL NORMAL POWER LIGHTING SHALL

BE CIRCUITED TO PANELBOARD LP-44;

UNLESS NOTED OTHERWISE.

ALL NORMAL POWER LIGHTING SHALL BE

CIRCUITED TO PANELBOARD LP-41A;

UNLESS NOTED OTHERWISE.

ALL NORMAL LIGHTING SHALL BE

CIRCUITED TO PANELBOARD LP-41;

UNLESS NOTED OTHERWISE.

ALL NORMAL LIGHTING SHALL BE

CIRCUITED TO PANELBOARD LP-42;

UNLESS NOTED OTHERWISE.

LP-41A

ALL EMERGENCY LIGHTING SHALL BE

CIRCUITED TO PANELBOARD ELP-34;

UNLESS NOTED OTHERWISE.

ALL EMERGENCY LIGHTING SHALL

BE CIRCUITED TO PANELBOARD

ELP-31; UNLESS NOTED OTHERWISE.

ALL EMERGENCY LIGHTING SHALL BE

CIRCUITED TO PANELBOARD ELP-31;

UNLESS NOTED OTHERWISE.

LG1-6

DG1

(TYP.)

DG1

LG1-6

DG1

(TYP.)

R41A-9

LG2

R41A-10

LG2

R41A-9

LG2

R41A-9

LG2

R41A-9

LG2

R41A-10

LG2

R41A-9

LG2

R41A-9

LG2

R41A-9

LG2

R41A-10

LG2

R41A-9

LG2

R41A-9

LG2

R41A-9

LG2

R41A-9

LG2

LG1-8

DG1

(TYP.)

a a

(TYP.) (TYP.)

LDD

LCC

LU

LW

LBB

LV

a a

LT LU

LW

LW

LV

LS 1

LX D

LN

LO

b b bb b b bb b b bb

LA LA LA3 3

bb a

LG1-6

LG1-6

(TYP.)

b b b bbb a a

LG1-6

(TYP.)

b b b bbb

LG1-6

CH2-3

CH2-4

CH2-4

R44A-14

DS1

R44A-13

DS1

NX1

R44A-14

DS1

R44A-8

DG2

DS1

DS1

DS1 3

DS1

R42A-4

DS1

R42A-4

DG2

DS1

DS1

R41A-6

JG1-8

R41A-6

JG1-8

R41A-6

JG1-8

R41A-6

JG1-8

R41A-2

JG1-8

R41A-2

JG1-8

R41A-9

LG2

LG2

R42A-4

DS1

Daylighting Zone Daylighting Zone

R41A-10

DG2

R41A-10

DG2

AH4

R41A-3

AH4

R41A-3

AH4

R41A-3

AH4

R41A-3

AH4

R41A-3

EA2

KEYNOTES:

1. EXISTING LIGHTING AND CONTROLS ARE TO REMAIN.

2. ADDITIONAL LIGHTING FOR STAIR 3 EXTENSION WITHIN

ALTERNATE IS SHOWN ON SHEET E015.

3. PROVIDE LOW VOLTAGE DIMMER SWITCH WITH TWO LIGHTING

ZONES:

BUTTON a: PENDANTS BUTTON b: DOWNLIGHTS

4. PROVIDE LOW VOLTAGE DIMMER SWITCH WITH THREE LIGHTING

ZONES:

BUTTON a: FRONT BUTTON b: CENTER BUTTON c: PERIMETER

5. DAYLIGHT ZONE CONTINUES TO SHEET E204A.

6. PROVIDE UL924 DEVICE TO ALLOW OPERATION OF EMERGENCY

LIGHTING WITH ROOM. LIGHT MUST COME TO FULL OUTPUT AT

LOSS OF NORMAL POWER.

A B

C D

HGA NO:

DATE:

CIVIL ENGINEER

WILES MENSCH CORP.

11860 SUNRISE VALLEY DR

SUITE 200, RESTON VA 20191

703.391.7600

FIRE PROTECTION

JENSEN HUGHES INC.

3610 COMMERCE DRIVE

SUITE 817,BALTIMORE, MD 21227

410.737.8677

ENVIRONMENTAL

AERO EH & S INC.

10310 BALTIMORE NAT. PIKE

ELLIOT CITY, MD 21042

410.480.3636

ACOUSTIC AND TECHNOLOGY

POLYSONICS

405 BELL AIR LANE

WARRENTON, VA 20186

540.341.4988

NO DESCRIPTION DATE

COPYRIGHT HAMMEL, GREEN AND ABRAHAMSON, INC.C

ISSUANCE HISTORY - THIS SHEET

ISSUED FOR

CONSTRUCTION

October 29, 2020

2111-092-00

KEY PLAN

GENERAL SERVICES

ADMINISTRATION

MID-ATLANTIC REGION

Public Building Services

100 S. Independence Mall West Philadelphia, PA 19106

PERIMETER EAST

BUILDING

BUILDING # : MD0547AQ

GSA PDN# : EP-47PD0119F0021

CONTRACT # : GS-07-P-15-UC-D-7000

6201 Security Boulevard Baltimore, MD 21235

SENSITIVE BUT UNCLASSIFIED

(SBU) - PROPERTY OF THE UNITED

STATES GOVERNMENT FOR OFFICIAL

USE ONLY - DO NOT REMOVE THIS

NOTICE - PROPERLY DESTROY

DOCUMENTS WHEN NO LONGER

NEEDED

S E

N S

IT

IV

E B

U T

U N

C L

A S

S

IF

IE

D

S

B U

P

R O

P E

R T

Y O

F T

H E

U N

IT

E

S S

T A

T E

S G

O V

E R

N M

E N

T C

O P

Y

IN

G ,D

IS

S

E M

IN

A

T

IO

N , O

R D

IS

T

R

IB

U T

IO

N

O F

T H

IS

D

O C

U M

E N

T S

T O

U N

A U

T H

O R

IZ

E

D R

E C

IP

IE

N T

S

IS

P R

O H

IB

IT

E D

. D o no t r em ov e th is n ot ic e.

P ro pe rly d es tr oy o r re tu rn d oc um en ts w he n no lo ng er n ee de d.

EXPIRATION DATE:

LICENSE NUMBER:

Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.

NAME:

/1 /2

:1

:4

P M

B

IM

/P

E B th

F lo o r

F it -O u t/ P

E B

E

L E

C

M .r v t

E204B

LIGHTING PLAN

LEVEL 04 AREA

B

A u th o r

Joseph Bernard Daly

35032

11/16/2021

1/8" = 1'-0"

LIGHTING PLAN LEVEL 4 AREA B

4' 8' 16' 32'0'

DN

UP

V V V V V

V V VV

V

V

V

O

O

V

V

O

O

O

O

V

P

O O O

O O O

O O O

O O O

O O O

O O O

O O O

O O

V

O O

O

O O

O O

O O

O O

O

O

O

O

O

O

V

GENERAL NOTES

A. COORDINATE EGRESS LIGHTING AND EXIT REQUIREMENTS WITH

ARCHITECTURAL LIFE SAFETY PLANS.

B. COORDINATE MOUNTING HEIGHTS AND LOCATIONS OF

LUMINAIRES IN MECHANICAL ROOMS WITH DUCTS, PIPES, AND

EQUIPMENT. MOUNT LUMINAIRES BELOW DUCTS AND PIPES AND

DO NOT MOUNT LUMINAIRES OVER EQUIPMENT. SUPPORT

LUMINAIRES INDEPENDENTLY OF DUCTS, PIPES, AND EQUIPMENT.

C. REFER TO EXTERIOR ELEVATIONS FOR MOUNTING HEIGHTS OF

EXTERIOR WALL MOUNTED FIXTURES.

D. LIGHT FIXTURES SHALL BE CIRCUITED FROM PANELS AS

INDICATED BY THE CIRCUITING BOUNDARY SHOWN ON THE PLAN

UNLESS NOTED OTHERWISE.

E. CONDUIT AND WIRING MAY NOT BE SHOWN GRAPHICALLY ON THE

PLANS. PROVIDE COMPLETE CONDUIT AND WIRING BASED ON

IDENTIFICATION OF CIRCUIT NUMBERS, RELAY NUMBERS, AND

SWITCHING IDENTIFICATION.

F. WHERE OCCUPANCY AND VACANCY SENSORS ARE SHOWN,

PROVIDE APPROPRIATE TYPES AND QUANTITIES OF SENSORS TO

ACCOMMODATE ROOM GEOMETRY. REFER TO SPEC SECTION

260923 FOR DETAILS. INSTALL OCCUPANCY AND VACANCY

SENSORS AT LOCATIONS RECOMMENDED BY MANUFACTURER.

SEE OCCUPANCY AND VACANCY SENSOR SHOP DRAWINGS FOR

REFERENCE.

G. ALL ELECTRICAL WORK TO BE COORDINATED WITH ALL

STRUCTURAL, MECHANICAL, PLUMBING, FIRE SUPPRESSION AND

DETECTION, A/V, TELECOM, AND SECURITY, AS WELL AS ALL

ARCHITECTURAL WORK.

107A

107A

107B

107B

108A

108A

106A

106A

F

F1

G

G2

G4 H

J

K K1

K2

L

LL

TELECOM

410C2

MECH

412C2

STAIR #2

S-2

ELEV #6

E-6

ELEV #5

E-5

ELEV #4

E-4

ELEV #1

E-1

ELEV #2

E-2

ELEV #3

E-3

ELEV LOBBY

410C6

ELEC

40C2

ELEC

BREAKROOM

TRAINING

OFFICE

OFFICE

OFFICE

OFFICE

ELEV CORE #1

EC-1

ELEV CORE #2

EC-2

ELEV CORE #3

EC-3

MEDIUM CONFERENCE

MEDIUM CONFERENCE

MEDIUM CONFERENCE

CALL CENTER

FOCUS

LARGE CONFERENCE

FOCUS

FOCUS

OFFICE

OFFICE

FOCUS

SMALL CONFERENCE

MEN'S

44C2

JAN

46C2

LOUNGE

48C2A

WOMEN'S

48C2

STORAGE

42C2

OPEN AREA

CORRIDOR

4200C2

ELEV LOBBY

VESTIBULE

NX1

NX1E

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

LG1-4

R43A-11

RG1R43A-11

RG1

R43A-11

RG1

R43A-12

RG1R43A-11

RG1R43A-11

RG1

R43A-11

RG1R43A-12

RG1

R43A-11

RG1

R43A-11

RG1

c c c c c cc c c c c c 3

DG1

(TYP.)

L B

L A

L AL A

bb

(TYP.) b b

L A

R43A-1

CG1

R43A-1

CG1

R43A-1

DG2

R43A-3

DG2

R43A-4

DG2

R43A-3

DG2 R43A-3

DG2

R43A-4

DG2

R43A-3

DG2

R43A-1

DG2

R43A-1

DG2

R43A-1

DG2

R43A-1

DG2

R43A-1

DG2R43A-2

DG2

R43A-1

DG2

bb bb

DG1

NX1E

NX1E

NX1

NX1

NX1

NX1

NX1

NX1

NX1

NX1E

P

NX1E

NX1

NX1

NX1

NX1

CH1

CH1

CG1

R43A-13

LH2

R43A-13

DG1

R43A-14

DG1

DG3

CH1

CH1

CH1

DG1

DG1

DG1

JG1-8

c

L C

L C a a a

R43A-6

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

R43A-15

DG2

NX1

R43A-8

DG2

R43A-7

DG2

R43A-7

DG2R43A-8

DG2

LG1-8

R44A-5

DS1

R44A-5

DS1

R44A-5

DS1

EA1

R43A-5

DS1

R43A-6

DS1

EA2

EA2

R44A-14

DS1 R44A-13

DS1

R44A-13

DS1

R44A-14

DS1

R44A-7

DS1

R43A-8

DS1

R44A-7

DG2

R44A-8

DS1

R44A-13

DS1

R44A-14

DS1

R44A-14

DS1

R44A-13

DS1

R44A-13

DS1

R44A-14

DS1

R44A-13

DS1

WH3

R43A-15

WH3

R43A-15

WH3

R43A-15

WH3

FOCUS

4024D D D D D

D D D D R43A-8

DS1

DG1

DG1

DG1

DG1

DG1

EA1

EA1

EA2

EA2 3

EA1

EA1

EA2

EA2

EA2

EA2

EA2

EA23

EA2

R43A-15

JG1-8

R43A-15

JG1-8

R43A-15

JG1-8

JG1-8

R43A-15

JG1-8

R43A-15

JG1-8

JG1-8

R43A-15

JG1-8

R43A-15

JG1-8

R43A-15

JG1-8

JG1-8

R43A-15

JG1-8

R43A-15

JG1-8

JG1-8

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

JG1-8

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

JG1-8

R43A-10

JG1-4

R43A-9

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

R43A-9

JG1-8

JG1-8

R42A-1

JG1-8

R42A-1

JG1-8

R42A-2

JG1-8

R42A-1

JG1-8

R42A-1

JG1-8

R42A-1

JG1-8

R42A-1

JG1-8

R42A-2

JG1-8

R42A-1

JG1-8

R42A-2

JG1-8

R42A-1

JG1-8

R42A-1

JG1-8

CG1

R43A-7

DS1

R43A-7

DS1

R43A-8

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

R43A-7

DS1

DD

R43A-7

DS1

R42A-1

JG1-8

R42A-1

JG1-8

R42A-1

JG1-8

R42A-1

JG1-8

R42A-1

JG1-8

R42A-1

JG1-8

/1 E204A

/1 E204D

LCP-43

AG1

AG1

R43A-5

DS1

R43A-5

DS1

R43A-5

DS1

R43A-5

DS1

R43A-5

DS1

R43A-5

DS1

R43A-5

DS1

R43A-5

DS1

R43A-6

DS1

R43A-5

DS1

R43A-5

DS1

R43A-5

DS1

R43A-5

DS1

R43A-5

DS1

R43A-5

DS1

R43A-5

DS1

R43A-6

DS1

R43A-5

DS1

R43A-5

DS1

R43A-5

DS1

R43A-5

DS1

R43A-1

AG2

R43A-1

AG2

R43A-1

AG2

R43A-2

AG2

R43A-1

AG2

R43A-1

AG2

R43A-2

AG2

R43A-1

AG2

R43A-2

AG2

R43A-1

AG2

R43A-15

WH3

R43A-15

WH3

R43A-15

WH3 3

WH3

ALL NORMAL POWER LIGHTING SHALL

BE CIRCUITED TO PANELBOARD LP-44;

UNLESS NOTED OTHERWISE.

ALL NORMAL POWER LIGHTING SHALL

BE CIRCUITED TO PANELBOARD LP-43;

UNLESS NOTED OTHERWISE.

ALL NORMAL POWER LIGHTING SHALL

BE CIRCUITED TO PANELBOARD LP-43;

UNLESS NOTED OTHERWISE.

ALL NORMAL POWER LIGHTING SHALL

BE CIRCUITED TO PANELBOARD LP-42;

UNLESS NOTED OTHERWISE.

LP-43A

ALL EMERGENCY LIGHTING SHALL BE

CIRCUITED TO PANELBOARD ELP-33;

UNLESS NOTED OTHERWISE.

ALL EMERGENCY LIGHTING SHALL BE

CIRCUITED TO PANELBOARD ELP-33;

UNLESS NOTED OTHERWISE.

ALL EMERGENCY LIGHTING SHALL BE

CIRCUITED TO PANELBOARD ELP-32;

UNLESS NOTED OTHERWISE.

a a a

JG1-8

b

JG1-8

c

JG1-8

b

JG1-8

b

JG1-8

b

LG1-8

a

LAA LBB

3 3

LQ

LR

DG3

R43A-14

CG1

R43A-14

CG1

bb b b a a

LG1-8

LF

LP

LN

LO

LG

R43A-9

JG1-4

LM

LN

LO

LN

LO

LA 3

LG

b b

R43A-9

CG1

b b bb

(TYP.)

LG1-8

(TYP.)

DS1

R44A-14

R44A-14

DS1

R44A-14

DS1

R44A-13

DS1

CH2-3

CH2-3

CH2-3

CH2-4

CH2-4

CH2-4

R43A-13

DG1

EA1

R44A-14

DS1

R44A-14

DS1

DG1

DG1

DG1

DG3

DG3

DG3

DG3

DG3

R43A-14

DG1

R43A-14

DG1 R43A-13

DG1

R43A-13

DG1 R43A-14

DG1

DG3

DG3

R43A-13

DG1

R43A-13

DG1

R43A-14

DG1

R43A-14

DG1

R43A-14

DG1

R43A-6

DS1

R43A-2

DG2

R43A-1

DG2

R43A-2

DG2

R43A-4

DG2

R43A-4

DG2

R43A-6

DG2

R43A-6

DG2

R43A-8

DS1

R43A-7

DS1

R43A-8

DS1

R43A-6

DS1

R43A-5

DS1

R43A-6

DS1

R43A-6

DS1

R43A-5

DS1

R43A-6

DS1

R44A-6

DS1

JG1-8

JG1-8

JG1-8

c

JG1-8

c

JG1-8

JG1-8

JG1-8

R42A-2

JG1-8

R42A-2

JG1-8

R42A-2

JG1-8

R43A-8

DG2

R43A-7

DG2

R43A-8

DG2

R43A-12

RG1

Daylighting Zone Daylighting Zone

R43A-5

AH4AH4

R43A-5

AH4

R43A-5

AH4

R43A-5

AH4

R43A-5

AH4

R43A-5

EA2

EA2

EA1

EA2

KEYNOTES:

1. EXISTING LIGHTING AND DEVICES TO REMAIN.

2. PROVIDE LOW VOLTAGE DIMMER SWITCH WITH THREE LIGHTING

ZONES:

BUTTON a: FRONT BUTTON b: GENERAL BUTTON c: EMERGENCY

3. PROVIDE LOW VOLTAGE DIMMER SWITCH WITH TWO LIGHTING

ZONES:

BUTTON a: PENDANTS BUTTON b: DOWNLIGHTS

4. PROVIDE LOW VOLTAGE DIMMER SWITCH WITH THREE LIGHTING

ZONES:

BUTTON a: FRONT BUTTON b: CENTER BUTTON c: PERIMETER

5. DAYLIGHT ZONE CONTINUES TO SHEET E204D.

6. PROVIDE UL924 DEVICE TO ALLOW OPERATION OF EMERGENCY

LIGHTING WITH ROOM. LIGHT MUST COME TO FULL OUTPUT AT

LOSS OF NORMAL POWER.

A B

C D

HGA NO:

DATE:

CIVIL ENGINEER

WILES MENSCH CORP.

11860 SUNRISE VALLEY DR

SUITE 200, RESTON VA 20191

703.391.7600

FIRE PROTECTION

JENSEN HUGHES INC.

3610 COMMERCE DRIVE

SUITE 817,BALTIMORE, MD 21227

410.737.8677

ENVIRONMENTAL

AERO EH & S INC.

10310 BALTIMORE NAT. PIKE

ELLIOT CITY, MD 21042

410.480.3636

ACOUSTIC AND TECHNOLOGY

POLYSONICS

405 BELL AIR LANE

WARRENTON, VA 20186

540.341.4988

NO DESCRIPTION DATE

COPYRIGHT HAMMEL, GREEN AND ABRAHAMSON, INC.C

ISSUANCE HISTORY - THIS SHEET

ISSUED FOR

CONSTRUCTION

October 29, 2020

2111-092-00

KEY PLAN

GENERAL SERVICES

ADMINISTRATION

MID-ATLANTIC REGION

Public Building Services

100 S. Independence Mall West Philadelphia, PA 19106

PERIMETER EAST

BUILDING

BUILDING # : MD0547AQ

GSA PDN# : EP-47PD0119F0021

CONTRACT # : GS-07-P-15-UC-D-7000

6201 Security Boulevard Baltimore, MD 21235

SENSITIVE BUT UNCLASSIFIED

(SBU) - PROPERTY OF THE UNITED

STATES GOVERNMENT FOR OFFICIAL

USE ONLY - DO NOT REMOVE THIS

NOTICE - PROPERLY DESTROY

DOCUMENTS WHEN NO LONGER

NEEDED

S E

N S

IT

IV

E B

U T

U N

C L

A S

S

IF

IE

D

S

B U

P

R O

P E

R T

Y O

F T

H E

U N

IT

E

S S

T A

T E

S G

O V

E R

N M

E N

T C

O P

Y

IN

G ,D

IS

S

E M

IN

A

T

IO

N , O

R D

IS

T

R

IB

U T

IO

N

O F

T H

IS

D

O C

U M

E N

T S

T O

U N

A U

T H

O R

IZ

E

D R

E C

IP

IE

N T

S

IS

P R

O H

IB

IT

E D

. D o no t r em ov e th is n ot ic e.

P ro pe rly d es tr oy o r re tu rn d oc um en ts w he n no lo ng er n ee de d.

EXPIRATION DATE:

LICENSE NUMBER:

Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.

NAME:

/1 /2

:1

:5

P M

B

IM

/P

E B th

F lo o r

F it -O u t/ P

E B

E

L E

C

M .r v t

E204C

LIGHTING PLAN

LEVEL 04 AREA

C

A u th o r

Joseph Bernard Daly

35032

11/16/2021

1/8" = 1'-0"

LIGHTING PLAN LEVEL 4 AREA C

4' 8' 16' 32'0'

DNUP

V V

V V

V V

V V

V V

V V

V V

V V V

VV V V V V

VV

V

V

V

V

V

V

V

V

V

O

O

O

V V

V

P

O O O

O O O

O O O

O O

O O

O O

O O O

O O O

O O O

O O O

O O O

O O O

O O O

O

O

O

O

O

V V V

GENERAL NOTES

A. COORDINATE EGRESS LIGHTING AND EXIT REQUIREMENTS WITH

ARCHITECTURAL LIFE SAFETY PLANS.

B. COORDINATE MOUNTING HEIGHTS AND LOCATIONS OF

LUMINAIRES IN MECHANICAL ROOMS WITH DUCTS, PIPES, AND

EQUIPMENT. MOUNT LUMINAIRES BELOW DUCTS AND PIPES AND

DO NOT MOUNT LUMINAIRES OVER EQUIPMENT. SUPPORT

LUMINAIRES INDEPENDENTLY OF DUCTS, PIPES, AND EQUIPMENT.

C. REFER TO EXTERIOR ELEVATIONS FOR MOUNTING HEIGHTS OF

EXTERIOR WALL MOUNTED FIXTURES.

D. LIGHT FIXTURES SHALL BE CIRCUITED FROM PANELS AS

INDICATED BY THE CIRCUITING BOUNDARY SHOWN ON THE PLAN

UNLESS NOTED OTHERWISE.

E. CONDUIT AND WIRING MAY NOT BE SHOWN GRAPHICALLY ON THE

PLANS. PROVIDE COMPLETE CONDUIT AND WIRING BASED ON

IDENTIFICATION OF CIRCUIT NUMBERS, RELAY NUMBERS, AND

SWITCHING IDENTIFICATION.

F. WHERE OCCUPANCY AND VACANCY SENSORS ARE SHOWN,

PROVIDE APPROPRIATE TYPES AND QUANTITIES OF SENSORS TO

ACCOMMODATE ROOM GEOMETRY. REFER TO SPEC SECTION

260923 FOR DETAILS. INSTALL OCCUPANCY AND VACANCY

SENSORS AT LOCATIONS RECOMMENDED BY MANUFACTURER.

SEE OCCUPANCY AND VACANCY SENSOR SHOP DRAWINGS FOR

REFERENCE.

G. ALL ELECTRICAL WORK TO BE COORDINATED WITH ALL

STRUCTURAL, MECHANICAL, PLUMBING, FIRE SUPPRESSION AND

DETECTION, A/V, TELECOM, AND SECURITY, AS WELL AS ALL

ARCHITECTURAL WORK.

7 8

10 11

13A

13A

13B

13B

12A

12A

12B

12B

FF

F1F1

GG

G2G2

G4G4

HH

J…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .