Pre-bid Photo Album No. 2 _11_12_2020.pdf
PDF 27 MB Posted
- Attached to
- Perimeter East Building Renovation and Upgrades Construction Project at the SSA Complex in Woodlawn, MD
- Solicitation number
- 47PD0121R0001
About this file
This document provides details regarding a federal construction contract opportunity for the Perimeter East Building Renovation and Upgrades project at the Social Security Administration campus in Woodlawn, Maryland. The General Services Administration intends to issue a request for proposal for approximately $30-50 million in renovations and improvements to the 90,000 square foot Perimeter East Building, including demolition and hazardous material abatement, cafeteria upgrades, mechanical system replacements, and addition of two exterior stair towers. The solicitation is expected to be released on October 26, 2020, with proposals due November 30, 2020 and contract award anticipated during the week of February 8, 2021. The contract will be awarded using a tradeoff evaluation considering both price and technical factors, with technical importance outweighing price. Interested parties must register at beta.sam.gov to access the solicitation and any amendments.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PEB 4th Floor and Cafeteria Expansion---- Photo Album #2
Pre-bid site photos 11/12/2020 and additional photos from files.
Exterior, North wall, looking down on site of OWS, ext doors, and future stair tower.
North side of bldg, facing south. Ext glass doors get replaced, left side of photo location of new stair tower.
North side of bldg., OWS, concealed door and sidewalk. Site of new stair tower.
G22 Communications storage room doors becoming part of kitchen expansion
Kitchen ceiling
Kitchen Dish Wash area and convection oven
Serving Area
Serving area ceiling
Excerpt below provides information on Utility Bldg; Systems impacted by BAS work Additional photos of Utility Bldg follow….reference only, does not depict contract work.
Utility bldg. piping
Utility Bldg
Utility Bldg with ceiling level conduits/piping
Facing North, lot between main PEB (left) and Utility Bldg (right)
Facing Northwest, loading dock doors and lot
RichardAFrattarelli Rectangle
Facing Southwest, South side of bldg. to the right
Facing West, South side of bldg.
Facing West, fire access road, North side of bldg.
River rock size. No good example of aluminum edge material between rock and grass.
Excerpt below provides information on PEB Air Handling System Reference only, does not depict or imply contract work. Refer to issued drawings/specs for contract work.
Depicts ballasted roof
RichardAFrattarelli Rectangle
File details come from the government source that posted it. Updated .