This solicitation document outlines a renovation project for approximately 47,000 square feet of space in the Robert N.C. Nix Federal Building and U.S. Post Office in Philadelphia. General Services Administration seeks proposals by May 29, 2020 to redesign and construct new spaces on the first floor and mezzanine level. Key aspects of the project include renovating former Post Office areas, installing a new lift, and modifying exterior ramps. Architectural and engineering plans dated April 10, 2020 provide specifications for the scope of work. A pre-proposal conference call will take place on May 5, 2020 to address any questions.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NIX USPO Request for Information Log - Updated 6/5/2020
SOLICITATION 47PD0120R0027
Proposal Due Date 06/12/2020
Date RFI # Relevant Document Company Question Govt Party Responsible Response
A N
S W
E R
E D
IN
A
M E
N D
M E
N T
1 Wu & Associates, Inc.
Most drawings aside from the civil sheets are not signed and sealed by the designers of record. Are these the final contract drawing sheets for bidding or will there be bid addenda with bubbled changes?
M+Sa, GSA
The AE will produce a conformance set at award that incorporates all amendments and RFI responses into a single signed/sealed drawing and specification set. Any pre-bid design changes will be issued via addenda with bubbles and a list of updates.
2 15950 1.3.B Wu & Associates, Inc.
Can the role of SSHO be performed by the Quality Control Manager or the Project Superintendent or is this a separate position?
GSA
Per part B in cited section (015950 - 1.3 - B) "The SSHO may be an individual with other responsibilities, already identified to be on site and who has the authority and appropriate knowledge to oversee and act on the provisions of this section." Further definition is provided in section 013100 -
1.4 - C: "Safety and Health Officer: Provide a safety and health officer whose duties shall consist of developing and implementing safety and health programs specified in Division 1 Section "Safety and Health." This designated officer should be on duty full time when work is in progress on site."
3 N/A Wu & Associates, Inc.
COVID-19 Impacts. Staffing at supplier and subcontractor offices required for bidding this work is limited at this time due to COVID-19. Can the bid deadline be extended by two weeks to help with this?
GSA GSA extending proposal deadline to 6/5/20, see amendment posted to betasam, RFI deadline extended to 5/22.
4 01 14 00 22 Wu & Associates, Inc.
Contract states "Refer to FAR 52.236-7" and E002 general note 2 states to "... obtain permits...". Are any City of Philadelphia or other permits required for this Federal project?
M+SA, GSA
Initial GSA Response: Generally no city, state, or local permits are required on interior federal projects. Where impacts to public sidewalk or disturbance of ground are planned please consult with local jurisdiction and state environmental authorities for proper procedure. Contractor shall responsible for all permit application and fees where required.
5 011400 1.1.b.13 Wu & Associates, Inc.
Contract states: "Contractors shall remove their trash and construction debris from the building daily; space constraints limit the size of dumpsters allowed. The delivery of dumpsters must be coordinated with Building Management and scheduled 72 hours in advance so as not to interfere with other ongoing construction projects." The project includes a minimum recycling requirement of 50%, which will require multiple dumpsters to achieve. What is the maximum number and size of dumpsters that can be staged on site?
GSA
Inital GSA response: Space usage (storage, trash, staging) within project footprint is perrogotive of contractor. Permanent or long term external dumpsters are not permitted without permission of building management and must be coordinated in advance. 5/11: a 20 yard dumpster is preferrable, as it will fit in a parking spot. If a 30 yard is necessary, it will need to be coordinated with building management.
6 018000 1.5.B Wu & Associates, Inc.
Request that Commissioning Authority (GPI, 52 Glenmaura National Blvd, Suite 302, Scranton, PA 18505) provide a draft project CX Plan. This will permit the General Contractor, Mechanical Contractor, Electrical Contractor, TAB Contractor, Controls Contractor and Plumbing Contractor to understand actual CX scope, interaction with LEED reporting requirements, budget for CX kickoff and subsequent coordination meetings. Also, will CX meetings be via teleconference or require travel to the project site?
AFG The Project (Commissioning Plan) Cx Plan will be uploaded into BetaSAM for all bidders to review. CX meetings can be conducted via teleconference.
7 01 73 10 1.4.1., MD107 & M106 Notes 3 Wu & Associates, Inc.
Contract states that "All roofing work shall be performed by a contractor certified by the existing roof manufacturer to maintain the existing warranty on the roof. Coordinate with government for roof warranty information." MD106 Notes 14 and 15 reference architectural drawings for roof patching information; however, there is no architectural roof patching information on the drawings. Please provide the existing roofing warranty and all architectural roof patching details required for pricing and construction.
GSA
Drawings and specs for the 2nd Floor Roof project can be provided. A warranty has not been issused yet because the project has not been completed yet.
Proposal Due Date 06/12/2020
Date RFI # Relevant Document Company Question Govt Party Responsible Response
A N
S W
E R
E D
IN
A
M E
N D
M E
N T
8 MD107 & M106 Wu & Associates, Inc.
Mezzanine Roof-level work. Is there service elevator access to both ends of the mezzanine roof level for mechanical work or will a crane rental and street outage(s) be required to hoist the five condenser units, curbs, piping, etc.?
GSA
Please coordinate crane lift with the field office. Most likely will need to be done on a weekend or holiday. The driveway cannot be co blocked off at any time.
9 05 12 00 Wu & Associates, Inc.
AISC Certification. Can AISC Certification requirement be waived since it greatly reduces the available fabricator/erector pool?
M+SA, GSA
KH (Structural Engineer/Consultant) finds it acceptable to waive the AISC requirement for this project, but the special inspector shall be required to visit the fabrication shop.
10 23 09 23 2.6.E. Wu & Associates, Inc.
HVAC Instruments & Controls 23 09 23 2.6.E. states that controls wiring of 30 volts or less is not required to be run within conduit. Please confirm that plenum rated wiring only without conduits is sufficient for low voltage controls wiring.
M+SA Installation of control wiring 30 volts or less does not have to be installed in conduit as long as all of the requirements of 2.6.E & G are maintained.
11 28 31 11 1.4.A Wu & Associates, Inc.
Fire alarm system. Description states: "At the time of survey, the existing system was a Siemens FireFinder XLS fire alarm system. A sperate project (by others was underway to replace the head end. The component of this project shall be compatible with the new system." What is the new FAS "head end" model/version and what is the contact information for its service contractor?
GSA Fire panelFCM2041-U2 DESIGO OPERATOR INTERFACE
12 23 20 00 3.2.A Wu & Associates, Inc.
Condensate, supply and return piping joint types. 2” dia. and smaller copper piping joints are called to be soldered. This will require extensive hot work. Would compression-type fittings, such as ProPress with 50-year warranties, be acceptable for this application?
M+Sa
Yes, Press-seal fittings (test to 130 psig) are acceptable for 2" dia and smaller copper piping joints for condensate, supply and return piping in addition to soldering.
13 N/A Wu & Associates, Inc.
Domestic plumbing piping and insulation. Please provide specifications for sanitary, hot and cold water supply piping, fittings and insulation for the domestic plumbing system.
Would compression-type fittings, such as ProPress with 50-year warranties, be acceptable for the small dia. (presumably copper) water lines ?
M+Sa
Domestic plumbing piping is specified in Section 232000 - Building Services Piping. Domestic piping insulation is Specified in Section 230700 - Mechanical Insulation. Domestic water copper piping shall have lead free soldered fittings per GSA PBS-100 Facilities Standards for the Public Buildings Service. Compression-type fittings are not acceptable.
14 06 40 23 multiple paragraphs but particularly 1.10 Wu & Associates, Inc.
AWI certified manufacturers and installers required for casework and trim. The impacts of this are the same as the AISC in that there are some manufacturers and very few installers, and that many won't bid on this sort of project. Can AWI requirement be waived?
M+SA, GSA M+Sa is willing to waive the AWI requirement. GSA concurs with the A/E - M+Sa.
15 015000 1.3.D Wu & Associates, Inc.
The specifications require a minimum temperature of 40°F at the working surface. Based on the mechanical engineer's energy modeling, how many supplemental electric heating BTUs would be required to maintain 40°F if all three air handlers, CUHs and FCUs were out of service simultaneously during typical winter months? Also, is there a maximum temperature limit?
M+Sa This is a performance based requirement for the contractor's means and methods to determine.
16 015950 1.4.A & 3.1.A Wu & Associates, Inc.
The specifications list Lead, Asbestos, and PCBs as potential safety hazards and the possibility of required contractor hazmat testing. Have existing to be demolished materials been tested for asbestos (flooring), lead (paint) or PCBs (light fixture ballasts)? If so, please provide the reports. If these materials are suspected and identified during construction will the GSA manage testing and abatement as applicable or require the GC to test and abate? If the GC would be responsible for testing and abatement, what requirements would apply (local/state permits, independent air monitoring, abatement plan submittal, etc.) and how would this be paid for?
M+Sa A haz mat report will be posted to BetaSam.
Proposal Due Date 06/12/2020
Date RFI # Relevant Document Company Question Govt Party Responsible Response
A N
S W
E R
E D
IN
A
M E
N D
M E
N T
17 Mechanical drawings Wu & Associates, Inc.
Mechanical scope questions:
a) Where is MD-105 key note #2 indicated on sheet?
b) Where is MD-106 key note #13 indicated on sheet?
c) Where is M-103 key note #1 shown for ACU-3 (is this unit located in Room 177?)?
d) M-103 key note #2 - what item is to be connected to the 1.25” dia. drain line in Room 142A since ACU-2 condensate drains elsewhere?
e) Where is M-105 key note #12 indicated on sheet?
f) M-201 - Are condensate drain lines or leak detection cables required for the M-105 key note #14 FCU emergency drip pans? If drain lines are required, must they be insulated?
M+Sa
a) Note 2 references the air device near column C-8 that currently referenced by Note 1. The device is actually located in the existing toilet room located just to the south of the existing shown location. The drawing will be revised to show this in the next submission. b) Note 13 is a repeat of Note 12 and will be changed to Not Used in the next submission. c) ACU-3 is located over the door of Room 177. Uint will be tagged and reference note will be added in the next submission. d) Drain is from the fan coil units on the mezzanine. See drawing M-201 for continuation. e) To the right of colums C-17. f) Provide liquid sensor to de-energize unit upon detection of liquid, see Detail on sheet M-502.
18 CS101 Wu & Associates, Inc.
Sheet CS101 has notes 'Proposed concrete wall with stone veneer typical, see structural plans'. The plan sheet associated with these walls S2.0 does not show stone veneer. What is required at those concrete walls?
M+Sa The stone veneer is indicated on the dwg A-704.
19 102219 § 2.2H, 2.2P Wu & Associates, Inc.
In the demountable specification section 102219 Part 2 section 2.2 H. calls for 1/2” clear tempered laminated glass. However, section 2.2 P. calls for standard fully tempered clear float glass and double glazing fully tempered clear float glass. Which one is correct, clear tempered or clear laminated?
M+Sa
There are four diferent mfrs listed who are capable of providing the glazing system assemblies. Each may have a slightly different way of detailing their systems. Generally 1/2" laminated is the preferred material, but some mfrs may use 1/2" tempered glazing for doors.
20 050170.51 3.7.C.1 , E-802 Note 8 Wu & Associates, Inc.
050170.51 § 3.7.C.1 requires that historic light fixtures be cleaned in the field while Sheet E-802 SPECIFICATIONS
FOR RESTORATION OF HISTORIC LIGHTING FIXTURES
note #8 requires these fixtures to be restored by one of four out-of-state companies. Can fixtures be shipped off site for restoration work or must one of the approved restoration companies set up shop on site to clean and re-lamp the fixtures?
M+Sa
All historic lighting should be shipped off site for restoration/repair as is common for this type of work. However, if the restorer feels that some work can be performed in the field, the restorer should review proposed procedures with the Architect and GSA prior to starting work.
21 230500 §3.20, E-805 Wu & Associates, Inc.
Will any after-hours outages be required for Sheet E-805 circuit breakers and feeders’ termination work? Can substations be worked on while energized if electricians utilize proper PPE?
M+Sa
An after-hours outage (coordinated and approved by the GSA) of the substation is anticipated when working within the substations. Electrical Contractor is responsible for conducting work in accordance with OSHA regulations and NFPA 70E requirements which do not permit live electrical work for this application. Substations shall be deenergized while performing work on them.
22 260923 §2.3, E402/6 Wu & Associates, Inc.
Please confirm that digital lighting control head end controller is by contractor and that nLight model NECY is compatible for integration with existing DDC system.
M+Sa
Digital lighting control system headend equipment is by the Contractor as indicated on 2/E701, 1/E701 drawing note 1, and Specification Section 260923. Provide necessary lighting control system components and/or gateways to integrate with existing building automation system. Contractor shall confirm with lighting control manufacturer/vendor/distributor to determine exact component model numbers to provide specified functionality.
As described on E701, contractor shall prepare detailed shop drawings indicating all components necessary.
23 E-402 Note 6 Wu & Associates, Inc. Diplomatic security drawings are needed to quantify scope of additional electrical work referenced on E-402 note 6. M+Sa, DoS Per Dept of State: All Diplomatic Security electrical requirements are listed in pages TY-600 and TY-610
24 E-401 Wu & Associates, Inc.
Please confirm which telecom equipment (e.g., patch panels) and wiring and termination work is by tenant versus contractor and what contractors’ installation and testing scope of work is. A matrix of all major telecom equipment items, who supplies, who installs and who tests should reduce commissioning and turnover conflicts.
M+Sa
All items/work indicated on E-401 (and all other drawings and related specifications) are work to be provided and performed by the contractor unless specifically otherwise indicated. Refer to Division 27 Specification Sections for more information. Refer to notes on drawings E-003 for additional clarification.
25 ET-102 - special note 5, E003 Paging Requirements Wu & Associates, Inc.
Dashed lines associated with ET-102 special note 5 don't make sense. General note #5 calls for cabling for paging system and references “tenant supplemental drawings”.
Sheet E003 PAGING REQUIREMENTS references cables and supports. Please provide supplemental documents and clarify paging system scope of work.
M+Sa
"The dashed lines are below-slab conduits in accordance with wiring convention defined on drawing E001. Special Note #5 is pointing to these conduits to define the conduit size.
General note #5 - GSA/DoS needs to provide the paging drawing as part of the bid package to the contractors as DoS did not want Henry Adams putting this information on our drawings."
Proposal Due Date 06/12/2020
Date RFI # Relevant Document Company Question Govt Party Responsible Response
A N
S W
E R
E D
IN
A
M E
N D
M E
N T
26 ET-101 Wu & Associates, Inc.
Only one conduit route on sheet ET-101 calls for pull strings.
Is the contractor to provide telecom and data wiring for all the other conduit banks on this and other data drawings?
Terminate in field only, or at data racks ends as well? If all cabling is provided by contractor, can plenum rated cabling without conduits be used above ceilings?
M+Sa
For the conduit runs noted to provide pullstrings only, cabling will be provided by the Owner. All other conduits provide pathways for cabling that is to be provided by the Contractor. Read the Special Notes pointing to pull boxes and conduits. Refer to the details indicated in the Special Notes.
Terminate all cabling at both ends.
Per Drawing Note #3, all communications cabling in basement shall be routed in conduit, so that the cabling is not easily tampered with outside the tenant space. Plenem rated cabling is not permitted as a substitute to conduit. All cabling must be plenum rated per specifications in division 27.
27 EP-106 Wu & Associates, Inc.
Does the six-seat countertop island in Breakroom M102 (between columns H14 and K15) get through-floor stub ups for two outlets for microwave niche in casework or are these fed some other way?
M+Sa Yes, these outlets will need through-floor stub ups.
28 EL-101 note 4, EL-102 note 5 Wu & Associates, Inc.
Surface-mounted exit sign and light fixtures shown mounted to de-mountable partition system mullions @ 9 locations. Can feeder conduits for these fixtures be surface-mounted or must these be snaked through the mullions?
M+Sa
Per Electrical Luminaire Schedule, Luminaire Type HE2 is photoluminscent and does not require a power connection. This is the only luminiare type shown mounted to the partitions.
29 ED-104 special note 4 Wu & Associates, Inc.
Sheet calls for removal of column-mounted receptacle at 3 locations. The columns are clad in stone and no new outlets shown at these locations. Is patching with cladding stone required? Is there attic stock cladding stone available on site?
M+Sa Patching is not required. Provide a blank cover plate in accordance with "General Electrical Demolition/Renovation Notes" Note #14 on drawing E002.
30 EP-104, ET-103 Wu & Associates, Inc.
Four stone-clad lobby columns at column line B and column lines 13, 14, 15, 16 call for power and data jacks. Are these fed up through the historic terrazzo flooing via poke-throughs and routed via surface mounted conduits to the face of the stone cladding? Dropped through the plaster ceiling?
Cladding removed so that conduits can be concealed?
Please provide outlet mounting details.
M+Sa
"Power and data wiring for these outlets can be run above the drop ceiling (refer to Drawing A-103B) that aligns with the columns, and then routed through the built-out columns. See plan details on A-515.
This will require the removal of the marble panel on the column behind each monitor in order to channel/core the existing concrete to accommodate conduit and boxes after which the marble panel can be reinstalled."
31 Electrical Wu & Associates, Inc.
At existing to remain walls and column faces, can power and data outlets and feeder conduits generally be surface mounted?
M+Sa
In general, no they cannot. Devices and raceways can only be surface mounted where recessed mounting and concealed routing is not physically possible due to existing building finishes (such as historic stone). Where physically possible such as within a hollow wall or ceiling cavity, they shall be concealed within building finishes. Refer to Specification Section 260533 paragraph 3.1.B.2 for more information. All conduit in the historic Lobby should be concealed. Specific exceptions in other areas should be reviewed with the Architect. Every effort has been made in the design to eliminate or minimize exposed conduit.
32 All Wu & Associates, Inc.
During the NIX USPO Re-Design Pre-Bid Meeting it was stated that certain noisy or odorous work actives would require to be performed off-hours. What are the noise limits for work (e.g., 90dB for five minutes or less)? What smelly work will require off hours work (e.g., soldering copper water lines, painting lobby ceiling, gluing down flooring). Off shift work impacts GC and subcontractor labor costs.
M+Sa, GSA All noise related work will cease by 8am and may resume after 5pm. Noise that cannot be heard outside of the space is acceptable.
33 Spec N/A Glidden manufacturer name change M+Sa Paint section 099100 2.1 Change Glidden to PPG Industries.
33 Bid Form item 19 Wu & Associates, Inc.
What is the quantity unit for the "ductwork" line item? SF, LF or other? And, if unit pricing is needed here, is this ductwork:
New or existing to be removed? Lined or unlined? Exposed or concealed?
M+Sa Cost per pound of new ductwork, concealed.
34 A103B Wu & Associates, Inc.
Where the new beams are being installed along column line B, what is the finish method and attachment method for the finish to the bottom of the beam?
M+Sa See Dtl 3/A-516
35 S1.1.B, 4&5/S2.2 Wu & Associates, Inc.
W12x40 installations are shown on column line B in the adjudication area, spanning from column to column. An existing terracotta wall rests on the existing beam to be removed, and so as a result during beam replacement the existing masonry wall will be unsupported over a 24 foot span. Is it the intention in this project to completely dismantle and reconstruct the masonry walls to the second floor deck or to remove the facings and needle supports above the new beam location so as to support the wall during beam replacement?
M+Sa
Per 5/S-2.2, the design intent is for the contractor to design & provide temporary support of the existing wall assembly prior to removal of the existing concrete encased beam. Potential shoring options may include: - Needle supports through the wall; -Temporary shoring for the existing window and reconstruction of the terra cotta wall between the window and new steel beam. However, all existing conditions should be field surveyed prior to the completion of any temporary shoring designs.
Proposal Due Date 06/12/2020
Date RFI # Relevant Document Company Question Govt Party Responsible Response
A N
S W
E R
E D
IN
A
M E
N D
M E
N T
36 Solicitation § IV.K Wu & Associates, Inc.
Please confirm that the Small Business set-aside for this project is met by a Joint Venture only if the JV is approved by an existing SBA approved 8(a) Mentor-Protégé Program.
GSA
See updated language in most recent amendment for clarification on joint venture requirements. There are several ways in which businesses can join forces to form a joint venture and still qualify as a small business. However, if a small business wants to form a joint venture with a large business for a small business set-aside, it must formally be approved by SBA as a Mentor- Protege JV.
The regulations governing joint ventures are explained in detail in 13 CFR
125.8 or on the Small Business Administration website.
37 A-704, 015000 §1.5.D & 3.4.E Wu & Associates, Inc.
Turnstile entrances conversion work will be multi trade over multiple days. For temporary security, will a 3/4" plywood and 2x4s barrier set adjacent to the location of future storefront suffice for overnight and weekend protection or are additional security measures required?
M+Sa, GSA It must be secured to prevent entry to the building. 3/4" plywood would suffice, but it must be affixed and prevent entry. We are open to suggestions from the contractor.
38 102219 § 1.7.a.1 Wu & Associates, Inc.
Section 102219 § 1.7.a.1 Extra Materials calls to supply a full size unit of each type of demountable partition. Given that the partitions shown on sheets A501 and A502 are of varying sizes, this could mean supplying a duplicate for all installed systems. What is specifically required to be supplied as extra materials for this project?
M+Sa, DoS It is not necessary to provide extra materials.
40 Specs section 05.12.00 Structural Steel MJ Settelen Construction, LLC Specs call for the steel fabricator and erector to be AISC certified. Is this going to be mandatory? M+Sa
See RFI #9 response, pasted below for reference: It acceptable to waive the AISC requirement for this project, but the special inspector shall be required to visit the fabrication shop.
41 Specs section 10.26.00 MJ Settelen Construction, LLC Corner guards: (1) Sheet A-812 Finish Schedule calls for corner guards to be by MOZ. Does this just apply to the square columns in open area 150 as shown on A-814B?
M+Sa Sheet 814A & B and 815 show all corner guard locations throughout plans.
See legend for stainless or plastic.
42 Specs section 10.26.00 MJ Settelen Construction, LLC What is required at the 90 degree corners? Some are shown to be plastic & some to be by MOZ. Spec section 102600 & the finish schedule are in conflict. Which is to be used?
M+Sa, DoS Both are used see sheet 814A, B and 815 and legend.
43 Specs Divisions 26 & 27 MJ Settelen Construction, LLC What is the desired battery runtime for the UPS unit? M+Sa, DoS DoS specified and confirmed (8) hours and manufacturer has to be APC..
44 Specs Divisions 26 & 27 MJ Settelen Construction, LLC The specifications for the UPS systems call for racks to house the UPS and battery cabinets. Are these racks supposed to be 4 post open racks or enclosed?
M+Sa, DoS
Open Rack is acceptable. DoS prefers in racks like this - see the photo ----> https://www.apc.com/shop/us/en/products/APC-Symmetra-LX-12kVA- Scalable-to-16kVA-N-1-Rack-mount-208-240V/P-SYA12K16RMP
The rack would be similar to the one shown.
APC Symmetra LX 12kVA Scalable to 16kVA N+1 Rack-mount, 208/240V -
APC USA
APC Symmetra LX 12kVA Scalable to 16kVA N+1 Rack-mount, 208/240V Highly available single phase UPS features redundant and scalable double-conversion on-line power protection Includes: CD with software, Documentation CD, Installation Guide, Rack Mounting support rails, Temperature Probe, User Manual, Web/SNMP Management Card www.apc.com
45 Specs Division 8 MJ Settelen Construction, LLC Openings 172A and 174 are aluminum Doors with a HM frames? M+Sa
Door 172A and 174 are sliding glass doors as part of the glazing system assemblies. They do not have HM frames.
46 Specs Division 8 MJ Settelen Construction, LLC What are the hardware requirements for openings ST2-1A, G-1? M+Sa, DoS
These are existing doors with existing hardware. Any changes required to these doors will be handled between the tenant and GSA. For ST2-1A assume 'passage set' (per Dept of State).
47 Specs Division 8 MJ Settelen Construction, LLC Opening 190A Stainless Steel door in aluminum frame , what are the specs for this door? M+Sa The intent is to salvage one of the existing stainless steel or aluminum clad doors in the Lobby or Credit Union for reuse at this location.
48 Specs Division 8 MJ Settelen Construction, LLC What are Type E Doors? M+Sa Type E should be listed as Type NE: existing original entry doors that are to remain.
49 Specs Division 8 MJ Settelen Construction, LLC Please confirm any ballistic doors/frames? M+Sa The ballistic doors and frames are the ones located in the ballistic glazing system. See BR notation in Misc column.
50 Specs Division 8 MJ Settelen Construction, LLC Please confirm that M102-1,M102-2 and 145 are sidelight frames. M+Sa These doors all have sidelites.
51 Specs Division 8 MJ Settelen Construction, LLC Hardware Sets Section 080671, that is referenced in the hardware Spec’s on Page 16. Please let me know where I can find them.
M+Sa Delete this reference.
Proposal Due Date 06/12/2020
Date RFI # Relevant Document Company Question Govt Party Responsible Response
A N
S W
E R
E D
IN
A
M E
N D
M E
N T
52 Specs Division 8 MJ Settelen Construction, LLC Exit Devices, Locksets, Electric Hinges, core are provided by DOS, is that correct? M+Sa, DoS
As noted in the door notes, all locking hardware to be provided and installed by tenant. See also Door Hardware key for additional information on components to be supllied by contractor. Exit Devices, Locksets, Electric Hinges, core are provided by Dept of State as well. Dos has confirmed that this is correct.
53 NA MJ Settelen Construction, LLC Can experience be outside the described list in the RFP, in regards to year or project size? GSA Refer to Amendment 0005 1.b and 1c
GSA Solicitation No 47PD0120R0027, Section II.D Technical Proposals and
SF1442
Magnum Inc.
As this project is a 100% Small Business Set-aside: Please provide clarifying language ensuring that only the relevant "Prior Experience" and "Past Performance" of the managing partner (i.e. the SBE) of any/all Joint Ventures, Teaming Agreements, Mentor-Protege or other entity type(s) submitting a proposal for this project will be considerd when evaluating Technical Proposals. The use of a Large Business' prior experience/past performance would put a true stand alone Small Business Enterprise at a disadvatage by comparison. As this is a Small Business Set-aside there should be a level playing field for all prospective bidders, not allowing an advantage by use of Large Business' prior/past experience to tip the scales. Since the intent of the Solicitation is to be a 100% Small Business Set aside it is imperative that clarifing language be added to the Solicitation.
GSA
For Joint Ventures; projects may be submitted for the Joint Venture as an entity or for individual members of the joint venture. All firms in a Joint Venture arrangement must display prior experience under this factor either as an individual firm or Joint Venture.
55 N.A GSA Please confirm that there is no general or architectural demolition work at the basement level. M+Sa
The new lift and the exterior ramp construction will require basement access during demolition to complete the modifications, as well as to protect the basement materials and equipment.
56 224000 § 2.1.E Wu & Associates, Inc.
P-304 and P-305 Lavatories feature electronic faucets that require AC power. What panels and circuits are these faucets fed from? (It might be logical to switch to a battery powered model.)
M+Sa
Battery powered plumbing fixtures are not acceptable. 120-Volt circuits for these fixtures will be provided in forthcoming addendum. These circuits will originate from the applicable "L1_" panel in the corresponding electrical closet/room for the area as identified on the circuit zoning keyplan on E004.
57 P101/102, M101 Wu & Associates, Inc.
Please provide basement level P101/102 and P401/1 plumbing work area photos. Are there any obstructions to work from a ladder such as casework or FF&E? Overhead obstacles such as bldg. structure to be routed around?
Please repeat this for M101 ductwork work areas.
GSA We will now be providing site tours that should address this, additional photos to be provided if still necessary
58 P102 Wu & Associates, Inc. Are the water lines shown without diameters indicated near column C15 existing to remain? M+Sa
The water line shown in the basement near column C15 are existing to remain.
59 220800 § 3.2.B Wu & Associates, Inc.
Plumbing Systems Commissioning spec section 220800 references items not indicated on the plumbing drawings including Automatic Temperature Controls, Domestic Hot Water Pumps, Mixing Valves, Thermometers, and Water Heater but not electronic faucets, water coolers or bottle fillers that are in scope. Is this CX spec applicable to this project?
AFG/GPI
As per specification section PLUMBING SYSTEMS COMMISSIONING 220800 paragraph 1.3 the domestic hot water system and the water fountains shall be commissioned.
The domestic hot water system shall include:
* Hot water recirculation balancing valves
* Lavatory and sink faucets
* Mop service basin faucet
* Shower The water fountains shall include:
* Water coolers
* Drinking fountain
* Bottle fills
60 A402 detail 7 Wu & Associates, Inc.
Sheet A402 detail 7 shows a 3" terrazzo tile to be used for base, while the finish schedule for base on sheet A813 calls for the use of a poured terrazzo base. Is 3" height terrazzo tile to be used for base or is an integral base poured to the floor to be used?
M+Sa The new base should be terrazzo tile to match the new floor.
61 A810 Wu & Associates, Inc.
Sheet A810 calls for the existing terrazzo to remain to patched in rooms 120, 121, 122, 123, 124, and 125. It is not clear from drawing AD-101B that existing terrazzo flooring extends to the full limits of those rooms. Does the existing terrazzo extend to the full extent of those rooms, and if not, what is required in those areas of those rooms where there is no terrazzo?
M+Sa There is existing terrazzo in the former public mailbox alcove and in the service area behind on three sides. It is unknown if the terrazzo continues under the existing mailboxes and writing table(s).
Proposal Due Date 06/12/2020
Date RFI # Relevant Document Company Question Govt Party Responsible Response
62 Scope includes full demo of both vaults and wall between. Magnum Inc.
Please provide Wall- height ,thickness, reinforcement details, Or provide existing as built. Also ,drawing indicates removal between the two vaults(very wide) Is this also a concrete wall
M+Sa
Per drawings, the scope includes full demo of both vaults, adjoining walls, doors, and ceilings. Assumption by bidders should be the construction is that of a typical concrete structure with reinforcement necessary for use as a secure vault in original building design. Detail section will be provided from original building documents to show probable construction and reinforcement methods, though not specific to these vault locations.See attachment.
63 Spec. -013100--Par.C.4 Magnum Inc. As indicated please have Contracting Officer provide list of acceptable Facilitators, required for partnering meetings. GSA
If needed, GSA can provide a list of facilitators after award that have specific previous experience on GSA capital projects. In general, the qualifications for an acceptable professional facilitator is defined as "experienced in leading the team in a timely manner and ensuring issues are identified and resolved" and can be identified through market research as part of a service commonly provided in the construction industry .
64 Spec-.096400 Magnum Inc.
Spec. Includes repair and replace wood floor. Since extent of this work can not be determined, please include in offer sheet an allowance and or a unit price for 1- repair wood floor, 2- replace wood floor
M+Sa M+Sa to update unit price sheet with allowance for additional wood floor replacement (100 SF)
65 Spec.-078100 Magnum Inc.
Is all new steel framing to receive Applied Fire Protection?.
Also where existing concrete encasement of existing steel is removed for new work can it be replaced with Applied Fire Protection ?
M+Sa
New exposed steel framing supporting floors or structural elements should receive fire protection to maintain fire ratings as in dicated in the architecutral drawings. Areas of concrete encasement removal can be replaced with fireproofing; application to be coordinated with fireproofing manufacturer and architects.
66 Amendment #2 -Renovation Project Standards section Magnum Inc.
Have all requirements and products referenced in Project Standards been incorporated in plans and specs.? If not are we to bid per Project Standards or Plans and specs? Please clarify
M+Sa, DoS, GSA, AFG Project Standards is a supplemental document to the Bid Docs and contractors shall submit their bids per plans and specifications.
67 SIEMENS INDUSTRY, INC
1-After reviewing the bid docs, there are no areas identified as requiring anti-spying designs, but there are areas labeled meeting and conference rooms which may become SCIF (Sensitive Compartmented Information Facilities) classified. Are the meeting/conference rooms going to be classified as SCIF rooms?
M+Sa, DoS DoS does not do SCIFs in passport agencies. The meeting and conference rooms will be non-secure locations.
68 SIEMENS INDUSTRY, INC
2-Are there any pretesting requirements that would need to be completed on the fire alarm prior to any demo or construction work?
M+Sa JH Response: There are no pre-testing requirements. It is our understanding that the fire alarm system is in proper working order prior to the work being completed.
69 FA-001, FA101A/B Wu & Associates, Inc. check w/ alison/msa for respnose M+Sa JH Response: Exisitng conduit can be reused for the historic spaces to minimize the impact to historic finishes.
70 211313 § 3.6.A.1 Wu & Associates, Inc.
What is the hydrostatic test pressure and duration for the FSS (e.g., 200 psi for two hours)? If there are leaks in existing to remain piping/fittings that serve the lobby area, how will they be addressed?
M+Sa JH Response: Per NFPA 13 Section 10.10.2.2.1, the gauge pressure for a hydrostatic test should be 200 psi, or 50 psi in excess of the system working pressure, whichever is greater.
71 211313 Wu & Associates, Inc. Is concealed sprinkler piping to be painted red? M+Sa JH Response: Concealed sprinkler pipe is not required to be painted red.
72 FX-001 note 27 Wu & Associates, Inc. What is the contact information for the building's existing fire sprinkler system contractor? GSA Field Office John Stefnelli, A&S Sprinkler Co. 267-246-1668
73 FA-101A Wu & Associates, Inc. What does "T" denote in rooms 183, 184 & 187A/B/D/E? M+Sa "T" = Toilet room.
74 FA-102 Wu & Associates, Inc. Does smoke detector shown outside elevator shaft #141 interact with elevator controls? M+Sa, GSA JH Response: The smoke detector does not interact with the elevator controls as this is just a lift.
75 087100 § 3.9 Wu & Associates, Inc. In door hardware key, what/who is "DOS"? GSA Department of State (Clienty Agency)
76 A810 Wu & Associates, Inc.
Sheet A810 finish schedule has the floor in corridor 130B listed as resilient sheet flooring, while sheet A814B shows corridor 130B where it runs north and south to be existing wood to be refinished to tie into rooms 150 and 130. What is the floor finish required in this corridor?
M+Sa
There are two areas labeled 130B. The corridor outside the lift and janitor closet should be finished with RS-1 as indicated on drawing sheet A -814B and schedule A-810. The north south corridor in the main space, also labeled 130B should be refinished wood.
77 A810 Wu & Associates, Inc.
Sheet A810 finish schedule calls out stairs ST2-1 and ST1-1 to receive rubber stair treads, risers, and at landings.
However sheet A814B does not show this, and it isn't clear on ST1-1 if the new treads and risers are to go to the basement.
What is the scope and type of flooring in stairs ST2-1 and
ST1-1?
M+Sa, DoS, GSA Both existing stairs to get new rubber treads and landings. Risers to be painted. Treads in Stair 2 should be conintued down to the basement.
Proposal Due Date 06/12/2020
Date RFI # Relevant Document Company Question Govt Party Responsible Response
78 A105 Wu & Associates, Inc.
Sheet A105 has ceiling type 4 indicated in rooms 156, 157, 158, 159, 173, 174, 175, 176, and 178A. On sheet A010 ceiling type 4 is noted as having 10" cold form joists and to see the structural drawings. The structural drawings do not indicate this construction in those rooms. What is required for the intermediate structure in these rooms?
M+Sa
See structural sheet 2-0.0. Under section Delegated Design Items, note 1.D indicated that cold formed steel framing is to be engineered by a licensed professional engineer. The intermediate framing is to support an provide an attachment point to the suspended ceilings.
79 A010, A105, 054000 § 2.1.B.1. Wu & Associates, Inc.
Where cold form framing joists are shown on the structural plan sheets what is the on center spacing for those joists?
What is the spacing for the cold form joists shown on sheets A010 and A105 for intermediate framing?
054000 § 2.1.B.1. states to: “submit calculations signed and sealed by a Professional Engineer...” However, this requirement is listed under “Component Design” and not clearly requiring a delegated design engineered shop drawing. Are signed and sealed shop drawings required for the cold form joist/stud floors and walls work?
M+Sa
Signed and Sealed shop drawings are required for the cold-formed stud walls and joist framing for all instances shown in the structural drawings, as indicated in the general notes on Sheet S-0.0. The cold formed framing shown in the structural plans is delegated design; therefore, the on center spacing is not provided.
BR Rated panels Wu & Associates, Inc.
1. What is the desired product / specifications for the 1/2” thick, Level 1 Ballistic Rated Panels on wall types 4 and 8A?
Is ballistics rating level 1 or level 3 required at wall types 4 and 8a and other locations where ballistics panels are called for?
2. Note P34 on A-101A & A-101B calls for “Brambiers Fabri- Trak (or approved equal) 1” thick sound-absorbent panels” but the specification 098433 does not include this system.
Are the specified panels for AP-01 (Armstrong Sound-Soak) acceptable for the acoustic wall panels in these locations?
3. A-403, Elevation 2, AP-01 is shown covering the walls from the chair rail to the ceiling. Are we to assume the AP-01 panels are also on the sides/returns of the “column bump outs”. See depiction to the right. Please clarify.
4. A-101B, Counters 161. Note P34 appears on the east wall of the area but Elevation 4 on A-403 does not depict AP-01 at this location. Please clarify.
5. A-406, AP-02 appears to be shown in 2 different thicknesses but the specification only calls for 1/2” thick. Are we to price 1/2” thick and 1” thick panels to achieve the desired recessed look? Or are we to achieve this thickness by an alternate method (i.e. furring behind panels.)? Please clarify.
6. A-518, detail 5. Are we to assume the Acoustic Panels at the underside of the catwalk are new and AP-01 type panels, continuous? Please clarify.
7. Finish Schedule calls for “Open” ceiling in Corridor 130B but RCP depicts an acoustic ceiling (area between Lift 141 / Storage 142). Please clarify.
8. What is the desired finish/color of the Hunter Douglas Beam & Baffle ceiling system and supporting grid? The specification says “manuf. standard finish as indicated in finish schedule on drawings” but the baffle ceiling types are not listed on the finish legends. Please clarify.
M+Sa 1. Product: TSS Bullet Resistant Fiberglass. Partition Types 4 and 8a are to receive a level 1 rating unless indicated otherwise.
2. Yes
3. Yes, wall panels should return on column sides.
4. AP-1 should be installed on upper portion of wall as depicted in Elev. 3.
5. 1" thickness can be achieved by ordering 1" thick product or stacking 1/2" thick product.
6.The acoustic panels at the underside of the catwalk are new AP-01.
7. There are two areas labeled 130B. The short east-west corridor outside the lift and janitor closet should have acoustic ceiling while the north-south corridor in the main area should be open.
8. Painted wood look finish - contractor should submit full range for selection.
81 A-602 Wu & Associates, Inc. Sheet A-602 data is very blurry. Please provide underlying spreadsheet or new clear drawing. M+Sa M+Sa to reissue dwg
Proposal Due Date 06/12/2020
Date RFI # Relevant Document Company Question Govt Party Responsible Response
A-602 Wu & Associates, Inc.
On sheet A602 Doors 161 and 161-1 are shown as new aluminum doors not part of the partition system, but on sheets A501 and A502 those doors are shown as part of the demountable partition system. What is required for doors 161 and 161-1?
On sheet A602 door 172-1 is listed as an aluminum door.
This door fronts the main lobby. Are there any ballistics requirements for this door and frame? Note P42 states that this door and frame are salvaged. What is the scope of work here?
On sheet A602 a door 172A is listed but is shown as an aluminum door in a hollow metal frame. Also, door 172A is located at a demountable partition section area, but no door is shown on that partition elevation. What is required for door 172A?
On sheet A602 alum storefront entrance doors 102-1 and 103-1 have sidelights. What type of glazing for is required for these sidelights (thermal + security)?
M+Sa, DoS 1. Doors are part of the demountable glazing partition system.
2. 5/22/20202 DoS Response: Door #172, No ballistics requirements for this door and frame.
3.Door 172A is a sliding door, part of the demountable glazing paritition system. Elevation is missing the door.
4.These doors should have 1" tempered thermal glazing and security film
83 A602, A603 Wu & Associates, Inc. Door Schedule Questions 1 - 12:
1. What does “?” denote on door schedule for doors# 130 and M125 thresholds?
2. Is Medeco T21 Key Cabinet (key management system) by contractor? If so, where will this be located and what electrical panel/circuit will it be fed from?
3. What will operate clamshell pocket doors 102-1 and 103- 1? Manual, ADA push paddle? Motion sensor? Does making these operational require replacing roller wheels or other original hardware? (They are listed as means of egress on A- 004.)
4. Is the Door #146 post-mounted Card Reader and Auto Opening post (A-704/4), trenching, fdn wall coring and conduit(s) work by contractor? Nothing shown on electrical sheets. Is there any door contact, card reader or automatic hinge (ADA) conduit/wiring work by contractor elsewhere in the contract?
5. Do doors #110H and 130, and 164-1 get automatic door openers “A1”? (It appears that the blurred note may refer to an “AI” or “A1 Phone.”). If so, what panel/circuits feed these?
What panels/circuits feed automatic door openers at doors #145 and #146 (nothing indicated on EP104)?
6. For doors #101-5, 101-6, 104-5, 104-6, is "no entry" signage required at these doors per door schedule notes?
Nothing shown on A-820. If required, what size and type?
7. C-1 closer would not work with a sliding door #110-J-1.
What is correct hardware scope for this door?
8. Is door #144B"lever set with medco for" by contractor?
9. What does "RX" indicate for Door #149?
10. What is the answer to the questions posed in the door #190A notes section?
11. Is BR film required for "exterior" doors 101-5 to 8 & 104-5 to 8? Reference A-603 Door notes 15.
12. Is door #164-1 latch or lockset by contractor? If so, what type?
M+Sa, DoS, GSA Field Office
1. Door 130 should have a metal threshold. No threshold required at M125.
2. 05/22/2020 DoS Response: No Medco T21 Cabinet is required.
3. The existing doors are manually operated, but currently fixed in the open position. The extent of required work is not known at this time. If these doors can be made operational, they would only be closed in off hours when they are not needed as a means of egress.
4.05/22/2020 DoS Response: Door #146 card reader will be post-mounted with no Auto Opening. See DME BID set for conduit and electrical requirements.
5. AI PHONE is to be installed by DoS. A1 means auto operator. 05/22/2020 DoS Response: 5. Doors #110 and 130 and 164-1 will have automatic door openers. Door 130 will be connected to AIphone. DoS lock contractor will provide and install the AIphone power supplies. Doors #145 and #146 will have automatic door openers.
6. Note was a tenant reminder that they want a sign on this door. This signage is not in current scope.
7. Door 110J-1 is an existing door. A closer is not required. DoS will address security
8. Yes, door #144B will have lever set with Medoc core. DS will provide and install lever set and core.
9. Delete RX.
10. Provide new door.
11. These are interior doors and do not require BR film. 05/22/2020 DoS Response: All exterior doors require 8 Mil shattered resistant widow film.
12. 05/22/2020 DoS Response: Is door #164-1 latch or lockset by contractor? 06/04/2020 GSA Field Office Response: The loading dock exterior door (164-1) is a GSA-controlled door and should be keyed to the building master.
84 AD101B, A101B, A702 Wu & Associates, Inc.
Neither sheet AD101B nor A101B shows demolition or new work to the stairs, but sheet A702 provides details on handrails for the stairs. Are new handrails to be provided for the interior stairs per sheet A702 or are those details for reference?
M+Sa All handrails in existing stairs to remain. Details shown for reference only.
Scrape, prep and paint.
Proposal Due Date 06/12/2020
Date RFI # Relevant Document Company Question Govt Party Responsible Response
85 A601, A602, A603 Wu & Associates, Inc.
081113 & 081416 Questions:
1. Door type "NE" not utilized within schedule. Is it in scope for restoration and if so, how many?
2. What is cut into, mounted to or glazed into Door Type "NN" (A-601/1) HM entry door #146? Is this door (and removable mullion and fixed leaf door) a painted steel finish?
3. A601/1 door types: "BR" is not listed as a door type within schedules on A602/603. Is this BR designation redundant to 10 22 19 Demountable Glazed Partitions and arch plan notes scope?
4. Is door frame #144B new and stainless with an existing to be salvaged/re-hung bronze door?
M+Sa
1. Door Type NE refers to the existing entry and vestibule doors. Listed as E in the Door Schedule.
2. The cut-outs are vsion panels w/ IG-2 glazing. The door finish is painted steel finish. Dtl to be revised.
3. BR refers to Bullet resistant as noted in the abbreviations.
4. Door 144B is an existing door to remain. GSA / DoS to change the lockset.
86 Mechanical drawings Wu & Associates, Inc.
Can standard details be provided for new ductwork penetrations through existing floors and walls? What are the required sealant and insulation details at non fire-rated walls around the duct penetrations? For example, M105 note 3 is a 22” diameter supply air duct that penetrates through an existing “gallery” wall near column C-13. If security bars are required, what do they anchor to? Is the duct insulation interrupted at the penetration or is insulation packed around security bar anchorage? Is there sealant at this location?
Multiple trades will likely be involved so a clear scope of work is helpful.
M+Sa Waiting for further information from A-E.
87 FX-001 Wu & Associates, Inc. Can existing fire sprinkler drawings be provided? GSA - Field Office 05/27/2020 GSA FO Response: Yes, we have them and can be provided.
Field Office has hard copies at the office. The drawings will need to be PDF for electronic version, but it'll be small.
88 Spec. - 102600 Magnum Inc.
Par 2.3 A Calls for PVC free corner guards. Drawing A-815 legend calls for PVC corner guards . Please clarify or provide basis of design
M+Sa, DoS PVC Free
89 Spec. - 051200 Magnum Inc.
Par-1.8 Please consider waiving AISC…