Tab 10 Amendment 006 Attachment Block H - Air Handlers 2020 05 27.pdf

PDF 9 MB Posted

Attached to
Nix Federal Building & Courthouse Renovation Project
Solicitation number
47PD0120R0027
Issued by

About this file

This package includes plans and specifications for the renovation of approximately 47,000 square feet of historic former Post Office space in the Robert N.C. Nix Federal Building and U.S. Courthouse in Philadelphia. The General Services Administration is renovating the space on the first floor and mezzanine level, which was vacated by the U.S. Postal Service in October 2017. The solicitation seeks proposals for the renovation work in accordance with the attached plans prepared by Mills & Schnoering Architects dated April 10, 2020. Proposals are due by 4:00 PM EST on May 29, 2020. A pre-proposal conference call will be held on May 5, 2020 at 10:00 AM EST. Interested parties should register with the contracting officer representative in advance. The renovation project will take place in the six-story Nix Building located in central Philadelphia, which functions as a courthouse and houses offices and tenants including various federal courts and law enforcement agencies.

View the file

Other files

File Type Posted
Tab 10 Amendment 0010 SF30 2020 06 11.pdf PDF
Tab 10 Amendment 0010 Attachment RFI Log 2020 06 11.pdf PDF
Tab 10 Amendment 009 SF30 2020 06 09.pdf PDF
Tab 10 Amendment 009 Attachment RFI Log 2020 06 08.pdf PDF
Tab 10 Amendment 009 Attachment TY 600 and TY 610.pdf PDF
Tab 10 Amendment 008 RFI Log 2020 06 05x.pdf PDF
Tab 10 Amendment 008 SF30 2020 06 05.pdf PDF
Tab 10 Amendment 008 RFI Log 2020 06 05.pdf PDF
Tab 10 Amendment 008 M and S spec and drwg changes memo 2020 06 03.pdf PDF
Tab 10 Amendment 008 revised sf1442 2020 2020 06 05.pdf PDF
Tab 10 Amendment 007 Questionnaire.pdf PDF
Tab 10 Amendment 007 SF30 2020 05 28.pdf PDF
Tab 10 Amendment 006 SF30 2020 05 27.pdf PDF
Tab 10 Amendment 006 Attachment RFI Log Revised 2020 05 26.pdf PDF
Tab 10 Amendment 006 Attachment RFI Log 62 Vault Constr 2020 05 26.pdf PDF
Tab 10 Amendment 005 SF30 2020 05 20.pdf PDF
Tab 10 Amendment 005 Attachment RFI Log Revised 2020 05 20.pdf PDF
Tab 10 Amendment 004 Attachment RFI 006 - Design Phase Commissioning Report.pdf PDF
Tab 10 Amendment 004 Attachment RFI 016 - Limited Hazmat Survey Report.pdf PDF
Tab 10 Amendment 004 SF30 2020 05 15.pdf PDF
Tab 10 Amendment 004 Attachment RFI 016 - Supplemental Asbestos Survey Report - Floor survey.pdf PDF
Tab 10 Amendment 004 Attachment RFI Log 2020 05 15.pdf PDF
Tab 10 Amendment 003 SF30 2020 05 12.pdf PDF
Tab 10 Amendment 002 info Pre-Bid Conf Attendence 2020 05 05.pdf PDF
Tab 10 Amendment 002 SF30 2020 05 06.pdf PDF
Tab 10 Amendment 002 info Blank ROCAL Sheet.xlsx XLSX spreadsheet
Tab 10 Amendment 002 info Vendor Training Manual.pdf PDF
Tab 10 Amendment 002 info Project Standards and Finishes March 2020 (1).pdf PDF
Tab 10 Amendment 002 info Blank CIW Form.docx DOCX document
Tab 09 Agenda 2020 05 05.pdf PDF
Tab 10 Amendment 0001 Photos Block E - Interior Loading Dock 35.pdf PDF
Tab 10 Amendment 0001 SF30 2020 05 01.pdf PDF
Tab 10 Amendment 0001 Photos Video - Interior Workspace and Warehouse.mp4 MP4 file
Tab 10 Amendment 0001 Photos Block C - Side Office Area 33.pdf PDF
Tab 10 Amendment 0001 Photos Block F - Bulk Mail Area 42.pdf PDF
Tab 10 Amendment 001 RFI Log 2020 05 01.xlsx XLSX spreadsheet
Tab 10 Amendment 0001 Photos Block B - Lobby 35.pdf PDF
Tab 10 Amendment 0001 Photos Block A - External 50.pdf PDF
Tab 10 Amendment 0001 Photos Block D - Inside Transaction Windows 52.pdf PDF
Tab 10 Amendment 0001 Photos Block G - Mezzanine 29.pdf PDF
Tab 10 Amendment 0001 Photos Video - Public Lobby.mp4 MP4 file
Tab 05 Wage Rate at Solicitation 2020 04 17.pdf PDF
Tab 10 Reps and Certs 2020 03 11.pdf PDF
Tab 10 sf1442 w sol 2020 2020 04 17.pdf PDF
Tab 02 Drawings Final CD 2020 04 10.pdf PDF
Tab 10 Solicitation 2020 04 17.pdf PDF
Tab 10 Agreement 2020 04 17.pdf PDF
Tab 02 Specifications Final CD 2020 04 10.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

H

E

C

17 18

J

K

RX 14x10 SA

RX 64x20 SA

RX 76x48 OA

RX

x5 7 R

A

RX 36x12 SA

RX 14x10 RA

RX 26x22 SA

RX 42x18 SA

RX AHU

RX 66x26 RA

RX 38x20 RA

RX 42x18 SA

RX 43x57 RA

RX 14x10 RA

RX RAF-4

RX 26x22 SA

RX 46x26RA

RX 27x20 RA

RX 36x12 RA

RX 30x12 SA

RX 42x20 RA

EX

x3

RX 36x12

RA UP

RX 30x12

SA UP

RX 28x12 SA

H

E

C

16 17 18

AHU-1N

50x24 50x24 SA UP

56x30 RA UP

EX

x3

M301

74x26 SA

76x72 RA 48x18 OA

56x30 RA

76x20x55 RLF

76x72x87 OA

43x57 RLF

SMOKE DETECTOR (TYP)

CLEARANCE

AREA (TYP)

0 4' 8' 1/4"=1'-0"

True North

Plan North

CHECKED BY

DRAWN BY

FLOOR NUMBER

DRAWING TITLE

SHEET

NUMBER

SUBMISSION DATE

SUBMISSION STAGE

GSA PM

GSA PROJECT NO.

PROJECT

DESCRIPTION

PROJECT TITLE

BUILDING NUMBER

CITY/ST./ZIP

ADDRESS

BUILDING NAME

PRIME CONTR. NO.

PRIME ORDER NO.

CONST. CONTR.

A/E

SUB A/E

CONST. CONTR. NO.

SHEET SIZE:

DATE DRAWN:

30 X 42

SH

EE

T I

DE

NT

IFI

CA

TIO

N

DISCIPLINE

PR

OJ

EC

T I

DE

NT

IFI

CA

TIO

N

BU

ILD

IN

G

BIM FILE NAME

CO

NT

RA

CT

OR

S

RE

VI

SI

ON

B

LO

CK

GR

AP

HI

C

SC

AL

E

KE

Y

PL

AN

ST

AM

P

OR

S

EA

L

DE

SI

GN

ER

ID

EN

TIF

IC

AT

IO

N

OW

NE

R

ID

EN

TIF

IC

AT

IO

N

SHEET OF SHEETS

4/ 7/

1:

:2

AM

M405

BASEMENT - SIDE B - MECH ROOM ENLARGED PLANS -

DUCTWORK

NIX BUILDING POST OFFICE RE-DESIGN

FINAL CD

04/10/2020

05/07/19HHM

BMB

900 MARKET STREET

PHILADELPHIA, PA 19107

GS-03-P-16-DX-X-7012

PA014322

RWA - N1813322

MILLS + SCHNOERING ARCHITECTS, LLC

ROBERT N.C. NIX SR. FEDERAL BUILDING AND U.S. COURTHOUSE

HENRY ADAMS, LLC

1/4" = 1'-0"M405

BASEMENT - SIDE B MECH ROOM - DUCTWORK DEMOLITION2

SE

NS

ITI

VE

B

UT

U

NC

LA

SS

IFI

ED

(S

BU

) P

RO

PE

RT

Y

OF

TH

E

UN

ITE

D

ST

AT

ES

G

OV

ER

NM

EN

T F

OR

O

FF

IC

E

US

E

ON

LY

. D o n ot re mo ve th is no tic e.

P ro pe rly d es tro y o r r et ur n do cu me nt s w he n n o lon ge r n ee de d.

1/4" = 1'-0"M405

BASEMENT - SIDE B MECH ROOM - DUCTWORK1

DRAWING NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

INFORMATION SHOWN ON THIS DRAWING PERTAINING TO EXISTING

CONDITIONS HAS BEEN OBTAINED FROM AVAILABLE BUILDING

DRAWINGS OR GENERAL FIELD OBSERVATIONS AND MAY NOT

INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL OR DIMENSION.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE

ACTUAL EXISTING CONDITIONS PRIOR TO FABRICATION OR

PERFORMANCE OF ANY WORK. SHOULD CONDITIONS BE DISCOVERED

THAT PREVENT EXECUTION OF THE WORK AS INDICATED, THE

CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER IN WRITING

AND AWAIT WRITTEN DIRECTION BEFORE PROCEEDING WITH THE

WORK.

2.

UNLESS OTHERWISE NOTED, MECHANICAL ITEMS SHOWN HEAVY

SOLID ( ) ARE NEW, MECHANICAL ITEMS SHOWN LIGHT SOLID

( ) ARE EXISTING TO REMAIN, AND MECHANICAL ITEMS SHOWN

HEAVY DASHED ( ) SHALL BE REMOVED.

1.

SPECIAL NOTES:

1 PLENUM WITH SIZES INDICATED.

UNIT MUST BE ASSEMBLED IN SECTIONS WITHIN MECHANICAL ROOM.

SECTIONS MUST BE BROUGHT IN THROUGH EXISTING FREIGHT

ELEVATOR. APPROXIMATE FREIGH ELEVATOR OPENING DIMENSIONS

ARE 116" WIDE x 80" HIGH x 125" DEEP.

AHU FAN VFD OR ECM CONTROLLER. COORDINATE WITH AHU FANS

PROVIDED.

KEY PLAN

NTS

Mark Date Description

BenjaminJHastings Typewriter

1 - AHU 1N

2 - AHU 1N

3 - AHU 1N

4 - AHU 1N

5 - AHU 1N (Return Fan)

6 - AHU 1N (Return Fan)

7 - Lift Overshoot (Basement)

8 - Lift Overshoot (Basement)

9 - Basement Access Hatch

L

K

6 7 8

RX 52x52 RA

RX 24x30, 56x30 & 40x30 SA

RX RAF

RX AHU-1CN

TYP

EX 52x52

RLF UP

RX 40x40 OA EX 40x40

OA UP

RX 52x52 RA

RX 52x52 RA

L

K

5 6 7 8

28x20 EA UP

AHU-1CN

EX 40x40 OA UP x2

RA

x3

RA

56x30 OA TO 38"x72"x72" FIELD

FABRICATED PLENUM BELOW

EX 52x52

RLF UP

x2

SA

72x22 SA

36x50 OA

36x50 OA 56x30 OA

56x30 RA TO 38"x56"x72" FIELD

FABRICATED PLENUM BELOW

56x20

M301

40x40 OA

SMOKE DETECTOR (TYP)

CLEARANCE

AREA (TYP)

0 4' 8' 1/4"=1'-0"

True North

Plan North

CHECKED BY

DRAWN BY

FLOOR NUMBER

DRAWING TITLE

SHEET

NUMBER

SUBMISSION DATE

SUBMISSION STAGE

GSA PM

GSA PROJECT NO.

PROJECT

DESCRIPTION

PROJECT TITLE

BUILDING NUMBER

CITY/ST./ZIP

ADDRESS

BUILDING NAME

PRIME CONTR. NO.

PRIME ORDER NO.

CONST. CONTR.

A/E

SUB A/E

CONST. CONTR. NO.

SHEET SIZE:

DATE DRAWN:

30 X 42

SH

EE

T I

DE

NT

IFI

CA

TIO

N

DISCIPLINE

PR

OJ

EC

T I

DE

NT

IFI

CA

TIO

N

BU

ILD

IN

G

BIM FILE NAME

CO

NT

RA

CT

OR

S

RE

VI

SI

ON

B

LO

CK

GR

AP

HI

C

SC

AL

E

KE

Y

PL

AN

ST

AM

P

OR

S

EA

L

DE

SI

GN

ER

ID

EN

TIF

IC

AT

IO

N

OW

NE

R

ID

EN

TIF

IC

AT

IO

N

SHEET OF SHEETS

4/ 7/

1:

:0

AM

M402

MEZZANINE - ENLARGED PLAN - MECH ROOM -

DUCTWORK

NIX BUILDING POST OFFICE RE-DESIGN

FINAL CD

04/10/2020

05/08/19HHM

BMB

900 MARKET STREET

PHILADELPHIA, PA 19107

GS-03-P-16-DX-X-7012

PA014322

RWA - N1813322

MILLS + SCHNOERING ARCHITECTS, LLC

ROBERT N.C. NIX SR. FEDERAL BUILDING AND U.S. COURTHOUSE

HENRY ADAMS, LLC

SE

NS

ITI

VE

B

UT

U

NC

LA

SS

IFI

ED

(S

BU

) P

RO

PE

RT

Y

OF

TH

E

UN

ITE

D

ST

AT

ES

G

OV

ER

NM

EN

T F

OR

O

FF

IC

E

US

E

ON

LY

. D o n ot re mo ve th is no tic e.

P ro pe rly d es tro y o r r et ur n do cu me nt s w he n n o lon ge r n ee de d.

1/4" = 1'-0"M402

MEZZANINE - MECH ROOM - DUCTWORK - DEMOLITION1

1/4" = 1'-0"M402

MEZZANINE - MECH ROOM - DUCTWORK - NEW WORK2

DRAWING NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

INFORMATION SHOWN ON THIS DRAWING PERTAINING TO EXISTING

CONDITIONS HAS BEEN OBTAINED FROM AVAILABLE BUILDING

DRAWINGS OR GENERAL FIELD OBSERVATIONS AND MAY NOT

INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL OR DIMENSION.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE

ACTUAL EXISTING CONDITIONS PRIOR TO FABRICATION OR

PERFORMANCE OF ANY WORK. SHOULD CONDITIONS BE DISCOVERED

THAT PREVENT EXECUTION OF THE WORK AS INDICATED, THE

CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER IN WRITING

AND AWAIT WRITTEN DIRECTION BEFORE PROCEEDING WITH THE

WORK.

2.

UNLESS OTHERWISE NOTED, MECHANICAL ITEMS SHOWN HEAVY

SOLID ( ) ARE NEW, MECHANICAL ITEMS SHOWN LIGHT SOLID

( ) ARE EXISTING TO REMAIN, AND MECHANICAL ITEMS SHOWN

HEAVY DASHED ( ) SHALL BE REMOVED.

1.

SPECIAL NOTES:

1 AHU FAN VFD OR ECM CONTROLLER. COORDINATE WITH AHU FANS

PROVIDED.

KEY PLAN

10 - Mezz Mech Rm Stair

11 - AHU 1CN

12 - AHU 1CN

13 - AHU 1CN

14 - AHU 1CN

15 - AHU 1CN

E E

C C

M301 x1

OA

50x24 SA 50x24 SA UP

44x30 RA UP

AHU-1-SE

58x26

74x72 RA

74x26x86 SA

74x72x32

74x20x521

RLF

SMOKE DETECTOR (TYP)

CLEARANCE

AREA (TYP)

E E

C C

RX 76x18 SA

RX 34x20 SA

RX 51x18 RA

RX

x2

OA

RX 58x25 RA

RX AHU

RX

x2 4 R

A

RX RAF-3

RX

x1

RX

x1

EX 34x18

RX 34x20

SA UP

0 4' 8' 1/4"=1'-0"

True North

Plan North

CHECKED BY

DRAWN BY

FLOOR NUMBER

DRAWING TITLE

SHEET

NUMBER

SUBMISSION DATE

SUBMISSION STAGE

GSA PM

GSA PROJECT NO.

PROJECT

DESCRIPTION

PROJECT TITLE

BUILDING NUMBER

CITY/ST./ZIP

ADDRESS

BUILDING NAME

PRIME CONTR. NO.

PRIME ORDER NO.

CONST. CONTR.

A/E

SUB A/E

CONST. CONTR. NO.

SHEET SIZE:

DATE DRAWN:

30 X 42

SH

EE

T I

DE

NT

IFI

CA

TIO

N

DISCIPLINE

PR

OJ

EC

T I

DE

NT

IFI

CA

TIO

N

BU

ILD

IN

G

BIM FILE NAME

CO

NT

RA

CT

OR

S

RE

VI

SI

ON

B

LO

CK

GR

AP

HI

C

SC

AL

E

KE

Y

PL

AN

ST

AM

P

OR

S

EA

L

DE

SI

GN

ER

ID

EN

TIF

IC

AT

IO

N

OW

NE

R

ID

EN

TIF

IC

AT

IO

N

SHEET OF SHEETS

4/ 7/

1:

:1

AM

M403

BASEMENT - SIDE A - MECH ROOM ENLARGED PLANS -

DUCTWORK

NIX BUILDING POST OFFICE RE-DESIGN

FINAL CD

04/10/2020

05/08/19HHM

BMB

900 MARKET STREET

PHILADELPHIA, PA 19107

GS-03-P-16-DX-X-7012

PA014322

RWA - N1813322

MILLS + SCHNOERING ARCHITECTS, LLC

ROBERT N.C. NIX SR. FEDERAL BUILDING AND U.S. COURTHOUSE

HENRY ADAMS, LLC

SE

NS

ITI

VE

B

UT

U

NC

LA

SS

IFI

ED

(S

BU

) P

RO

PE

RT

Y

OF

TH

E

UN

ITE

D

ST

AT

ES

G

OV

ER

NM

EN

T F

OR

O

FF

IC

E

US

E

ON

LY

. D o n ot re mo ve th is no tic e.

P ro pe rly d es tro y o r r et ur n do cu me nt s w he n n o lon ge r n ee de d.

1/4" = 1'-0"M403

BASEMENT - SIDE A MECH ROOM - DUCTWORK1

1/4" = 1'-0"M403

BASEMENT - SIDE A MECH ROOM - DUCTWORK DEMOLITION2

DRAWING NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

INFORMATION SHOWN ON THIS DRAWING PERTAINING TO EXISTING

CONDITIONS HAS BEEN OBTAINED FROM AVAILABLE BUILDING

DRAWINGS OR GENERAL FIELD OBSERVATIONS AND MAY NOT

INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL OR DIMENSION.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE

ACTUAL EXISTING CONDITIONS PRIOR TO FABRICATION OR

PERFORMANCE OF ANY WORK. SHOULD CONDITIONS BE DISCOVERED

THAT PREVENT EXECUTION OF THE WORK AS INDICATED, THE

CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER IN WRITING

AND AWAIT WRITTEN DIRECTION BEFORE PROCEEDING WITH THE

WORK.

2.

UNLESS OTHERWISE NOTED, MECHANICAL ITEMS SHOWN HEAVY

SOLID ( ) ARE NEW AND MECHANICAL ITEMS SHOWN LIGHT SOLID

( ) ARE EXISTING TO REMAIN.

1.

SPECIAL NOTES:

1 PLENUM WITH SIZES INDICATED.

UNIT MUST BE ASSEMBLED IN SECTIONS WITHIN MECHANICAL ROOM.

SECTIONS MUST BE BROUGHT IN THROUGH EXISTING FREIGHT

ELEVATOR. APPROXIMATE FREIGH ELEVATOR OPENING DIMENSIONS

ARE 116" WIDE x 80" HIGH x 125" DEEP.

AHU FAN VFD OR ECM CONTROLLER. COORDINATE WITH AHU FANS

PROVIDED.

KEY PLAN

16 - AHU 1-SE

17 - AHU 1-SE

20200520_094715
20200520_094726
20200520_094729
20200520_094745
20200520_094808
20200520_094811
20200520_094900
20200520_094909
20200520_094931
20200520_095402
20200520_095436
20200520_095442
20200520_095448
20200520_095529
20200520_095550
20200520_105117
20200520_105147
20200520_105237

File details come from the government source that posted it. Updated .