Tab 10 Amendment 008 M and S spec and drwg changes memo 2020 06 03.pdf

PDF 120 KB Posted

Attached to
Nix Federal Building & Courthouse Renovation Project
Solicitation number
47PD0120R0027
Issued by

About this file

This addendum to the plans and specifications provides revisions to the Nix Federal Building and Courthouse Renovation Project solicitation. The General Services Administration is renovating approximately 47,000 square feet of former Post Office space on the first floor and mezzanine level of the Robert N.C. Nix Federal Building in Philadelphia. Revisions include adding a janitor's closet, adjusting restroom layouts, adding bullet resistant protection to counters, and modifying doors and hardware. Mechanical, electrical, fire alarm, and plumbing drawings and schedules are also revised. The pre-proposal conference call is scheduled for May 5, 2020 and proposals are due by May 29, 2020. The project involves renovating historic federal office and courthouse space to accommodate continued operations.

View the file

Other files

File Type Posted
Tab 10 Amendment 0010 SF30 2020 06 11.pdf PDF
Tab 10 Amendment 0010 Attachment RFI Log 2020 06 11.pdf PDF
Tab 10 Amendment 009 SF30 2020 06 09.pdf PDF
Tab 10 Amendment 009 Attachment RFI Log 2020 06 08.pdf PDF
Tab 10 Amendment 009 Attachment TY 600 and TY 610.pdf PDF
Tab 10 Amendment 008 RFI Log 2020 06 05x.pdf PDF
Tab 10 Amendment 008 SF30 2020 06 05.pdf PDF
Tab 10 Amendment 008 RFI Log 2020 06 05.pdf PDF
Tab 10 Amendment 008 revised sf1442 2020 2020 06 05.pdf PDF
Tab 10 Amendment 007 Questionnaire.pdf PDF
Tab 10 Amendment 007 SF30 2020 05 28.pdf PDF
Tab 10 Amendment 006 SF30 2020 05 27.pdf PDF
Tab 10 Amendment 006 Attachment RFI Log Revised 2020 05 26.pdf PDF
Tab 10 Amendment 006 Attachment Block H - Air Handlers 2020 05 27.pdf PDF
Tab 10 Amendment 006 Attachment RFI Log 62 Vault Constr 2020 05 26.pdf PDF
Tab 10 Amendment 005 SF30 2020 05 20.pdf PDF
Tab 10 Amendment 005 Attachment RFI Log Revised 2020 05 20.pdf PDF
Tab 10 Amendment 004 Attachment RFI 006 - Design Phase Commissioning Report.pdf PDF
Tab 10 Amendment 004 Attachment RFI 016 - Limited Hazmat Survey Report.pdf PDF
Tab 10 Amendment 004 SF30 2020 05 15.pdf PDF
Tab 10 Amendment 004 Attachment RFI 016 - Supplemental Asbestos Survey Report - Floor survey.pdf PDF
Tab 10 Amendment 004 Attachment RFI Log 2020 05 15.pdf PDF
Tab 10 Amendment 003 SF30 2020 05 12.pdf PDF
Tab 10 Amendment 002 info Pre-Bid Conf Attendence 2020 05 05.pdf PDF
Tab 10 Amendment 002 SF30 2020 05 06.pdf PDF
Tab 10 Amendment 002 info Blank ROCAL Sheet.xlsx XLSX spreadsheet
Tab 10 Amendment 002 info Vendor Training Manual.pdf PDF
Tab 10 Amendment 002 info Project Standards and Finishes March 2020 (1).pdf PDF
Tab 10 Amendment 002 info Blank CIW Form.docx DOCX document
Tab 09 Agenda 2020 05 05.pdf PDF
Tab 10 Amendment 0001 Photos Block E - Interior Loading Dock 35.pdf PDF
Tab 10 Amendment 0001 SF30 2020 05 01.pdf PDF
Tab 10 Amendment 0001 Photos Video - Interior Workspace and Warehouse.mp4 MP4 file
Tab 10 Amendment 0001 Photos Block C - Side Office Area 33.pdf PDF
Tab 10 Amendment 0001 Photos Block F - Bulk Mail Area 42.pdf PDF
Tab 10 Amendment 001 RFI Log 2020 05 01.xlsx XLSX spreadsheet
Tab 10 Amendment 0001 Photos Block B - Lobby 35.pdf PDF
Tab 10 Amendment 0001 Photos Block A - External 50.pdf PDF
Tab 10 Amendment 0001 Photos Block D - Inside Transaction Windows 52.pdf PDF
Tab 10 Amendment 0001 Photos Block G - Mezzanine 29.pdf PDF
Tab 10 Amendment 0001 Photos Video - Public Lobby.mp4 MP4 file
Tab 05 Wage Rate at Solicitation 2020 04 17.pdf PDF
Tab 10 Reps and Certs 2020 03 11.pdf PDF
Tab 10 sf1442 w sol 2020 2020 04 17.pdf PDF
Tab 02 Drawings Final CD 2020 04 10.pdf PDF
Tab 10 Solicitation 2020 04 17.pdf PDF
Tab 10 Agreement 2020 04 17.pdf PDF
Tab 02 Specifications Final CD 2020 04 10.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M+Sa #1609.26 Addendum

200 Forrestal Road, Suite 3A Princeton, NJ 08540 T: 609.681.2480

M+Sa ADDENDUM NO. 1 GSA Addendum XXX

Project: Nix Federal Building Post Office Renovation

M+Sa Project No. 1609.26

GSA

Issue Date: June 3, 2020

GENERAL

The following summarizes the contents of this addendum and incorporates selected previously issued responses to RFIs and other changes to the Bid documents. Not all RFIs have required changes to the documents.

SPECIFICATIONS

New Section

Ref Title Description

NA Light Fixture Cut Sheets For clarification

Revised Section

Ref Title Description of change

Section 012700 Unit Prices Added wood flooring

Section 224000 Paragraph 2.1.F

Plumbing Fixtures and Equipment

Changed water closet wall carriers to Zurn 1200

Series, narrow wall type for double carriers.

Section 263353 Paragraph 2.1.C , 2.1.D, and 2.2.B.

Static Uninterruptible Power Supply

Identified the 4-post rack to be open type.

Clarified that UPS and service bypass panel

MUST be APC model # listed, with no substitutions allowed.

DRAWINGS

New Drawings

None

Revised Drawings

A104 Mezzanine RCP Added Janitor Closet , adjusted Men’s and Women’s Rooms

A409 Toilet Rooms Plans / Interior Elevations

Added Janitor Closet , adjusted Men’s and Women’s Rooms

A506 Adjudication Counter Details Added bullet resistant protection

A602 Door Schedule Modified door and hardware per the RFIs

A603 Door Schedule Modified door and hardware per the RFIs.

Added new JC door.

A602 Door Schedule Clarified blurry text Modified doors and hardware per RFI responses

A603 Door Schedule Clarified blurry text Added new JC door M112A Modified doors and hardware per RFI responses

A604 Door Details Modified details for infill panel at loading dock sidelights.

A705 Ramp Details Elevations Added vertical joints to the elevations in response to RFI #199

E402 Electrical Part Plans Deleted electrical connections for security systems power supplies in DS Hub 177 and DS 142A. Deleted three duplex receptacles and circuits in DS Hub 177. Revised locations of receptacles in DS Hub 177.

E601 Power One-Line Diagrams-Demo Added information to existing substations.

E602 Power One-Line Diagrams- New Added information to existing substations.

E702 Relay Panel Schedules Revised relay types in Relay Panel RP1M Schedule. Added switch button details.

E801 Luminaire Schedule Revised Luminaire Type B6 from 4-feet to lengths as indicated on drawings

E805 Electrical Panel Schedules Added information to existing substations.

E812 Electrical Panel Schedules Revised two 1P-20A circuit breakers from spares to toilet room automatic faucets in Panel L1N2 schedule, and added handle padlock auxiliaries.

Revised circuit #74 description from “Receptacle” to “REC: M125 COMPUTER TABLE” in Panel L1N2 Schedule.

E813 Electrical Panel Schedules Revised 1P-20A circuit breaker from spare to toilet room automatic faucets in Panel L1S schedule, and added handle padlock auxiliary.

Revised 1P-20A circuit breakers from spare to hand dryers in Panel L1S, and added handle padlock auxiliary.

E814 Electrical Panel Schedules Revised several circuits to spares and revised several circuit descriptions in Panel DS1 and Panel DS2 schedules.

EL101 First Floor Lighting Plan – Side A Added references to switch button details.

EL102 First Floor Lighting Plan – Side A Revised switch zones of low voltage switch in Customer Service 172. Revised switch zones of low voltage switch in Corr 170B. Revised switch zones of low voltage switch in Training Room 144 northeast nook. Added references to switch button details.

EL104 Mezzanine Lighting Plan – Side B Deleted A20 luminaire, revised length of A15 luminaire, revised locations of luminaires in MEN M112. Added luminaire and switch in Jan M112A. Revised location of A15 luminaire in Women M111. Revised switch zones of three low voltage switches in Break Room M102.

Added references to switch button details.

EP103 First Floor Plan Side A Power Added electrical connections for automatic faucets in Toilet Rooms 183, 184, 187A, 187B, 187D, and 187E. Added electrical connections for hand dryers in 187A, 187B, 187D, and 187E.

EP104 First Floor Plan Side B Power Added electrical connections for automatic faucets in Bathroom 166, Women 167A, and 167C.

EP106 Mezz Plan Side B Power Added electrical connections for automatic faucets in Women M111 and Men 112. Added receptacle in JC M112A. Revised location of refrigerator receptacle in Lactation Room M101.

M001 Mechanical Cover Sheet Removed mechanical general note 19.

M101 Basement Ductwork Indicated locations for security bars in duct risers.

M102 Level 1 Lower Plan Side A Mechanical

Indicated locations for security bars. Labeled ACU-3 in network room and added Note 9.

M103 Level 1 Lower Plan Side B Mechanical

Coordinated diffuser layout in Training Room 144.

M104 Level 1 Mezz Plan Side A Ductwork Indicated locations for security bars.

M105 Level 1 Mezz Plan Side B Ductwork Shifted ductwork in mezzanine for coordination of diffusers in Training Room 144.

Indicated locations for security bars.

M403 Bsmt Side A Mech Room Enlarged Plans Ductwork

Indicated locations for security bars.

M405 Bsmt Side B Mech Room Enlarged Plans Ductwork

Indicated locations for security bars.

M502 Mechanical Details Added inspection port to security bar detail.

MD105 Level 1 Mezzanine Plan Side A Mechanical Demo

Moved the air device to be demoed near column C-8 into the existing toilet room and changed the drawing note from 1 to 2.

MD106 Level 1 Mezzanine Plan Side B Mechanical Demo

Changed drawing Note 13 to Not Used.

P401 Plumbing- Enlarged Plans Removed toilet from Mezzanine bathroom and replaced with mop sink.

P601 Plumbing Riser Diagrams Revised riser diagram to reflect changes on P- 401.

FA102 Fire Alarm Mezz Plan Side B Added smoke detection in Corridor M120

QUESTIONS FROM BIDDERS

See separate responses to all RFIs. All responses to the RFIs not specifically indicated on the revised drawings or specifications are still valid.

END OF ADDENDUM