This document includes a past performance questionnaire and details of a federal contract opportunity for renovations to the Nix Federal Building and Courthouse in Philadelphia. GSA seeks to select a contractor to renovate approximately 47,000 square feet of historic former Post Office space on the first floor and mezzanine level of the building. The renovations will be guided by plans and specifications prepared by the architecture and engineering firm Mills & Schnoering dated April 10, 2020. Interested offerors must register by May 5th for a pre-proposal conference call and submit proposals by May 29, 2020 at 4pm Eastern. The renovation work will take place in the six-story Nix Building located in downtown Philadelphia, which houses courtrooms, offices, and other federal tenants and is listed on the National Register of Historic Places.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION SEE FAR 3.104
OFFEROR BEING EVALUATED: _______________________________________
PROJECT BEING EVALUATED: _______________________________________
NAME OF EVALUATOR: _______________________________________
EVALUATOR’S AGENCY/COMPANY: _______________________________________
EVALUATOR’S ROLE IN PROJECT: _______________________________________
EVALUATOR’S EMAIL ADDRESS: _______________________________________
EVALUATOR’S TELEPHONE NUMBER: ______________________________________
We request receipt of your completed questionnaire by ________________.
completed questionnaire should be emailed to Steven Sutkin at steven.sutkin@gsa.gov reviewed by the offeror in question or any other party not having a need to know. Electronic copies of the Completed questionnaires will be considered procurement sensitive information and will not be seen or most qualified firm to perform this project.
listed below. Your completion of the attached questionnaire would be of great benefit in selecting the one of the offerors as someone who could attest to the quality that offeror’s performance on the project construction of the Nix Building Renovation Project in Philadelphia, PA. You have been identified by the The General Services Administration is evaluating past performance in selecting a contractor for the
NIX BUILDING RE-DESIGN PROJECT
PAST PERFORMANCE QUESTIONNAIRE – PRIME CONTRACTOR
APPENDIX E.1
of 4
APPENDIX
E.1 Page 2 of 3
PAST PERFORMANCE QUESTIONNAIRE – PRIME CONTRACTOR
NIX BUILDING RENOVATON PROJECT
SECTION 1 – NUMERICAL RATINGS
Please indicate your level of satisfaction with the contractor’s performance on the project in question by placing an “X” in the appropriate block using the rating scale provided to the right of each question. This scale is defined as follows:
RATING PERFORMANCE LEVEL
5 EXCELLENT – The contractor’s performance met all contractual requirements and exceeded many to the Government’s or customer’s benefit. The few corrective actions that may have been necessary were provided expeditiously and were highly effective.
4 GOOD - The contractor’s performance met contractual requirements and exceeded some to the Government’s benefit. Performance was provided with some minor problems, but corrective action was prompt and effective.
3 ACCEPTABLE – The contractor’s performance met contractual requirements. There were minor problems but the corrective actions taken were generally satisfactory.
2 MARGINAL – The contractor’s performance did not meet some contractual requirements.
There were significant problems with the contractor’s performance and the corrective action provided was only marginally effective or was not fully implemented.
1 UNACCEPTABLE – The contractor’s performance did not meet most contractual requirements and corrective action was untimely, ineffective or both.
N NOT APPLICABLE – Unable to provide a rating
MANAGEMENT 5 4 3 2 1 N
Exhibits professional conduct Cooperation/responsiveness is timely, provides/solicits feedback, suggests alternatives
Offeror is easy to work with, friendly, courteous Provides effective oversight of project managers/superintendents Quickly and professionally resolves issues/disputes Reviews and addresses subcontractor issues Provides a clear and effective line of supervision on the worksite Follows and maintains the established project budget Follows the negotiated subcontracting plan
CONSTRUCTION 5 4 3 2 1 N
Complies with laws and regulations Coordinates and controls subcontractors, adheres to work schedule Maintains good construction pace and work environment Site management – materials are properly stored and staged, job-site is clean Adheres to an adequate initial project schedule, schedule revisions are timely submitted
Resolves delays in a timely manner
Completes punch list items in a timely manner Uses specified materials Identifies and corrects deficient work timely and effectively Implements and follows a satisfactory safety plan Provides high quality workmanship QC testing is adequate and fully implemented
PAST PERFORMANCE QUESTIONNAIRE – PRIME CONTRACTOR
NIX BUILDING RENOVATION PROJECT
CLOSE-OUT/WARRANTY 5 4 3 2 1 N
Requirement documents are fully submitted Documents are submitted in a timely manger As-built drawings – redline drawings are accurately maintained on site per specs Close-out documents follow the required format Responses to warranty issues are timely and effective Noted deficiencies are adequately corrected
OVERALL PERFORMANCE 5 4 3 2 1 N
Overall performance – Likelihood of contracting with this firm on future projects
SECTION 2 – NARRATIVE COMMENTS
Please provide in the spaces below any additional comments you have regarding the offeror’s performance on the project in question:
1. Strengths of Performance:
2. Weaknesses of Performance:
3. Describe the contractor’s level of attention to safety and describe any incidents that occurred on the project:
4. Additional Comments: