44-SBE Goal Participation SBE-1 Form Tutorial (SBE Division v3).mp4
MP4 file 37 MB Posted
- Solicitation number
- IFB-26-00287
- Issued by
- Hillsborough County, Florida
About this file
This is a tutorial file in video format created by the SBE Division for the Hillsborough County Engineering and Operations Department regarding Small Business Enterprise (SBE) goal participation procedures on the CR 584 (Waters Ave) at Florida Mining Boulevard Intersection Improvements project. The project involves the installation of a new traffic signal system with two mast arm structures positioned in the northwest and southeast quadrants of the intersection, along with interconnect infrastructure along the CR 584 corridor. The solicitation is issued through Bonfire and requires interested parties to submit questions and requests for interpretation no later than 14 calendar days after the solicitation issuance date, site visit, or pre-bid conference, whichever occurs last, as specified in Paragraph 4.7 of the Contract Terms and Conditions Document.
The project has an estimated value of $2,582,238.00 and includes a Small Business Enterprise participation goal of 7% for subcontractor involvement. This tutorial file serves as an instructional resource to educate potential bidders and subcontractors on how to properly document and achieve SBE goal participation requirements in connection with this contract solicitation and the resulting award.
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .