23-Attachment C - URS - NC - Spectrum No Conflict.pdf

PDF 2 MB Posted

Attached to
CR 584 (Waters Ave) at Florida Mining Blvd. Intersection Improvements
Solicitation number
IFB-26-00287
Issued by
Hillsborough County, Florida

About this file

This is a Utility Relocation Statement (URS) and "No Conflict" certification document submitted by a contractor for the CR 584 (Waters Ave) at Florida Mining Boulevard Intersection Improvements project in Hillsborough County, Florida. The document confirms that the contractor has reviewed utility conflicts and relocation requirements for the project scope, which includes traffic signal installation with two mast arm structures, intersection improvements, roadway widening and resurfacing, sidewalk reconstruction, drainage improvements, and median closure. The project work extends 0.230 miles along CR 584 and requires coordination with multiple utility providers including Tampa Electric (13.2 KV overhead lines), Frontier Communications, FiberLight, UNITI Fiber, Crown Castle, MCI, CenturyLink, TECO Peoples Gas, and City of Tampa Water Department. The URS document serves as the contractor's acknowledgment and certification that they understand the utility infrastructure present within the project area and commit to coordinating all necessary relocations. Bids for this project are due August 5, 2026 by 2:00 p.m. Eastern Time via the County's Euna Procurement system, with Substantial Completion required within 226 days of Notice to Proceed.

The estimated contract value is $2,582,238.00, with a $250,000 allowance for permits and Allowance Authorization to be added to the bid amount. Contractors must be prequalified with FDOT in major classes including Milling, Flexible Paving, Hot Plant-Mixed Bituminous Courses, and specialty classes including Traffic Signals, Concrete, Drainage, Roadway Signing & Pavement Marking, Underground Utilities, and Intelligent Transportation Systems. A 7% Small Business Enterprise subcontractor participation goal applies. An Earnest Money Deposit equal to 5% of the bid amount is required, and the successful bidder must provide Performance and Payment Bonds each equal to 100% of the total awarded contract amount. Contract Time specifies Substantial Completion within 226 days with liquidated damages of $1,418.00 per day and Final Completion within 316 days with liquidated damages of $709.00 per day. A 5% retainage will be withheld from all progress payments. Comprehensive insurance coverage is mandated, including General Liability ($500,000 to $1,000,000 per occurrence), Automobile Liability ($300,000 to $1,000,000 combined single limit), Workers' Compensation, Professional Liability ($1,000,000), Cyber Liability ($1,000,000), and Pollution Liability ($1,000,000), with all insurers maintaining A.M. Best ratings of A- Class 7 or better.

View the file

Other files

File Type Posted
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
14-Subcontractor Letter of Intent .pdf PDF
45-IFB-26-00287 Contract Terms and Conditions.pdf PDF
27-Attachment C - URS - TECO Peoples Gas-Signed.pdf PDF
19-Attachment C - URS - CrownCastle-Signed.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
38-IFB-26-00287 Plans - Waters-FL Mining SS UTV1.pdf PDF
41-IFB-26-00287 Supplemental Specifications.pdf PDF
4-Application for Payment.pdf.pdf PDF
24-Attachment C - URS - NC - Summit No Conflict Letter.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
16-Attachment B - GEO - Rpt Rev1 SS.pdf PDF
35-Payment Bond.pdf PDF
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
36-IFB-26-00287 Plans - ROADWAY.pdf PDF
15-Attachment A - Construction Sign 2026.pdf PDF
8-Insurance Certificate.doc.doc DOC document
26-Attachment C - URS - TCA- URS-Signed.pdf PDF
34-Performance Bond.pdf PDF
25-Attachment C - URS - Tampa Electric Signed.pdf PDF
42-Agreement - Construction - Stand Alone.pdf PDF
37-IFB-26-00287 Plans - SIGNALIZATION.pdf PDF
3-Allowance Authorization Release Form.pdf.pdf PDF
21-Attachment C - URS - FTR Signed.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
33-Bid Bond.doc DOC document
20-Attachment C - URS - FIBERLIGHT -Signed.pdf PDF
28-Attachment C - URS - UNITI FIBER Signed.pdf PDF
17-Attachment C - URS - CenturyLink Signed.pdf PDF
9-Substitute W9 Form.pdf.pdf PDF
22-Attachment C - URS - MCI-Signed.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
43-IFB-26-00287 Insurance Requirements.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
39-IFB-26-00287 Plans - Waters-FL Mining SS UTV2.pdf PDF
31-Attachment D - Permits - Waters Ave. at Florida Mining Blvd.exemption.pdf PDF
30-Attachment D - Permits - SWFWMD Permit Withdrawn.pdf PDF
32-Attachment E - Drainage-Memo.pdf PDF
18-Attachment C - URS - COTW Signed.pdf PDF
44-SBE Goal Participation SBE-1 Form Tutorial (SBE Division v3).mp4 MP4 file
7-Change Order Form.pdf.pdf PDF
40-IFB-26-00287 Project Map.pdf PDF
11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
29-Attachment C - URS - Utility Certification Letter 10.8.25.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .