38-IFB-26-00287 Plans - Waters-FL Mining SS UTV1.pdf
PDF 706 KB Posted
- Solicitation number
- IFB-26-00287
- Issued by
- Hillsborough County, Florida
About this file
This file is a Subsurface Utility Survey Report prepared by George F. Young Inc., a Florida-licensed surveying firm under Professional Surveyor and Mapper Michael J. Curley (Certificate of Authorization Number LB21), for the Hillsborough County Capital Programs Department in support of the CR 584 (Waters Avenue) at Florida Mining Boulevard intersection improvements project in Tampa, Florida. The survey was conducted to locate and record subsurface utilities at the project intersection, with test holes performed between July 30 and September 3, 2019. The report documents 23 utility test holes (VVH101-VVH123) that identified various subsurface utilities including fiber optic cables from multiple providers (XO Communications, Crown Castle, MCI), telephone lines from Frontier Communications, cable television lines from Charter Communications, gas lines from TECO Peoples Gas, water/force mains from Hillsborough County, and traffic signal conduits. Survey coordinates were established using Real-Time Kinematic (RTK) GPS methodology tied to the Florida Permanent Reference Network, with vertical datum referenced to North American Vertical Datum of 1988 (NAVD 88) based on Hillsborough County benchmark VA-393.
The survey report provides precise horizontal and vertical locations for each utility, including station and offset information relative to the Waters Avenue baseline, surface elevations, depth measurements, utility sizes (measured in outside diameter in inches), materials, directions (N-S, E-W, or NE-SW), and utility owners. Utility depths range from approximately 1.4 to 8.0 feet below surface grade, with materials including PVC, cast iron, polyethylene, coated steel, and concrete. The report notes that all measurements and utility locations are approximate and valid only as of the survey date, reflecting information obtained from field observations and utility research. Several utilities could not be field-verified (NFV) due to environmental or soil conditions. This digitally signed and sealed survey document serves as the official record for subsurface utility conditions supporting the design and construction of the traffic signal interconnect project estimated at $2,582,238.00, with a 7% Small Business Enterprise (SBE) subcontractor participation goal.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
r e p p a M d na royevru
S l a n oi s s ef o r
P re bmuN esneciL
Y
EL
RUC .J LEAH
CI
M
FLORIDA
STATE OF
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY
THIS ITEM HAS BEEN DIGITALLY
UTV-1
VERIFIED UTILITY LOCATE
2/9/2022jwright P:\HCE1701\31-Waters at Florida Mining\CADD\69679026\roadway\sbvhrd01.dgn10:41:51 AM
CIP NO. SHT. NO.
DESCRIPTION
REVISIONS
DATE DESCRIPTION
Florida Professional Surveyor and Mapper LS 6361 Michael J. Curley PSM
Phone: (727) 822-4317 St. Petersburg, FL 33701 299 Dr. Martin Luther King Jr. Street North
Certificate of Authorization Number: LB21 George F. Young Inc.
Rule 5J-17.062 of the Florida Administrative Code.
16. This report has been digitally signed and sealed under electronic copies.
and sealed and the signature must be verified on any
15. Printed copies of this document are not considered signed seal of a Florida licensed Surveyor and Mapper.
thereof are not valid without the original signature and
This survey map and report (if applicable) or the copies 14.
proposed structures.
considered prior to the design and/or placement of file representing the map of survey, must be carefully and other VVH holes shown in this report and electronic
The surrounding utilities shown as electronic designation, feet and diameter of four inches, unless otherwise noted.
These exploratory holes were performed to a depth of ten represent exploratory holes where no utilities were found.
taken at the center of the proposed structure and
VVH test holes described as "Bottom of Excavation" were 13.
ownership.
meetings, and utility research and may not reflect actual information obtained from field observations, field
Utility owner’s names used in this report reflect 12.
unless otherwise specified.
Utility size reflects the approximate outside diameter 11.
considered approximate.
field observation under adverse conditions and should be
Utility size and material composition were collected by 10.
water table, excessive depth, and/or feature makeup.
detected due to environmental conditions, soil conditions, there is the possibility that all utilities may not be underground utilities. Although effective and reliable, industry recognized procedure for finding and locating
Utilization of the above equipment and methods is the 9.
(GPR).
of electronic designation and Ground Penetrating Radar
Vacmaster System for vacuum excavation with the benefit
Subsurface Utilities were located by utilizing the 8.
conditions may change over time.
are valid at the date of this survey only as surface grade
Surface elevations and measure downs (depth of cover) 7.
considered approximate.
deviate from the actual utility location and should be designated lines as shown in the map of survey may exposed by vacuum excavation (VVH). Electronically
6. This report contains subsurface utilities physically
Element in Microstation file algnrd01.dgn.
to the baseline of survey of Waters Ave as provided by
Utility Excavation Report table contained herein is relative
Station and offset information used for the Subsurface 5.
(elevation=26.05 feet).
on Hillsborough County benchmark VA-393
North American Vertical Datum of 1988 (NAVD 88) based
2011 (NAD 83/11). The Vertical datum is relative to the
West Zone, North American Datum of 1983 – Adjustment of relative to the Florida State Plane Coordinate System, Microstation file algnrd01.dgn. The Horizontal datum is tie to baseline monumentation provide by Element in
Permanent Reference Network (FPRN) for corrections and
Kinematic (RTK) GPS Methodology utilizing the Florida
Coordinates and elevations were established by Real-Time 4.
Engineering Group and Hillsborough County
Prepared for the exclusive benefit of: Element 3.
Test Holes 122 – 123 Aug 27 – Sep 3, 2019
Survey date: Test Holes 101 – 121 Jul 30 – Aug 5, 20192.
County, Florida.
and Florida Mining Boulevard, City of Tampa, Hillsborough subsurface utilities at the intersection of Waters Avenue
Record Survey to record the location of specific 1.
SUBSURFACE UTILITY SURVEY REPORT
Verified Vertical and HorizontalVVH
Polyvinyl ChloridePVC
Outside DiameterO.D.
Not Field VerifiedNFV
Northeast - SouthwestNE-SW
North - SouthN-S
Not ApplicableN/A
East - WestE-W
LEGEND:
8/27/19 VVH123 4" Cast-Iron Force Main (on 90° Down) 189+58.10 93.72' LT 27.06' 2.15' 24.91' Hillsborough Co. N-S Soil
8/27/19 VVH122 4" PVC Force Main (Green) 189+35.21 93.80' LT 28.72' 3.95' 24.77' Hillsborough Co. NE-SW Soil
7/30/19 VVH121 1.5" Polyethylene Fiber Optic (x3) (Black) 190+05.09 46.03' RT 26.88' 4.71' 22.17' XO Communications E-W Soil
7/30/19 VVH120 Fiber Optic (Size/Material NFV) 190+05.25 46.97' RT 26.97' 5.82' 21.15' XO Communications E-W Soil
7/30/19 VVH119 Fiber Optic (Size/Material NFV) 190+05.47 49.22' RT 26.75' 3.65' 23.10' Crown Castle E-W Soil
7/30/19 VVH118 1.25" Subduct Fiber Optic (x2) (Black) 190+05.51 50.70' RT 26.76' 3.27' 23.49' MCI E-W Concrete
7/30/19 VVH117 3" PVC Traffic Signal (x2) (Grey) 190+05.48 51.23' RT 26.77' 1.72' 25.05' Hillsborough Co. E-W Concrete
7/30/19 VVH116 4" Steel Unknown 190+05.46 52.01' RT 26.79' 3.44' 23.35' Unknown E-W Concrete
7/30/19 VVH115 6" Coated Steel Gas (Green) 190+02.46 53.58' RT 27.10' 3.44' 23.66' TECO Peoples Gas E-W Concrete
7/30/19 VVH114 2" PVC Unknown (White) 190+02.50 56.29' RT 27.53' 2.27' 25.26' Unknown NE-SW Soil
7/30/19 VVH113 4" PVC Unknown (White) 190+02.59 56.85' RT 27.62' 2.57' 25.05' Unknown NE-SW Soil
7/30/19 VVH112 Fiber Optic (Size/Material NFV) 190+04.59 60.06' RT 28.25' 7.32' 20.93' MCI E-W Soil
7/30/19 VVH111 Bottom of Excavation 189+40.21 88.01' LT 27.71' 8.0' 19.7' N/A N/A Soil
7/30/19 VVH110 Bottom of Excavation 189+39.46 78.22' LT 27.17' 8.0' 19.2' N/A N/A Soil
7/30/19 VVH109 Bottom of Excavation 189+43.78 82.82' LT 26.77' 8.0' 18.8' N/A N/A Soil
7/30/19 VVH108 4" PVC Telephone (Grey) 189+55.04 82.66' LT 26.93' 2.35' 24.58' Frontier N-S Soil
7/30/19 VVH107 4" PVC Telephone (x3) (Pink) 189+51.34 82.99' LT 26.56' 2.36' 24.20' Frontier N-S Soil
7/30/19 VVH106 4" Coated Steel Gas (Green) 189+50.24 83.07' LT 26.50' 2.57' 23.93' TECO Peoples Gas N-S Soil
7/30/19 VVH105 2" Polyethylene Cable TV (x2) (Orange) 189+49.32 83.26' LT 26.65' 2.78' 23.87' Charter N-S Soil
7/30/19 VVH104 4" PVC + 1" Diect Buried Telephone 189+48.54 83.44' LT 26.48' 1.95' 24.53' Frontier N-S Soil
7/30/19 VVH103 4" PVC Telephone (x2) 189+47.44 83.51' LT 26.55' 1.41' 25.14' Frontier N-S Soil
7/30/19 VVH102 2" PVC Cable TV (White) 189+46.28 83.68' LT 26.60' 1.95' 24.65' Charter N-S Soil
7/30/19 VVH101 1" Direct Buried Telephone 189+44.40 83.54' LT 26.67' 2.31' 24.36' Frontier N-S Soil
Date Number (Size measured in inches and is O.D.) Elev Depth (Top) Elev (Top) Owner Direction Type
Test Hole Test Hole Utility Size, Material & Type Station Offset Ground Manual Utility Utility Utility Surface
CR 584 (WATERS AVE)
T H
E
O F
F I C I A
L
R
C O
D
O F
T
H I S
S
H E
E T
I S
T
H E
E
L E
C T
R O
N I C
F I L
I G I T
A L L
Y
S I G
N
A N
D
S
E A
L
U N
D
U
L E
J -1
.0
F .A .C
69600318
CAPITAL PROGRAMS DEPARTMENT
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
| Roadway Plans |
| 01.001.keysrd 0001 - KEY SHEET |
| 01.002.signrd 0001A - NOTES TO REVIEWER |
| 01.002.signrd 0002 - SIGNATURE SHEET |
| 01.003.cessrd 0003 - SUMMARY OF PAY ITEMS |
| 01.003.cessrd 0004 - SUMMARY OF PAY ITEMS |
| 01.006.typsrd 0005 - TYPICAL SECTION |
| 01.007.sumdrd 0006 - SUMMARY OF DRAINAGE STRUCTURES |
| 01.011.ctlsrd 0007 - PROJECT CONTROL |
| 01.012.gnntrd 0008 - GENERAL NOTES |
| 01.013.planrd 0009 - ROADWAY PLAN |
| 01.013.planrd 0010 - ROADWAY PLAN |
| 01.020.drxsrd 0011 - DRAINAGE STRUCTURES |
| 01.020.drxsrd 0012 - DRAINAGE STRUCTURES |
| 01.020.drxsrd 0013 - DRAINAGE STRUCTURES |
| 01.028.spdtrd 0014 - SPECIAL DETAILS |
| 01.028.spdtrd 0015 - SPECIAL DETAILS |
| 01.028.spdtrd 0016 - SPECIAL DETAILS |
| 01.034.rdxsrd 0017 - CROSS SECTIONS |
| 01.034.rdxsrd 0018 - CROSS SECTIONS |
| 01.034.rdxsrd 0019 - CROSS SECTIONS |
| 01.034.rdxsrd 0020 - CROSS SECTIONS |
| 01.034.rdxsrd 0021 - CROSS SECTIONS |
| 01.034.rdxsrd 0022 - DRIVEWAY SECTION |
| 01.039.tcdtrd 0023 - TEMPORARY TRAFFIC CONTROL PLAN |
| 01.039.tcdtrd 0024 - TEMPORARY TRAFFIC CONTROL PLAN |
| 01.039.tcdtrd 0025 - TEMPORARY TRAFFIC CONTROL PLAN |
| 01.039.tcdtrd 0026 - TEMPORARY TRAFFIC CONTROL PLAN |
| 01.040.utadrd 0027 - UTILITY ADJUSTMENTS |
| 01.040.utadrd 0028 - UTILITY ADJUSTMENTS |
| 01.040.utadrd 0029 - UTILITY ADJUSTMENTS |
| 01.040.utadrd 0030 - UTILITY ADJUSTMENTS |
| SUMQRD01 |
| SUMQRD01 |
| SUMQRD01 |
| SUMQRD01 |
| SUMQRD01 |
| 01.041.sbvhrd UTV-0001 - VERIFIED UTILITY LOCATE |