22-Attachment C - URS - MCI-Signed.pdf

PDF 2 MB Posted

Attached to
CR 584 (Waters Ave) at Florida Mining Blvd. Intersection Improvements
Solicitation number
IFB-26-00287
Issued by
Hillsborough County, Florida

About this file

This is a signed Uniform Reimbursable Services (URS) document submitted by Hillsborough County Engineering and Operations Department for the CR 584 (Waters Ave) at Florida Mining Boulevard Intersection Improvements project in Florida. The project involves the installation of a new traffic signal system with two mast arm structures in the northwest and southeast quadrants of the intersection, along with interconnect infrastructure improvements along the CR 584 corridor spanning 0.230 miles. The scope includes roadway widening and resurfacing, sidewalk and curb ramp reconstruction, drainage improvements, and median closure work. The signalization system will include eight vehicular traffic signal assemblies with LED displays, eight pedestrian signal assemblies with countdown timers, microwave radar vehicle detection systems, fiber optic communication lines, and thermoplastic and painted pavement markings. Substantial Completion is required within 226 days from Notice to Proceed, with Final Completion within 316 days. Liquidated damages are assessed at $1,418.00 per day for substantial completion delays and $709.00 per day for final completion delays. The document was signed by Lynn Decker (Engineer of Record) on October 7, 2025, Manny Santos (Project Manager) on October 8, 2025, and Sandra Gonzalez on October 9, 2025.

The estimated contract value is $2,582,238.00, with a $250,000 allowance for permits that will be added to the bid amount. Competitive sealed bids are due August 5, 2026, by 2:00 p.m. Eastern Time through the County's Euna Procurement system. A 7% Small Business Enterprise subcontractor participation goal is required. Contractors must be prequalified with FDOT for major classes including Milling, Flexible Paving, and Hot Plant-Mixed Bituminous Courses, and specialty classes including Traffic Signals, Concrete, Drainage, and Intelligent Transportation Systems. An Earnest Money Deposit of 5% of the bid amount is required, along with Performance and Payment Bonds each equal to 100% of the total contract amount. A 5% retainage will be withheld from all progress payments. Comprehensive insurance requirements include General Liability ($500,000 to $1,000,000), Automobile Liability ($300,000 to $1,000,000), Workers' Compensation, Professional Liability ($1,000,000), Cyber Liability ($1,000,000), and Pollution Liability ($1,000,000). All insurers must maintain A.M. Best ratings of A- Class 7 or better. Questions and requests for interpretation are due no later than 14 calendar days after solicitation issuance, site visit, or pre-bid conference, whichever occurs later. Award will be made to the lowest responsive and responsible bidder. Contractors using apprentices may qualify for an incentive of 30% of apprentice costs up to a maximum of $100,000.00.

View the file

Other files

File Type Posted
39-IFB-26-00287 Plans - Waters-FL Mining SS UTV2.pdf PDF
31-Attachment D - Permits - Waters Ave. at Florida Mining Blvd.exemption.pdf PDF
30-Attachment D - Permits - SWFWMD Permit Withdrawn.pdf PDF
32-Attachment E - Drainage-Memo.pdf PDF
18-Attachment C - URS - COTW Signed.pdf PDF
44-SBE Goal Participation SBE-1 Form Tutorial (SBE Division v3).mp4 MP4 file
7-Change Order Form.pdf.pdf PDF
40-IFB-26-00287 Project Map.pdf PDF
11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
29-Attachment C - URS - Utility Certification Letter 10.8.25.pdf PDF
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
36-IFB-26-00287 Plans - ROADWAY.pdf PDF
23-Attachment C - URS - NC - Spectrum No Conflict.pdf PDF
15-Attachment A - Construction Sign 2026.pdf PDF
8-Insurance Certificate.doc.doc DOC document
26-Attachment C - URS - TCA- URS-Signed.pdf PDF
34-Performance Bond.pdf PDF
25-Attachment C - URS - Tampa Electric Signed.pdf PDF
42-Agreement - Construction - Stand Alone.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
14-Subcontractor Letter of Intent .pdf PDF
45-IFB-26-00287 Contract Terms and Conditions.pdf PDF
27-Attachment C - URS - TECO Peoples Gas-Signed.pdf PDF
19-Attachment C - URS - CrownCastle-Signed.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
38-IFB-26-00287 Plans - Waters-FL Mining SS UTV1.pdf PDF
41-IFB-26-00287 Supplemental Specifications.pdf PDF
4-Application for Payment.pdf.pdf PDF
24-Attachment C - URS - NC - Summit No Conflict Letter.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
16-Attachment B - GEO - Rpt Rev1 SS.pdf PDF
35-Payment Bond.pdf PDF
37-IFB-26-00287 Plans - SIGNALIZATION.pdf PDF
3-Allowance Authorization Release Form.pdf.pdf PDF
21-Attachment C - URS - FTR Signed.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
33-Bid Bond.doc DOC document
20-Attachment C - URS - FIBERLIGHT -Signed.pdf PDF
28-Attachment C - URS - UNITI FIBER Signed.pdf PDF
17-Attachment C - URS - CenturyLink Signed.pdf PDF
9-Substitute W9 Form.pdf.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
43-IFB-26-00287 Insurance Requirements.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lynn Decker

Engineer of Record

10/7/2025

GonzalezSa Typewritten Text Manny Santos

GonzalezSa Typewritten Text Project Manager

GonzalezSa Typewritten Text 10/08/2025

GonzalezSa Typewritten Text 10/09/2025

2025-10-08T15:29:34-0400
Manuel Santos
2025-10-09T08:49:37-0400
Sandra González

File details come from the government source that posted it. Updated .