31-Attachment D - Permits - Waters Ave. at Florida Mining Blvd.exemption.pdf

PDF 517 KB Posted

Attached to
CR 584 (Waters Ave) at Florida Mining Blvd. Intersection Improvements
Solicitation number
IFB-26-00287
Issued by
Hillsborough County, Florida

About this file

This is a permit determination letter from the Environmental Protection Commission (EPC) of Hillsborough County regarding utility relocation work associated with the Waters Avenue at Florida Mining Boulevard Intersection Improvements project (CIP 69600318/CR 584). Element Engineering Group, LLC submitted a request on behalf of the County seeking confirmation that the proposed horizontal adjustment of approximately 40 linear feet of 4-inch forcemain, which will be impacted by the installation of a new mast arm, meets permit exemption criteria. The project involves utility coordination to relocate the wastewater collection infrastructure to accommodate the traffic signal equipment installation at the intersection.

On March 10, 2023, Lora Woodard, P.E., Senior Engineering Specialist with EPC of Hillsborough County, issued a determination confirming that a Domestic Wastewater Collection System Permit is not required for this project. This exemption determination indicates that the proposed work meets the applicable criteria for permit exemption under Hillsborough County regulations, allowing the project to proceed without obtaining a separate wastewater permit for the forcemain relocation.

View the file

Other files

File Type Posted
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
36-IFB-26-00287 Plans - ROADWAY.pdf PDF
23-Attachment C - URS - NC - Spectrum No Conflict.pdf PDF
15-Attachment A - Construction Sign 2026.pdf PDF
8-Insurance Certificate.doc.doc DOC document
26-Attachment C - URS - TCA- URS-Signed.pdf PDF
34-Performance Bond.pdf PDF
25-Attachment C - URS - Tampa Electric Signed.pdf PDF
42-Agreement - Construction - Stand Alone.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
14-Subcontractor Letter of Intent .pdf PDF
45-IFB-26-00287 Contract Terms and Conditions.pdf PDF
27-Attachment C - URS - TECO Peoples Gas-Signed.pdf PDF
19-Attachment C - URS - CrownCastle-Signed.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
38-IFB-26-00287 Plans - Waters-FL Mining SS UTV1.pdf PDF
41-IFB-26-00287 Supplemental Specifications.pdf PDF
4-Application for Payment.pdf.pdf PDF
24-Attachment C - URS - NC - Summit No Conflict Letter.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
16-Attachment B - GEO - Rpt Rev1 SS.pdf PDF
35-Payment Bond.pdf PDF
37-IFB-26-00287 Plans - SIGNALIZATION.pdf PDF
3-Allowance Authorization Release Form.pdf.pdf PDF
21-Attachment C - URS - FTR Signed.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
33-Bid Bond.doc DOC document
20-Attachment C - URS - FIBERLIGHT -Signed.pdf PDF
28-Attachment C - URS - UNITI FIBER Signed.pdf PDF
17-Attachment C - URS - CenturyLink Signed.pdf PDF
9-Substitute W9 Form.pdf.pdf PDF
22-Attachment C - URS - MCI-Signed.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
43-IFB-26-00287 Insurance Requirements.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
39-IFB-26-00287 Plans - Waters-FL Mining SS UTV2.pdf PDF
30-Attachment D - Permits - SWFWMD Permit Withdrawn.pdf PDF
32-Attachment E - Drainage-Memo.pdf PDF
18-Attachment C - URS - COTW Signed.pdf PDF
44-SBE Goal Participation SBE-1 Form Tutorial (SBE Division v3).mp4 MP4 file
7-Change Order Form.pdf.pdf PDF
40-IFB-26-00287 Project Map.pdf PDF
11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
29-Attachment C - URS - Utility Certification Letter 10.8.25.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

From: Mark Atkinstall <matkinstall@elementeg.com>

Sent: Wednesday, March 8, 2023 9:59 AM

To: Woodard, Lora <WoodardL@epchc.org>

Cc: Lynn Decker <ldecker@elementeg.com>

Subject: CIP 69600318//CR 584 (Waters Avenue) at Florida Mining Blvd Intersection Improvements // Permit

Determination Request

Hi Lora, We have another project for the County that we are relocating approximately 40 LF of 4” forcemain that will be impacted by the installation of a new mast arm. We are seeking confirmation on whether the proposed horizontal adjustment meets the permit exemption criteria.

Regards, A. MARK ATKINSTALL, PE, MSCE

ELEMENT ENGINEERING GROUP, LLC

1713 E. 9th AVENUE | TAMPA, FL 33605

P: 813.386.2101 EXT. 129 | F: 813.386.2106 | TF: 888.603.1942

MATKINSTALL@ELEMENTEG.COM| WWW.ELEMENTEG.COM

TRANSPORTATION | CIVIL | UTILITY COORDINATION

SURVEYING & MAPPING

SUBSURFACE UTILITY ENGINEERING

CERTIFIED MBE | DBE

Work Hours: Mon. - Thurs. 6:30 am – 5:00 pm

Based on the information provided in this letter and attached drawings or documents, a

Domestic Wastewater Collection System Permit is not required for this project.

Lora Woodard, P.E., Senior Engineering Specialist

3/10/2023

Name Date

EPC of Hillsborough County mailto:MATKINSTALL@ELEMENTEG.COM https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.elementeg.com%2F&data=05%7C01%7Cwoodardl%40epchc.org%7Cb8896193bb6a4003361f08db1fe5a5fc%7Cf82250c421b643ada0095dbf5b6ad62d%7C0%7C0%7C638138843941440947%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=FEutBwZT0CGaqLAhpbke52TKNqz0u4aDYXeAMrGrRyk%3D&reserved=0

File details come from the government source that posted it. Updated .