This is a Drainage Memorandum prepared by Element Engineering Group for Hillsborough County Project No. 69600318, documenting drainage improvements associated with intersection enhancements at CR 584 (Waters Ave) and Florida Mining Boulevard. The project includes signalization installation, milling, resurfacing, minor sidewalk additions, drainage improvements, and signing and pavement marking updates. The primary objective is to increase vehicular and pedestrian safety by adding a traffic signal at the intersection and widening the northeast quadrant to better accommodate truck traffic. Field reviews conducted on April 20, 2021 identified minor ponding in the northwest quadrant and off-tracking in the southwest corner. The drainage analysis confirms that the proposed improvements, including a new curb inlet at the northeast corner and a ditch bottom inlet for the signal pole on the northwest corner, will maintain the existing closed drainage system's functionality with hydraulic grade line clearances meeting the minimum 1-foot standard. A Supplemental Agreement No. 1 dated November 8, 2021 outlined Phase I services focused on signalization and minor roadway improvements.
The drainage design incorporates Storm Sewer Tabulation analysis and spread calculations across multiple inlets and structures to ensure proper stormwater management. Existing runoff along CR 584 (Waters Ave) drains via curb and gutter into a closed drainage system ultimately discharging into Sweetwater Creek west of Anderson Road. The proposed design maintains this drainage pattern while accommodating the intersection redesign. The related contract opportunity, estimated at $2,582,238.00, seeks competitive sealed bids for installation of the new traffic signal with two mast arm structures in the northwest and southeast quadrants. An SBE (Small Business Enterprise) subcontractor goal of 7% has been established for participation. Questions and requests for interpretation must be submitted no later than 14 calendar days following the solicitation issuance, site visit, or pre-bid conference, whichever occurs later.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drainage Memorandum – CR 584 (Waters Ave) at Florida Mining Blvd. Page: 1
Hillsborough County Project No. 69600318 June 2023
DRAINAGE MEMORANDUM
FOR
CR 584 (Waters Ave) at Florida Mining Blvd.
HILLSBOROUGH COUNTY
PROJECT NUMBER: 69600318
Prepared By: Heather Rocha, PE
Element Engineering Group
1713 E. 9th Avenue
Tampa, FL 33605
June 2023
Drainage Memorandum – CR 584 (Waters Ave) at Florida Mining Blvd. Page: 2
TABLE OF CONTENTS
1. Project Description
2. Scope of Work
3. Existing Condition
4. Proposed Conditions
1. Project Description
Improvements to CR 584 (Waters Ave.) at Florida Mining Blvd. include signalization at the intersection of Florida Mining Blvd., milling, resurfacing, minor sidewalk additions, drainage improvements, and signing and pavement marking improvements.
2. Scope of Work
The purpose of this project is to increase vehicular and pedestrian safety at the intersection of CR
584 (Waters Ave.) and Florida Mining Blvd by adding a signal. Widening on the northeast quadrant of the intersection will help better accommodate truck traffic turning onto Florida Mining Blvd. from westbound CR 584 (Waters Ave.).
3. Existing Condition
Field Reviews
The project was reviewed 4/20/2021 during a rain event and the following was observed:
(Photos and field notes are included in Appendix B)
• Minor ponding was observed in the northwest quadrant at the intersection of CR 584
(Waters Ave.) and Florida Mining Blvd. (See Photo #1)
• Off tracking and minor ponding was observed in southwest corner of the existing driveway directly south of Florida Mining Blvd. (See Photo #2)
Drainage Flows
In the existing condition, runoff along CR 584 (Waters Ave.) drains via curb and gutter along both the north and south sides of the road and into a closed drainage system.
Runoff along Florida Mining Blvd drains to the closed drainage system on CR 584 (Waters
Ave.) via a curb inlet on the east side of the road and an open ditch to mitered end section on the west side of the road. The closed drainage system drains into Sweetwater
Creek to the west of Anderson Rd.
4. Proposed Conditions
At the intersection of Waters Ave and Florida Mining, the redesign of the northeast curb return to better accommodate large semi-trucks will require a new curb inlet. The signal pole on the northwest corner will impact the existing mitered end section requiring the addition of a ditch bottom inlet.
Although the runoff will be routed in a slightly different manor, the ultimate outfall of the runoff remains the closed drainage system on CR 584 (Waters Ave.). Storm Sewer Tabulations were utilized to ensure that the closed drainage system will continue to function in its proposed condition as it does in its existing condition. The Storm Sewer Tabulations confirmed that the hydraulic grade line
(HGL) clearances meet the minimum 1-ft standard (See Appendix C). Spread was also analyzed for the new curb inlet (See Appendix C).
Drainage Memorandum – CR 584 (Waters Ave) at Florida Mining Blvd. Page: 3
Appendices
Appendix A: Scope and Staff Hours
Appendix B: Field Review Photos and Notes
Appendix C: Drainage Calculations
Appendix D: Project Location Map
Drainage Memorandum – CR 584 (Waters Ave) at Florida Mining Blvd.
Appendix A: Scope and Staff Hours
A-1
November 8, 2021
SUPPLEMENTAL AGREEMENT NO. 1
SCOPE OF SERVICES ADJUSTMENT
FOR
CIP Project 69600318
(Formerly 69679026)
CR 584 (Waters Ave) at Florida Mining Blvd Signalization Only
COUNTY COMMISSIONER DISTRICT 1
HILLSBOROUGH COUNTY
Approved By: County Project Manager Consultant Project Manager
Signature Signature
Sandeep Janwadkar Lynn Decker
Printed Name Printed Name
Date Date ldecker Typewritten Text 11/8/2021
November 8, 2021 Scope – Phase I: Signal Only CIP 69600318
A-2
I. BACKGROUND
ELEMENT Engineering Group, LLC. (CONSULTANT) was retained by Hillsborough County
(COUNTY) for the design of intersection improvements: “CR 584 (Waters Ave) from Anderson
Rd to Florida Mining Blvd. Intersection Improvements” which was executed under WO number
PWTDD20210032, dated December 9, 2020. This agreement will augment the scope approved under the original work order.
II. OBJECTIVES
The general objective of this Supplemental Agreement #1 is to provide signalization only with minor roadway improvements (Phase I of the overall project) which results in the following changes to the design services:
• Design Services o Redesign the intersection to complete the necessary roadway improvements, such as an improved NE corner to accommodate the prevalent truck turning movement, within the existing right-of-way limits.
o Drainage improvements to accommodate the redesigned roadway improvements.
o Preparing design deviation memo for sidewalk width per the Technical
Design Bulletin Design Deviation requirements.
o Updated utility coordination for the new plan set.
• Major work mixes include: Roadway and Drainage Design
• Minor work groups include: Signalization, Signing and Pavement Marking
Design
The mast arm design was previously completed for the advance procurement of the equipment.
III. SERVICES
Under this Supplemental Amendment, the CONSULTANT will provide the following services:
3 PROJECT COMMON AND PROJECT GENERAL TASKS
3.1 Public Involvement
3.1.9 Public Meeting Preparations
The CONSULTANT will prepare the necessary electronic plan exhibits for use in public meetings prior to construction.
3.4 Contract Maintenance and Project Documentation
Contract maintenance includes project management effort for complete setup and maintenance of files, electronic folders and documents, developing technical
A-3 monthly progress reports and schedule updates. Project documentation includes the compilation and delivery of final documents, reports or calculations that support the development of the contract plans
3.6 Prime Consultant Project Manager Meetings
Includes only the Prime Consultant Project Manager's time for travel and attendance at Activity Technical Meetings and other meetings listed in the meeting summary for
Task 3.6 on tab 3 Project General Task of the staff hour forms. Staff hours for other personnel attending Activity Technical Meetings are included in the meeting task for that specific Activity.
3.8 Post Design Services
3.9 Digital Delivery
4 ROADWAY ANALYSIS
4.3 Pavement Design Package
Updates for one resurfacing and one widening pavement design per County comments. The widening pavement design will be used for the northeast corner of the intersection and the locations where the traffic separators are being modified.
4.5 Horizontal/Vertical Master Design Files
The CONSULTANT will update the design files per the new typical section requested by the County. The CONSULTANT will also update utility conflict information to be provided to project Utility Coordinator in the format requested by the COUNTY and will review Utility Work Schedules.
4.9 Cross Section Design Files
The CONSULTANT will update the cross section design files with the new typical section requested by the County. Cross sections will be provided in the plans at 50-foot intervals.
4.10 Temporary Traffic Control Plan Analysis
4.11 Master TTCP Design Files
4.14 Design Deviations & Exceptions
The CONSULTANT will prepare a design deviation related to the sidewalk width per the new Technical Design Bulletin guidelines.
4.15 Design Report
4.16 Quantities
A-4
4.17 Cost Estimate
4.20 Field Reviews
4.22 Technical Meetings
The CONSULTANT will attend meetings to get approval of the Design Deviations and Design Exceptions.
4.23 Quality Assurance/Quality Control
4.25 Supervision
4.26 Coordination
5 ROADWAY PLANS
5.1 Key Sheet
5.2 Summary of Pay Items
5.3 Typical Section Sheets
5.3.1 Typical Sections
5.3.2 Typical Section Details
5.4 General Notes/Pay Item Notes
5.5 Summary of Quantities Sheets
5.9 Plan Sheet
The CONSULTANT will prepare plan sheets at 1”=40’ scale updated with the new typical section.
5.15 Special Details
5.18 Cross Sections
The CONSULTANT will prepare cross section sheets updated with the new typical section.
5.19 Temporary Traffic Control Plan Sheets
5.21 Temporary Traffic Control Detail Sheets
5.22 Utility Adjustment Sheets
5.28 Quality Assurance/Quality Control
A-5
5.29 Supervision
6a DRAINAGE ANALYSIS
6a.9 Design of Storm Drains
6a.13 Drainage Design Documentation Report
6a.18 Other Drainage Analysis
6a.19 Field Reviews
6a.20 Technical Meetings
6a.22 Quality Assurance/Quality Control
6a.24 Supervision
6a.25 Coordination
6b DRAINAGE PLANS
6b.3 Summary of Drainage Structures
6b.5 Drainage Structure Sheets
6b.11 Erosion Control Plan Sheet(s)
6b.13 Quality Assurance/Quality Control
6b.14 Supervision
7 UTILITIES
7.6 Individual/Field Meetings
The CONSULTANT will meet with each UAO as necessary, separately or together, throughout the project design duration to provide guidance in the interpretation of plans, review changes to the plans and schedules, standard or selective clearing and grubbing work, and assist in the development of the UAO(s) plans and work schedules. The CONSULTANT is responsible for motivating the UAO to complete and return the necessary documents after each Utility Contact or Meeting.
7.9 Utility Design Meeting
A-6
The CONSULTANT will schedule (time and place), notify participants, and conduct a Utility meeting with all affected UAO(s). The CONSULTANT will be prepared to discuss impacts to existing trees/vegetation and proposed landscape, drainage, traffic signalization, temporary traffic control plans (TTCP) (construction phasing), review the current design schedule and letting date, evaluate the utility information collected, discuss any future design issues that may impact utilities, etc., to the extent that they may have an effect on existing or proposed utility facilities with particular emphasis on drainage and TTCP with each UAO. The intent of this meeting will be to assist the UAOs in identifying and resolving conflicts between utilities and proposed construction before completion of the plans, including utility adjustment details. Also, to work with the UAOs to recommend potential resolution between known utility conflicts with proposed construction plans as may be deemed practical by the UAO. The CONSULTANT will keep accurate minutes of all meetings and distribute a copy to all attendees within 3 days.
7.10 Review Utility Markups & Work Schedules, and Processing of Schedules &
Agreements
7.11 Utility Coordination/Follow-up
The CONSULTANT will provide utility coordination and follow up. This includes follow up, interpreting plans, and assisting the UAOs with completion of their work schedules and agreements. Includes phone calls, face-to-face meetings, etc., to motivate and ensure the UAO(s) complete and return the required documents in accordance with the project schedule. Ensure the resolution of all known conflicts.
The CONSULTANT will keep accurate minutes of all meetings and distribute a copy to all attendees. This task can be applied to all phases of the project.
7.15 Contract Plans to UAO(s)
7.16 Certification/Close-Out
7.17 Other Utilities
Utility ROW Use Permit Reviews
19 SIGNING AND PAVEMENT MARKING ANALYSIS
19.3 Signing and Pavement Marking Master Design File
19.7 Quantities
19.8 Cost Estimate
19.13 Quality Assurance/Quality Control
19.15 Supervision
A-7
19.16 Coordination
20 SIGNING AND PAVEMENT MARKING PLANS
20.3 Tabulation of Quantities
20.4 General Notes/Pay Item Notes
20.6 Plan Sheet
20.14 Quality Assurance/Quality Control
20.15 Supervision
21 SIGNALIZATION ANALYSIS
21.5 Reference and Master Signalization Design File
21.6 Reference and Master Interconnect Communication Design File
21.10 Quantities
21.11 Cost Estimate
21.15 Technical Meetings
21.16 Quality Assurance/Quality Control
21.18 Supervision
21.19 Coordination
22 SIGNALIZATION PLANS
22.3 Tabulation of Quantities
22.4 General Notes/Pay Item Notes
22.5 Plan Sheet
22.6 Interconnect Plans
22.17 Quality Assurance/Quality Control
22.18 Supervision
A-8
IV. PROVISIONS FOR WORK
All services will be performed in accordance with the governing provisions outlined in the
Original Agreement and any previous Agreements.
V. COUNTY RESPONSIBILITIES
The COUNTY will provide the services outlined in the Original Agreement and any previous
Agreements.
VI. SUMMARY OF COMPENSATION
For a summary of all compensation for this Supplemental Agreement, please refer to the attached
Exhibit “B”, which is incorporated herein by reference.
Appendix B: Field Review Photos and Notes
Field Notes kwilliams Text Box B-1
B-2
Photos
B-3
Photo #1
Photo #2
B-4
Appendix C: Drainage Calculations
Spread Calcs
C-1
35/45
DESIGN SPEED <= 45 MPH; KEEP 1/2 OF LANE CLEAR
HR Date: 2/14/2023 45< DESIGN SPEED <= 55MPH; KEEP 8' OF LANE CLEAR
AG Date: 2/20/2023 DESIGN SPEED > 55 MPH; NO ENCROACHMENT
STA. Structure # C I A
Overland
Runoff
Previous
By-pass Total Flow
Cross Slope
(ft/ft)
Long slope (%)
Spread (ft)
(n=.016)
Max Available
Spread (ft)
Bypass
Flow
Bypass to
Inlet
Good / No
Good
Inlet
Type Notes
10+76.25 (CL
Const) ST-33 (South) 0.85 4.00 0.078 0.264 0.264 0.022 0.696 4.4 7.500 0.000 GOOD CI5
10+76.25 (CL
Const) ST-33 (North) 0.95 4.00 0.256 0.973 0.973 0.022 2.600 5.6 7.500 0.000 GOOD CI5
11+15.01 (CL
Const) Check Section 0.95 4.00 0.234 0.889 0.889 0.015 0.920 8.4 7.500 0.000 NO GOOD
This check section is to display that in the existing condition the spread is not below the maximum allowed and to confirm that an inlet is needed in the proposed condition.
190+40 ST-32 (East) 0.73 4.00 0.507 1.475 1.475 0.045 0.600 5.5 11.300 0.000 GOOD CI5
CIP: 69600318
Designed by:
Checked by:
Existing Condition
SPREAD CALCULATIONS
Element Project Number : HCE1701.31
Element Project Name : CR 584 (Waters Ave) at FL Mining DESIGN SPEED:
35/45
DESIGN SPEED <= 45 MPH; KEEP 1/2 OF LANE CLEAR
HR Date: 2/14/2023 45< DESIGN SPEED <= 55MPH; KEEP 8' OF LANE CLEAR
AG Date: 2/20/2023 DESIGN SPEED > 55 MPH; NO ENCROACHMENT
STA. Structure # C I A
Overland
Runoff
Previous
By-pass Total Flow
Cross Slope
(ft/ft)
Long slope (%)
Spread (ft)
(n=.016)
Max Available
Spread (ft)
Bypass
Flow
Bypass to
Inlet
Good / No
Good
Inlet
Type Notes
11+48.7 Flume 0.95 4.00 0.221 0.840 0.840 0.022 0.830 6.6 7.500 0.000 GOOD Flume
11+15.01 (CL
Const) S-4 0.95 4.00 0.124 0.471 0.471 0.015 3.900 5.0 7.500 0.000 GOOD CI5
To be conservative half of the area contributing to the open flume will be added to this inlet in order to account for bypass flow.
10+69.08 (CL
Const)
Trench Drain
(South) 0.95 4.00 0.095 0.360 0.360 0.015 0.300 7.3 7.500 0.000 GOOD
Trench
Drain
10+69.08 (CL
Const)
Trench Drain
(North) 0.95 4.00 0.031 0.118 0.118 0.015 3.040 3.1 7.500 0.000 GOOD
Trench
Drain
10+80.46 (CL
Const) S-2 (South) 0.75 4.00 0.611 1.829 1.829 0.040 0.620 6.4 16.250 0.000 GOOD CI6
10+80.46 (CL
Const) S-2 (Nouth) 0.78 4.00 0.330 1.027 1.027 0.040 3.910 3.7 16.250 0.000 GOOD CI6
SPREAD CALCULATIONS
Element Project Number : HCE1701.31
Element Project Name : CR 584 (Waters Ave) at FL Mining DESIGN SPEED:
Proposed Condition
CIP: 69600318
Designed by:
Checked by:
TAMPA, FL 33605
1713 E. 9th AVENUE
ELEMENT ENGINEERING GROUP
P.E. LICENSE NUMBER 85417
KEVIN M. WILLIAMS, P.E.
2/20/2023Heather Rocha P:\HCE1701\31-Waters at Florida Mining\CADD\Exhibits\Basin Maps\PROPOSED_BASIN_5.dgn3:38:38 PM
CIP NO. SHT. NO.
DESCRIPTION
REVISIONS
DATE DESCRIPTION
T H
E
O F
F I
C I
A L
R
C O
D
I
S
E E
T
E C
T R
O N
C
G I
T A
L
Y
G N
N
A L
U
D
U
L E
G
A
C
69600318
CAPITAL PROGRAMS DEPARTMENT
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
cr (waters ave) at florida mining blvd584
HILLS. CO. PROJ. 85-33-R
EXISTING R/W LINE PER
HILLS. CO. PROJ. 85-33-R
EXISTING R/W LINE PER
E N
D
O
F
C
O N
S T
R U
C T
IO
N
C
L
P .O
T
S T
A
.0
D E
F A
U L T
.2
D E
F A
U L T
.2
D E
F A
U L T
.6
18" RCP
B P
C U
L V
P C
U L
V "R
C P
.9
INV. EL = 24.99'
(END UNKNOWN)
18" RCP
INV. EL = 25.00'
B P
C U
L V
P C
U L
V "R
C P
.0
INV. EL = 25.08'
15" RCP
B P
C U
L V
P C
U L
V "R
C P
.1
INV. EL = 25.18'
B S
L P
Z
.4
B S
L P
Z
.4
B P
C U
L V
P C
U L
V "R
C P
.5
INV. EL = 25.53'
B M
E S
.5
B
M E
S
.5
B M
E S
.6
B M
E S
.6
B S
L P
Z
.7
B M
E S
.9
B S
L P
Z
.9
B M
E S
.1
B S
L P
Z
.1
B S
L P
Z
.3
B S
L P
Z
.4
B S
L P
Z
.5
S A
N B M
H S
.7
B S
L P
Z
.7
B S
L P
Z
.7
6 B M
E S
.8
B M
E S
.8
B M
E S
.8
B M
E S
.9
B M
E S
.9
B M
E S
.9
15" RCP
B S
E W
.1
B S
E W
.1
B S
L P
Z
.2
B S
L P
Z
.2
B S
L P
Z
.2
S T
A R
.2
B S
L P
Z
.2
B W
P B
F R
O N
T I E
R
.3
FRONTIER
B S
E W
.3
B S
E W
.3
B S
E W
.3
B S
E W
.3
B S
E W
.3
B S
E W
.3
B W
P B
E L E
C
.4
B W
P B
V E
R I Z
O N
.4
4 VERIZON
S A
N B M
H S
.4
T R
E E
O A
.5
13"
T A
L
.5
B H
H
H A
N D
H O
L E
U N
K .5
B S
L P
Z
.6
W A T E R
B M
W
.6
D E
F A
U L T
.7
B S
L P
Z
.7
A
L B
.7
CONCRETE DRIVEWAY
B W
P B
V E
R I Z
O N
.8
W A T E R B V
C W
.8
W A T E R
B M
W
.9
F H
.9
T R
E E
O A
.9
16"
B G
N D
.9
T R
E E
.9
17"
CONCRETE DRIVEWAY
B G
N D
.0
6 S A
N B M
H S
.1
B A
S P
H
.2
D E
F A
U L T
.2
T R
E E
O A
.3
4' CONCRETE SIDEWALK
ASPHALT PARKING LOT
B F
L
.3
P O
S T
.3
PVC
B W
P B
B H
O U
S E
.3
B T
O G
T O
G
.3
B W
P B
B H
O U
S E
.4
BRIGHT HOUSE
D E
F A
U L T
.4
S S
S
.4
E L
E C M E
.4
ST-37
B O
L
.5
D E
F A
U L T
.5
B G
N D
.5
T R
E E
.5
20"
B V
C
I R
R I G
A T I O
N
.6
P P
T
.6
WOOD
S S
S
.6
TURN
D E
F A
U L T
.7
B F
L
.7
ASPHALT PARKING LOT BUSINESS
6' WOOD BOARD FENCE
B C
G B
.8
B V
C
I R
R I G
A T I O
N
.9
B G
N D
.9
D E
F A
U L T
.9
B G
N D
.0
B C
G B
.1
8' CHAIN LINK FENCE WITH BARBED WIRE
PUBLIC ROAD
ASPHALT PAVEMENT
FLORIDA MINING BLVD.
12 13 14FLORIDA MINING BLVD.
R/W LINE
R/W LINE
2.77 CFS BASEFLOW
(S-2 NORTH)
0.330 AC
PROPOSED BASIN MAP
0.221 AC
M A
T C
H
LI
N E
S
E E
P R
E V
IO
U
S S
H E
E
Storm Tabs
C-8
PROJECT: CR 584 (Waters Ave) at FL Mining UNITS: PREPARED BY: DATE: 2/14/2023
PROJECT NUMBER: LOCATION: CHECKED BY: DATE: 2/20/2023
Based on Hillsborough County Standards
B A
W
(c fs
S
LO
LE
V
(f t)
(if e ed ed
PIPE
SIZE
(in.)
SLOPE (%)
ZONE OR COUNTY: 6
c = 0.95 Ellip.? FREQUENCY: 10 YR c = 0.20 ROUGHNESS COEF.: 0.012
UPPER c = 0.40 PHYSICAL TAILWATER EL (ft.)* 22.50
STATION
D
IS
T A
N C
E ft
S
ID
E
LOWER
IN
C
R E
M E
N T
S U
B T
O T
A L
U P
P E
R E
V A
T
IO
N ft
LO
W
E R
E
V
A T
IO
N ft
F A
LL
ft
S P
A N
R
O U
N D
(R
U
N D
E Q
U
IV
MIN. PHYS.
P H
Y S
IC
L O
C
IT
Y fp s)
NOTES: C
L
E A
R A
N C
L U
E S ft
S-5 DBI 0.22 0.22 0.209 2.77 23.77 22.90 0.02 Ellip. 0.15 2.5 Clearance of HGL 1.73
0.10 0.10 0.020 4.48 25.5 23.77 23.71 14 0.50 Clearance of Pipe 1.73
S-4 L 12 0.00 0.00 0.000 22.60 22.54 18 0.15 S-4 CI5 0.14 0.36 0.342 2.77 24.04 0.00 0.08 No 0.23 3.1 Clearance of HGL 2.67
0.00 0.10 0.020 5.47 26.71 24.04 23.30 0 2.00 Clearance of Pipe 2.67 S-3 L 37 0.00 0.00 0.000 22.54 21.80 18 0.15
S-3 MH 0.00 0.36 0.342 17.15 23.80 22.90 0.05 No 0.257 4.6 Clearance of HGL 2.78
0.00 0.10 0.020 22.61 26.58 23.80 22.90 0 4.50 Clearance of Pipe 2.78
S-2 M 20 0.00 0.00 0.000 21.30 20.40 30 0.076 EOP Used
S-2 CI6 0.71 1.07 1.017 22.90 22.50 0.13 No 0.39 5.7 Clearance of HGL 2.85
0.23 0.33 0.066 25.75 22.90 22.40 0 1.47 Clearance of Pipe 2.85
S-1 M 34 0.00 0.00 0.000 20.40 19.90 30 0.076
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
STORM DRAIN TABULATION FORM
US Customary HR 69600318 CR 584 (Waters Ave) at FL Mining AG
LOCATION
OF
UPPER END
S
T R
U C
T U
R E
N O
T Y
P E
O F
S T
R U
C T
U R
E
M A
IN
LI
N E
M
O
R L
A T
E R
A L
L)
LE
N
G T
H ft
DRAINAGE AREA
(Ac)
S U
B -T
O T
(C *A
T
IM
E O
F C
O N
C E
N T
R A
T
IO
N m in
T
IM
E O
F F
L O
W I
N S
E C
T
IO
N m in
A C
T U
L O
C
IT
Y fp s)
F U
L L
F L
O W
C A
P A
C
IT
Y cf s)
T O
T A
L R
U N
O F
F cf s)
E D
G E
O F
P A
V E
M E
N T
G
A T
E E
L E ft
CROWN HYD. GRAD.
FLOW LINE RISE
ALIGNMENT NAME
CL
10.11 0.02 7.44 0.36 1
IN
T
E N
S
IT
Y in h r.
T O
T A
L
C *A
HYDRAULIC GRADIENT
N U
M B
E R
O F
B A
R R
E L
S
CL
10.04 0.07
94.26
11+01.5 19.97 RT 0.90 19.2
8.05
11+19 30.22 LT 0.06 4.6
CL
10.00 0.04 7.47 0.23 1
1 53.87
10+80.46 32.38 RT 0.50 11.0
CL
10.13 0.05 7.44 1.08 27.97
7.47 0.36 1 16.09
11+15 18.88 LT 0.74 9.1
CIP No.: 69600318 Designed By: K. Williams Date:
ELEMENT No.: HCE 1701.31 Checked By: A. Gregg Date:
From To Velocity Q (cfs) Pipe Type n Nominal Pipe Size A R S (%) 12+50 (Side Drain) S-5 2.25 2.77 Concrete 0.012 15 1.227 0.3125 0.16%
11+39 S-3 6.93 12.25 Concrete 0.012 18 1.767 0.375 1.15% ST-36 S-3 2.77 4.90 Concrete 0.012 18 1.767 0.375 0.18%
Project: CR 584 (Waters Ave) at FL Mining
2/1/2022 2/1/2022
Gravity Flow Hydraulic Calculator
Appendix D: Project Location Map
Line kwilliams Line kwilliams Line kwilliams Line kwilliams Line kwilliams Line kwilliams Line kwilliams Line kwilliams Callout Project Location kwilliams Text Box CR 584 (Waters Ave) kwilliams
Florida Mining Blvd.
| Appendix A: Scope and Staff Hours |
| Appendix B: Field Review Photos and Notes |
| Appendix C: Drainage Calculations |
| Appendix D: Project Location Map |