Attachment 01 - Storm Drain Responses.pdf
PDF 3 MB Posted
- Solicitation number
- 36C78620B0015
About this file
This package contains construction plans and drawings for a storm drain system and related details for the Miramar National Cemetery Expansion project. Key specifications include installing an 18-inch outlet pipe and riser per Detail A, constructing headwalls and installing riprap as shown on sheets C-206 and C-507. The project will expand columbarium niches and in-ground cremation areas at the Miramar National Cemetery in San Diego, California. The solicitation was issued by the Department of Veterans Affairs National Cemetery Administration as opportunity 36C78620B0015 to construct the cemetery expansion with a projected number 892-036. The construction plans provide necessary information for bidding on storm drain installation and utilities as part of the overall expansion project.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 381
2 37
3 37
6 37
7 37
Revisions Date
Approved: Director, Project Management Service
Approved: Director, Office of Construction Management
Drawing Title
OfDwg.
Building Number
Location
Project Title
Checked DRAWING NO.
Project No.
Date
Drawn
892CM3036
Pl ott ed : 5
/11 /20 at 1:
pm
B y:
jsu nw oo Fil e:
L:\
1.0
Pr oje cts \20
-0
4 -
M ira ma r N
C Ph as e I
I\A
CA
D\ Pl an s\B id Do cs \89
2C M3
6-
Ci vil
S tor m Pl an S he ets
.dw g
ENGINEER OF RECORDCONSULTANTS
BID DOCUMENTS
TERRACON
1421 EDINGER AVENUE, SUITE C
TUSTIN CA 92780
(949) 383-1990
2 2 5 M i l l e r A v e n u e , M i l l V a l l e y , C A 9 4 9 4 1 T 415 383 7900 F 415 383 1433 www.rhaa.com
MAY 2020
MIRAMAR NATIONAL CEMETERY
5795 NOBEL DRIVE
SAN DIEGO, CALIFORNIA 92122
COLUMBARIUM AND CREMAINS
EXPANSION
ENGINEERED WITH LAYTON
1490 S PRICE RD, SUITE 215
CHANDLER, AZ 85286 NA NEL JHS
C-207
SE
E
SH
EE
T C
-2
STORM DRAIN PLAN 4
ADD ALT 5
C-204
C-205
C-206 C-207
1"=600'
UTILITY KEY MAP
C-208
DWG. 43 OF 127
Don Cloud
Don Text Box The riser and 18" outlet pipe do not match the detail on sheet C-507
Don Arrow
Jeremiah Sunwoo Text Box A: Use Detail - A
Revisions Date
Approved: Director, Project Management Service
Approved: Director, Office of Construction Management
Drawing Title
OfDwg.
Building Number
Location
Project Title
Checked DRAWING NO.
Project No.
Date
Drawn
892CM3036
Pl ott ed : 5
/11 /20 at 1:
pm
B y:
jsu nw oo Fil e:
L:\
1.0
Pr oje cts \20
-0
4 -
M ira ma r N
C Ph as e I
I\A
CA
D\ Pl an s\B id Do cs \89
2C M3
6-
Ci vil
U tili ty Pr ofi le
Sh ee ts.
dw g
ENGINEER OF RECORDCONSULTANTS
BID DOCUMENTS
TERRACON
1421 EDINGER AVENUE, SUITE C
TUSTIN CA 92780
(949) 383-1990
2 2 5 M i l l e r A v e n u e , M i l l V a l l e y , C A 9 4 9 4 1 T 415 383 7900 F 415 383 1433 www.rhaa.com
MAY 2020
MIRAMAR NATIONAL CEMETERY
5795 NOBEL DRIVE
SAN DIEGO, CALIFORNIA 92122
COLUMBARIUM AND CREMAINS
EXPANSION
ENGINEERED WITH LAYTON
1490 S PRICE RD, SUITE 215
CHANDLER, AZ 85286 NA NEL JHS
C-303
STORM DRAIN PROFILE 2
DWG. 49 OF 127
Don Cloud
Don Text Box Where is the 36" pipe, headwall and rip rap shown on sheet C-507?
Jeremiah Sunwoo Text Box A: 18" Pipe is intended, see C-507
C-507
DRAIN DETAILS 3
Revisions Date
Approved: Director, Project Management Service
Approved: Director, Office of Construction Management
Drawing Title
OfDwg.
Building Number
Location
Project Title
Checked DRAWING NO.
Project No.
Date
Drawn
892CM3036
Pl ott ed : 5
/11 /20 at 2:
pm
B y:
jsu nw oo Fil e:
L:\
1.0
Pr oje cts \20
-0
4 -
M ira ma r N
C Ph as e I
I\A
CA
D\ Pl an s\B id Do cs \89
2C M3
6-
Dr ain
D eta ils 3.
dw g
ENGINEER OF RECORDCONSULTANTS
BID DOCUMENTS
TERRACON
1421 EDINGER AVENUE, SUITE C
TUSTIN CA 92780
(949) 383-1990
2 2 5 M i l l e r A v e n u e , M i l l V a l l e y , C A 9 4 9 4 1 T 415 383 7900 F 415 383 1433 www.rhaa.com
MAY 2020
MIRAMAR NATIONAL CEMETERY
5795 NOBEL DRIVE
SAN DIEGO, CALIFORNIA 92122
COLUMBARIUM AND CREMAINS
EXPANSION
ENGINEERED WITH LAYTON
1490 S PRICE RD, SUITE 215
CHANDLER, AZ 85286 NA NEL JHS
DWG. 61 OF 127
Don Cloud
Don Text Box Not shown on plan sheet C-207
Don Arrow
Don Cloud
Don Cloud
Don Text Box Do not match
Don Arrow
Don Cloud
Don Text Box Riser detail, assuming it is to be cast-in-place
Don Arrow
Jeremiah Sunwoo Text Box A: Confirmed
Jeremiah Sunwoo Text Box A: Use Detail - A
Jeremiah Sunwoo Text Box A: 18" Pipe is intended. Riser is shown on C-207, headwall/riprap is shown on C-206.
Jeremiah Sunwoo Text Box A: Use Detail - A
Jeremiah Sunwoo Arrow